1 Phase Camera CRE S. Bigotta, L. Bonelli, A. Di Lieto, A. Toncelli, M.Tonelli INFN – Pisa University P. La Penna EGO.

Slides:



Advertisements
Similar presentations
FINESSE FINESSE Frequency Domain Interferometer Simulation Versatile simulation software for user-defined interferometer topologies. Fast, easy to use.
Advertisements

T1 task- update Mike Plissi. 2 Collaboration Groups actively involved INFN-VIRGO MAT IGR-Glasgow Groups that have expressed interest INFN-AURIGA CNRS-LKB.
Cascina, January 25th, Coupling of the IMC length noise into the recombined ITF output Raffaele Flaminio EGO and CNRS/IN2P3 Summary - Recombined.
LEReC Laser Controls & RF Requirements Brian Sheehy 10/31/13 Laser timing Laser design RF and Control Needs.
Koji Arai – LIGO Laboratory / Caltech LIGO-G v2.
Optical simulation – March 04 1 Optical Simulation François BONDU VIRGO Tools Goals Example: tuning of modulation frequency A few questions.
LIGO-G W Proposed LHO Commissioning Activities in May 02 Fred Raab 29 Apr 02.
NSF : Nov. 10, LIGO End to End simulation overview  Time domain simulation written in C++  Like MATLAB with Interferometer toolbox  Major physics.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
COMMISSIONING PROGRESS G.LOSURDO – INFN Firenze for the Virgo Collaboration.
High-speed ultrasensitive measurements of trace atmospheric species 250 spectra in 0.7 s David A. Long A. J. Fleisher, D. F. Plusquellic, J. T. Hodges.
Concepts for Combining Different Sensors for CLIC Final Focus Stabilisation David Urner Armin Reichold.
G D Initial LIGO improvements & Advanced LIGO P Fritschel PAC Meeting LLO, 18 May 2005.
RF Synchronization Activity at SPARC A.Gallo and D. Alesini, M. Bellaveglia, R. Boni, G. Di Pirro, A. Drago, A.Ghigo P. Baldini, L. Cacciotti, M. Scampati,
1 Ist Virgo+ review Cascina H. Heitmann Alignment: Virgo+ changes.
Stefan Hild October 2007 LSC-Virgo meeting Hannover Interferometers with detuned arm cavaties.
Advanced VIRGO WG1: Status VIRGO, Cascina Andreas Freise University of Birmingham.
LISA October 3, 2005 LISA Laser Interferometer Space Antenna Gravitational Physics Program Technical implications Jo van.
TELECOMMUNICATIONS Dr. Hugh Blanton ENTC 4307/ENTC 5307.
Squeezed light and GEO600 Simon Chelkowski LSC Meeting, Hannover.
G Z LIGO R&D1 Input Optics Definition, Function The input optics (IO) conditions light from the pre- stabilized laser (PSL) for injection into.
G Z AJW for Marcus Benna, Cambridge Wavefront Sensing for Advanced LIGO Model of wavefront sensing in a dual- recycled interferometer Consequences.
Advanced Virgo Optical Configuration ILIAS-GW, Tübingen Andreas Freise - Conceptual Design -
LSC-VIRGO joint meeting - Pisa1 Input mirrors thermal lensing effect Frequency modulation PRCL length in Virgo Some results from a Finesse simulation.
Phase camera development for gravitational wave detectors
CALVA : A test facility for Lock Acquisition F.Cavalier 1 on behalf of CALVA team : M.-A.Bizouard 1, V.Brisson 1, M.Davier 1, P.Hello 1, N.Leroy 1, N.Letendre.
Paolo La Penna Injection optics for Advanced VirgoLSC/VIRGO joint meeting, Cascina, 25/05/ Advanced VIRGO Input optics LIGO-G Z.
1 1.Definition 2.Deliverables 3.Status of preliminary design 4.Risks 5.Tasks to be done 6.Decisions to be taken 7.Required simulations 8.Planning ISC workshop:
1 The Virgo noise budget Romain Gouaty For the Virgo collaboration GWADW 2006, Isola d’Elba.
Status of the Advanced LIGO PSL development LSC Virgo meeting, Caltech, March 2008 LIGO G Z Benno Willke for the PSL team.
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
Stefan Hild 111th WG1 meeting, Hannover, January 2007 DC-Readout for GEO Stefan Hild for the GEO-team.
“Detector activities” after the IB upgrade Michele Punturo.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
1 Locking in Virgo Matteo Barsuglia ILIAS, Cascina, July 7 th 2004.
Cascina, Nov. 4 th, 2008 AdV review 1 AdV Injection system E. Genin European Gravitational Observatory.
The road to 10 dB Kate Dooley, Emil Schreiber GWADW, Girdwood, May LIGO-G
Caltech, February 12th1 Virgo central interferometer: commissioning and engineering runs Matteo Barsuglia Laboratoire de l’Accelerateur Lineaire, Orsay.
1 DC readout for Virgo+? E. Tournefier WG1 meeting, Hannover January 23 rd,2007 DC vs AC readout: technical noises Output mode cleaner for DC readout.
Monica VarvellaIEEE - GW Workshop Roma, October 21, M.Varvella Virgo LAL Orsay / LIGO CalTech Time-domain model for AdvLIGO Interferometer Gravitational.
Alessio Rocchi INFN Roma Tor Vergata Thermal Compensation System for Virgo+
High precision phase monitoring Alexandra Andersson, CERN Jonathan Sladen, CERN This work is supported by the Commission of the European Communities under.
The VIRGO detection system
FINESSE FINESSE Frequency Domain Interferometer Simulation Andreas Freise European Gravitational Observatory 17. March 2004.
Stefan Hild 1GWADW, Elba, May 2006 Experience with Signal- Recycling in GEO 600 Stefan Hild, AEI Hannover for the GEO-team.
April 12 | Comparison of Sophisticated Synthesizer Concepts and Modern Step Attenuator Implementations | 2 Comparison of Sophisticated Synthesizer Concepts.
The Proposed Holographic Noise Experiment Rainer Weiss, MIT On behalf of the proposing group Fermi Lab Proposal Review November 3, 2009.
Calva update Nicolas Leroy for the CALVA group (LAL, ESPCI, LAPP, LMA) Main Laser Cavity 1Cavity 2 Aux. Laser L1 L2 M1M2M3.
Date of download: 7/1/2016 Copyright © 2016 SPIE. All rights reserved. (a) Simplified sketch of the setup. Some beam guiding mirrors, optical isolators,
Calibration and the status of the photon calibrators Evan Goetz University of Michigan with Peter Kalmus (Columbia U.) & Rick Savage (LHO) 17 October 2006.
Complex Optical Modulation Volker Quetschke, Guido Mueller, David Reitze, David Tanner an extension of work done at UF for LIGO in 1997 by Qi-Ze Shu Department.
Advanced SA Specifications & Scientific Motivations S.Braccini, Cascina 21 Settembre 2007.
Weiming Guo Accelerator Physics Group / ASD Advanced Photon Source
The Proposed Holographic Noise Experiment
RF Synchronization Activity
VIRGO–KAGRA Meeting about bottom filter damping
Progress toward squeeze injection in Enhanced LIGO
Evolution of the Virgo detector: The Virgo+ plans
AWAKE proposals for BE/BI
Phase Camera hardware Nothing really new, only summarising status
Overview Communication is the transfer of information from one place to another. This should be done - as efficiently as possible - with as much fidelity/reliability.
Superattenuator for LF and HF interferometers
Design of Stable Power-Recycling Cavities
Homodyne readout of an interferometer with Signal Recycling
Thermal lensing effect: Experimental measurements - Simulation with DarkF & Finesse J. Marque (Measurements analysis: M. Punturo; DarkF simulation: M.
Advanced Research Electron Accelerator Laboratory
LIGO Scientific Collaboration
P Fritschel LSC Meeting LLO, 22 March 2005
RF readout scheme to overcome the SQL
Presentation transcript:

1 Phase Camera CRE S. Bigotta, L. Bonelli, A. Di Lieto, A. Toncelli, M.Tonelli INFN – Pisa University P. La Penna EGO

Motivation Thermal lensing effects are posing serious limitations to the correct operation of Virgo interferometer, limitations that demand a prompt solution. The study of the RF sidebands could give a better understanding of the problem, solving thermal lensing issues and eventually optimizing the sensitivity of the VIRGO detector  a spectrum analyzer (SFP) for the Virgo beam have already been set up  phasecamera is natural evolution and enhancement of the SFP (improved frequency resolution, spatial info about amplitude and phase of each sideband)

to keep the scheduling time as short as possible, the proposed phasecamera will be an adaptation of the LIGO project to the VIRGO needs a great amount of information is readily available, and, more important, we don’t have to start from scratch in the realization of this device Technical description The test field is superposed on a reference field Two galvanometers move the beams over the surface of a photodetector A demodulator gives the spatial amplitude and phase of any frequency component of a laser field

4 Task 1: phase locking This task includes the study of the control electronics. The possible choices for the control loop include homemade controller (low cost but need some time and manpower)homemade controller (low cost but need some time and manpower) modification of commercially available controllers such as, for instance, those sold by Toptica ( ) (higher cost (~8000 €), but should be less consuming in terms of time and manpower).modification of commercially available controllers such as, for instance, those sold by Toptica ( ) (higher cost (~8000 €), but should be less consuming in terms of time and manpower).

5 Task 2: Realization of the detector 6.26MHz 10MHz 6.26MHz 10MHz 6.26MHz 10MHz The use of the programmable frequency synthesizer will allow to keep the reference laser to always locked to the carrier of the test laser ref laser test laser PLL programmable synthesizer IF amp PD2 PM /2 PD1 pinhole band pass filter LO (90 o ) RF (0 o ) I Q

6 Task 2bis: Implementation of the galvanometers In this task we should implement the galvanometer system being developed by the INFN group of Napoli. The exact nature of this task haven’t yet been investigated. The delay introduced by this task in the implementation plan must be investigated.

7 Task 3: Realization of the test beam generator Frequency stabilization ~100 kHz Difficult to adapt to simulate VIRGO parameters Time & money consuming

8 Task 3: Realization of the test beam generator Scenario a: test beam without the MC cavity In this scenario the test beam generator is realized, but in a different way with respect to the work done by Goda et al. The technical specifications of the Mephisto laser from InnoLight state that the frequency drift of this device is less than 1 MHz/min. Since the phasecamera is expected to perform a single acquisition in less than 200 ms, this means a maximum drift of few kHz during the scan. It would be easier, faster and more affordable to test the phasecamera without cleaning the test beam. A simple phase modulation of the test beam by means of an electro-optical modulator should be enough for our purposes. Scenario b: no test beam is used, test of the detector on site In this scenario the test beam generator is not realized and the phasecamera is tested directly on the detection bench. Obviously there’s nothing to do on this task for this scenario.

9 Task 4: Testing & tuning of the phasecamera Both the scenarios In this task the testing and the tuning of the phasecamera will be performed. The device will be checked to be compliant to the VIRGO requirements. The phasecamera is not expected to influence the other devices on the detection bench (it requires, however, a new optical layout of the detection bench in order to free some space on it). Scenario b Contrary to scenarios a, this scenario will involve a massive use of shifts on the detection bench to tune the device and will interfere with VIRGO normal commissioning. This fact is a serious drawback of this scenario and should be taken into account.

10 People M. TonelliINFN, Pisa UniversityAssociate professor S. BigottaINFN, Pisa Universitypostdoc L. BonelliINFN, Pisa UniversityPhD student A. Di LietoINFN, Pisa UniversityAssociate professor A. ToncelliINFN, Pisa Universityresearcher P. La PennaEGO

11 Planning [1] [1] This task may delay the implementation plan Implementation Plan Tasks and DeliverablesJulAugSepOctNovDecGenFeb Tasks Lasers and phase-locking electronics set-up Realization of the detector itself Implementation of the galvanometers [1] [1] Realization of the test beam generator(scenario a) Testing & tuning of the phasecamera(scenario a) Realization of the test beam generator(scenario b) Testing & tuning of the phasecamera(scenario b) Deliverables Phasecamera(scenario a) Phasecamera(scenario b)

12 Involved Virgo sub-systems and EGO infrastructure # InfrastructureDescription of the involvement OpticsLaboratory, equipment, participation to test and installation Mechanical workshopHelp with mechanical part and assemblies ElectronicsHelp with the control electronics #Subsystem NameDescription of the involvement 1Detectionnew optical layout 2Electronics and Software 3Data acquisition

13 Budget #ItemContractor / supplier Cost (€)Charged to (EGO/Virgo) 2Mephisto laser 200 mWInnoLight45,00020,000 2Galvanometers6,000 Mirrors, mirror mounts and breadboard 4,000 EO modulator5,000 Electronics and detectors13,000 2Beam expanderLinos2,000 Optics4,000 Total cost (€): 79,000 Request to EGO (€) 54,000