Chino Valley Unified School District: 2016 Long Range Facilities Master Plan Draft: June 2016.

Slides:



Advertisements
Similar presentations
2010 MEASURE C FACILITIES IMPROVEMENT PROGRAM Proposed Implementation Plan September 14, 2010.
Advertisements

Draft FMP Priorities For Discussion Facilities Committee 3/5/13.
June 8, 2011 Irvine Unified School District. What is a Modernization? Eligibility Permanent buildings - 25 years old Portable buildings - 20 years old.
The Big Picture Brand-new library / media center building Brand-new kinder classroom building Brand-new kinder playground and covered pavilion Renovated.
NEW PALTZ CENTRAL SCHOOL DISTRICT Comprehensive Facilities Master Plan – Progress Report Summary.
Measure G Information August 2014 Enhancing Educational Opportunities at every school in Norwalk and La Mirada.
Cambrian School District 5-year Facilities Maintenance Plan Update 8/25/11.
May 6, 2010 Irvine Unified School District HMC Architects.
Yelm Community Schools  We are at a critical need for safety/security upgrades, more classroom space, and building improvements. ◦ Student growth:
ELEMENTARY PLAYGROUND EQUIPMENT THOUGHTS and IDEAS.
Board Update November 21, What is Tower Pinkster's Charge? 1.To assess the existing conditions of the Portage Public School Buildings and Sites.
January – May 2013 Existing Curriculum and Space Needs Summary Facilities staff meets individually with all school principals, as well as Academics and.
Panther Pride Association Softball Field Planning School Board Meeting 9/10/2012.
Accredited with “Distinction in Performance” St. Clair R-XIII School District.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 14, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Lory Student Center Theatre Renovation. PROJECT OVERVIEW  LSC Master Plan, Phase II - Student, Stakeholder, & Staff Involvement (completed March 2010)
HIGHLAND PARK BOND WORK The final results will be AMAZING!
The Oaks Public School Proposed Library refurbishment.
Master Plan Update Chapter 213 of the Local Government Code provides that Cities may engage in Comprehensive Planning which may:  include but not be limited.
S.M.A.R.T. Project Proposal December 9, 2014 Referendum.
Fremont Unified School District Board Report Draft March 14, 2012 B&F 17 1.
Space Utilization Project Chandler Unified School District 2010.
Bond Expenditure Report Per A.R.S. § (K) 7/1/13 - 6/30/14.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
Introduction to the Rochester City School District Facilities Modernization Program Browncroft Neighborhood Association October 11, 2006.
Joint City Council – School Board Meeting July 12, 2012 Maintaining Temple City’s Excellent, Award-Winning Schools.
ESPLOST Savannah-Chatham County Public Schools July 5, 2006.
ESPLOST Update Savannah-Chatham County Public Schools May 17, 2006.
Advocacy: Influencing Facility Development in Public Parks and Recreation Departments Tennis advocacy should occur year round through informal communications.
Successful Bond Programs (Community Engagement) Cathy Allen, Chief Operations Officer Facilities Support Services September 22,
1 Agenda February 15, 2007 Facilities Advisory Committee 1)Call to Order – Paul Stansberry & Kevin Max 2)Option 3 – Plan & Costs 3)Operating Costs 4)Timeline.
Deerfield Elementary School Deerfield Elementary Overview of Deerfield Renovation October 8, 2015.
USF System Campus Master Plan Updates October 20, 2015 St. Petersburg.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 26, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Facilities Master Plan and Projects Update Encinitas Union School District February 15, 2005.
Municipal Center Needs Analysis City of New Carrollton 100% Final Report MCA # /13/2015 Introduction Needs Analysis Existing Facility Analysis Process.
ESPLOST Update Savannah-Chatham County Public Schools January 9, 2008.
Proposition S “Students First” Election Day, Tuesday, April 5.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
DEFERRED MAINTENANCE PROGRAM UPDATE REPORT Accomplishments and 2016 Planned Events October 1,
PLEASANT VIEW PARK DRAFT MASTER PLAN Neighborhood Meeting, November 16, 2010.
ESPLOST Update Savannah-Chatham County Public Schools December 5, 2007.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District March 3, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Planning for “capital” levy and future “capital” bonds What do you think? CRC staff meeting October 6, 2015 Everett Public Schools 1.
CHAPEL HILL PARKS & RECREATION Comprehensive Parks Plan Chapel Hill Greenways Master Plan.
30 West Arrellaga Street, Santa Barbara, CA Phone: Telephone Road, Ventura, CA Phone: Kruger Bensen Ziemer Architects,
FY2017-FY2026 GDRSD Capital Plan-June 22, 2016 Jared Stanton, Director of Business and Finance.
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education Update August 28,
MANASQUAN PUBLIC SCHOOL DISTRICT
Cambrian School District March 19, 2015
Capital Construction Bond Program
BOND ELECTION PROPOSAL November 12, 2013
Mt. Diablo Unified School District Modernization Community Input Meetings On behalf of the Mt. Diablo Unified School District, we would like to invite.
LOMPOC UNIFIED SCHOOL DISTRICT - BOARD UPDATE
MIRACOSTA COMMUNITY COLLEGE DISTRICT
Worcester Public Schools Study and Master Plan
May 8, 2018 Bond Program.
Wauwatosa School District
REEF SUNSET UNIFIED SCHOOL DISTRICT
DOVER ELEMENTARY Existing MPB (2/14/12).
Chino Valley Unified School District
Update to Board of Trustees: November 9 FAC Meeting
Charter Oak Unified School District
A Message from Napa Valley College Governing Board of Trustees President Mary Ann Mancuso and Superintendent Dr. Ronald Kraft For the past year, as we.
Capital Outlay Workshop
Meeting With Public January 30, 2019
Draft Bond Work Plan A Presentation to the
Kings Park Central School District
FY Capital Improvement Program Draft
Presentation transcript:

Chino Valley Unified School District: 2016 Long Range Facilities Master Plan Draft: June 2016

Chino Valley Unified School District: 2016 Long Range Facilities Master Plan Draft: Process: 1. Site tours 2. Data collection 3. Site/Community engagement (Principals, Site Staff) 4. District meetings (Superintendent/Cabinet/Department Heads) 5. Diagramming 6. Cost Estimating June 2016

Chino Valley Unified School District: 2016 Long Range Facilities Master Plan Draft: June 2016 Product: 1. Introduction: Trends, themes, CVUSD messaging 2. Site descriptions/narratives 3. Input summary 4. Site diagrams (existing and proposed) 5. Master Project List Cost Estimates

Chino Valley Unified School District: 2016 Long Range Facilities Master Plan Draft: June 2016 Guiding Principles: 1. S: (safety/security): single entry point, access control, fencing 2. T: (technology): 21 st century upgrades and furnishings 3. E: (evolution): modernization, TK, ‘maker’ labs 4. M :(maintenance):roofing, HVAC, phones, playgrounds 5. P: (parity): portable replacement 6. S: (sustainability):solar panels, EMS, irrigation systems

Chino Valley Unified School District: 2016 Long Range Facilities Master Plan Draft: June 2016 Proposed Actions: 1. New construction : “Build something we don’t have.” 2. Renovation: “Repurpose something we do have.” 3. Site and grounds : “Play fields, parking lots, playgrounds, fencing.” 4. Furniture, technology and systems : “Update the instructional program to align with 21 st century learning styles and practices.”

Chino Valley Unified School District: 2016 Long Range Facilities Master Plan Draft: June 2016 Master Site Diagram: Elementary School Example Diagram

Chino Valley Unified School District: 2016 Long Range Facilities Master Plan Draft: June 2016 Master Site Diagram: Junior High School Example Diagram

Chino Valley Unified School District: 2016 Long Range Facilities Master Plan Draft: June 2016 Master Site Diagram: High School Example Diagram

Chino Valley Unified School District: Master Project List Cost Estimate: CVUSD Total Facilities Master Plan Cost Multipliers CVUSD Space Inventory June 2016 Chino Valley Unified School District: 2016 Long Range Facilities Master Plan Draft:

Chino Valley Unified School District: 2016 Long Range Facilities Master Plan Draft: Master Project List Cost Estimate: Modernization Renovation Portable Replacement Building Additions Site Improvements Furniture Technology Total Master Plan as Diagrammed Potential State Funding Reimbursement: CVUSD Net Investment: $120,000,000 $112,000,000 $235,000,000 $353,000,000 $126,000,000 $28,000,000 $55,000,000 $1,029,000,000 $74,000,000 $955,000,000 June 2016

Chino Valley Unified School District: 2016 Long Range Facilities Master Plan Draft: Master Project List Cost Estimate: June 2016

Chino Valley Unified School District: 2016 Long Range Facilities Master Plan Draft: Master Project List Cost Estimate: June 2016

Chino Valley Unified School District: 2016 Long Range Facilities Master Plan Draft: Master Project List Cost Estimate: June 2016

Chino Valley Unified School District: 2016 Long Range Facilities Master Plan Draft: Master Project List Cost Estimate: June 2016

Chino Valley Unified School District: 2016 Long Range Facilities Master Plan Draft: June 2016 Guiding Principles: 1. S: (safety/security): single entry point, access control, fencing 2. T: (technology): 21 st century upgrades and furnishings 3. E: (evolution): modernization, TK, ‘maker’ labs 4. M :(maintenance):roofing, HVAC, phones, playgrounds 5. P: (parity): portable replacement 6. S: (sustainability):solar panels, EMS, irrigation systems

Chino Valley Unified School District: 2016 Long Range Facilities Master Plan Draft: June 2016