RICH Readout Plans F. Bucci, M. Piccini on behalf of the RICH WG.

Slides:



Advertisements
Similar presentations
Status of the LAV electronics G. Corradi, C. Paglia, D. Tagnani F. Gonnella, M. Raggi INFN LNF F. Gonnella, M. Raggi INFN LNF Photon Veto WG CERN 13/12/2011.
Advertisements

CLAS12 – RICH PARAMETERDESIGN VALUE Momentum range3-8 GeV/c  /K rejection factor Not less than 500  /p rejection factor Not less than 100 Angular coverage5.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
LKr readout: present and future R. Fantechi 30/8/2012.
RICH 17 m Beam Pipe Mirrors Separate pions from muons
Inter TEL62 communication M. Raggi, M. Piccini, F. Gonnella 16 th October 2013 TDAQ Working Group Meeting.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
Readout electronics for the MUV detectors R. Fantechi 28/3/2012.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
“TDAQ for 2012 runs” Gianluca Lamanna (CERN) Annual review meeting
Experimental set-up for on the bench tests Abstract Modeling of processes in the MCP PMT Timing and Cross-Talk Properties of BURLE/Photonis Multi-Channel.
TELL-1 and TDC board: present status and future plans B. Angelucci, A. Burato, S. Venditti.
Overview, remarks, lamentations, hope and despair M. Sozzi TDAQ WG meeting CERN - 4 June 2013 Introduction, news and appetizer.
Update on CHANTI F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Napolitano, L. Roscilli, G. Saracino Università degli Studi di Napoli «Federico.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
General News M.Lenti. Outlook Reminder of the RICH schedule PMs and sockets: what we have Mirrors What would change for PM holding disks if vacuum inside.
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
The RICH Detectors of the LHCb Experiment Carmelo D’Ambrosio (CERN) on behalf of the LHCb RICH Collaboration LHCb RICH1 and RICH2 The photon detector:
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
Preparation of chamber training g. passaleva. Gaps to be trained We have O (100) gaps that have tripped at least once since June At a quick glance they.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
“Planning for Dry Run: material for discussion” Gianluca Lamanna (CERN) TDAQ meeting
TEL62 AND TDCB UPDATE JACOPO PINZINO ROBERTO PIANDANI CERN ON BEHALF OF PISA GROUP 14/10/2015.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
FW and HW Status TDAQ WG 10/6/2015. Hardware MPOD: ◦ HV was NOT floating   Sensibility of current limit to external devices  Particularly for chamber.
BRANs Sune Jakobsen (BE-BI-PM) LHC BI 2015 summary
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
S.MonteilPS/SPD COMMISSIONING1 HW Maintenance – JANUARY Clermont team Outline: 2009: restart the system: few observations. Hw maintenance C-side:
TDAQ news and miscellaneous reports M. Sozzi NA62 TDAQ WG meeting CERN – 13/7/2011.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
TDAQ Working group meeting Mainz – 8/9/2011 Where do we stand? Where do we go?
TELL1 readout in RICH test: status report Gianluca Lamanna on behalf of TDAQ Pisa Group (B.Angelucci, C.Avanzini, G.Collazuol, S.Galeotti, G.L., G.Magazzu’,
TDC/TEL62 update M. Sozzi NA62 TDAQ WG meeting Bruxelles – 9/9/2010.
CDMS II Shielding To Installation To Construction From Design.
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
R. Fantechi 2/09/2014. Milestone table (7/2014) Week 23/6: L0TP/Torino test at least 2 primitive sources, writing to LTU, choke/error test Week.
LAV electronics status report Mauro Raggi and Francesco Gonnella TDAQ meeting NA62 Collboration Meeting 1-5 September 2014 Ferrara.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Faculty of Physics, University of Belgrade Collaboration board meeting 31 th of January, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
V.Duk, INFN Perugia1 CHOD/NHOD status Viacheslav Duk, INFN Perugia Ferrara,
“Technical run experience” Gianluca Lamanna (CERN) TDAQ meeting
Gu Minhao, DAQ group Experimental Center of IHEP February 2011
SHMS Aerogel Detector Construction is complete
INSIDE in-beam PET system assembly and test at INFN Torino
LKr status R. Fantechi.
CLAS12 – RICH RICH - TECHNICAL PARAMETERS PARAMETER DESIGN VALUE
LAV front-end and readout status
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
Commissioning and Calibration Strategies for Micromegas Vertex Tracker
RD51-WG X June test beam experience: useful information for October
G.Lamanna (CERN) NA62 Collaboration Meeting TDAQ-WG
Performances of the NA62 RICH detector
Performances of the NA62 RICH Detector
TDCB status Jacopo Pinzino, Stefano Venditti
Pierluigi Paolucci - I.N.F.N. Naples
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Testbeam status report
CSC Electronics Installation and Commissioning Oct ‘06
Presentation transcript:

RICH Readout Plans F. Bucci, M. Piccini on behalf of the RICH WG

Remarks The NA62 RICH did not take part both in the dry run and the technical run The RICH TEL62 has been used by the RICH group for the CHOD The RICH hasn’t had yet the chance of setting up and test its final readout system. TDAQ WG meeting, 11/12/2012 F. Bucci2

Electronics to be tested Need to test the 2000 PMs all together with the full electronics chain: New HV dividers New HV distribution boards CAEN SY1527 and boards New FE (NINO) boards New DAQ system based on TEL62 TDAQ WG meeting, 11/12/2012 F. Bucci3

First Step Exploit the COSMORICH setup to test 414 PMs all together with a DAQ system based on the TEL62 board Aim: Set up the RICH DAQ system based on the TEL62 (adapt the CHOD firmware for the RICH case and test the RICH firmware in a multi-channel environment) TDAQ WG meeting, 11/12/2012 F. Bucci4

The COSMORICH Set Up A proximity focusing Cherenkov detector for cosmic rays TDAQ WG meeting, 11/12/2012 F. Bucci Aerogel bricks as radiator RICH prototype spherical mirror used in ‘flat mode’ RICH prototype Winston cones and PMs disks to collect and detect the reflected light  mirror air Winston Cones disk PM disk aerogel 40 cm “vessel” light tight, not gas tight

The COSMORICH Set Up TDAQ WG meeting, 11/12/2012 F. Bucci6

Modify the COSMORICH Set Up Remove the aerogel bricks and use a laser to illuminate all the PMs TDAQ WG meeting, 11/12/2012 F. Bucci7  mirror air Winston Cones disk PM disk aerogel

Hardware Count In Florence: 1 TELL1 and 4 TDCB V2 used in the 2009 RICH test beam 15 ‘old black’ cables used in the 2009 RICH test beam In Perugia: 1 TEL62, 2 TDCB V4 and 8 ‘new’ cables (requiring patch panels) used in the next few months to test the PMs TDAQ WG meeting, 11/12/2012 F. Bucci8 Still missing: 2TDCB V.4 2 patch-panels to match the 24 channels multiplicity of the old NINO boards to the 16 channels multiplicity of the TEL62 8 ‘new’ cables from the patch panels to the TEL62 1 TEL62 in Florence with at least 1 TDCB V4 to start setting up the test system (borrow one under repair when available)

Next Step Build a closed box (say 1.5x1.0x2.0 m), light tight, where on one side the two “PM lodging” disks with the 2000 PMs can be “plugged” and on the opposite side a pulsed laser can be inserted Aim: Test all the chain (new HV dividers, new HV distribution boards, new FE boards) Same cabling and almost same distances as in the final detector Calibrate (t0s, slewing) all the PMs: first alignment before RICH installation Advanced aim: Make the TEL62 boards talk to each other to build the L0 primitives TDAQ WG meeting, 11/12/2012 F. Bucci9

Setup for PMs+electronics Test in Lab SY1527 Rack 3 Laser 1000 PMs 1.5 m HV patch FE NINO FE Nino HV patch 2 m Rack 1 HV patch FE NINO FE Nino HV patch Rack 2 DAQ TEL62 Closed Box

Hardware Timescale HV dividers: beginning of 2013 HV distribution boards: beginning of 2013 FE (NINO) boards: end of spring 2013 FE crates to be bought (2013) TEL62 and TDCBs to be bought (2013) TDAQ WG meeting, 11/12/2012 F. Bucci11

Conclusions Next year we need to set up and test the RICH final readout system: the 2000 PMs all together with the full electronics chain. The whole set up not ready before the summer. The COSMORICH is an already available experimental set up which allows to adapt and develop the CHOD firmware for the RICH case. Keen to have a TEL62 and at least 1 TDCB in Florence as soon as they are available to test the read out chain in a high rate and high multiplicity environment. TDAQ WG meeting, 11/12/2012 F. Bucci12