David BAILLEUX On behalf of the Caltech group Issues for the Laser Monitoring System M&O - US CMS ECAL IB meeting 19 March 2009 - Chilled water supply.

Slides:



Advertisements
Similar presentations
Poseidon 4002 Rack monitoring 1. Poseidon: Monitor & Control 2.
Advertisements

Status at DORIS Hall June 28th start of mounting the Al- frames, progressig very fast, finished by July 9th All 8 coils pressure tested with 15 bar = O.K.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
Maggie Alvarado Diego Azevedo Raphael Santos Cavalcanti Natalie Levings Richard Robards Bruno Vieira.
S A Griffiths Target Review Jan 2009 Target Electrical / Control Schematic HexBridge Power electronics Interface PSU Capacitor Bank Local Control Interface.
21/01/02 - ECAL Cooling - Arnaud Hormiere ST/CV 1 Development of ECAL COOLING PLANT Application to a Super Module.
P. 1Mario Deile – TOTEMino: Infrastructure Status and Schedule Mario Deile Zone 2.Gas system 3.Cabling 4.Cooling water 5.Counting-Room 6.Safety.
1 1 KPS Leak Detection No maintenance and perfect for retro-fit.
LIGO-G W eLigo PSL laser diode room strawman design Rick Savage, Anamaria Effler, Peter King.
David BAILLEUX US CMS on behalf of the Caltech group Laser Monitoring System - Electronics review 20 March Overview Overview Laser control Laser.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
19 May 09P. Tropea1 Fluorocarbon systems –SS1 hydraulics completed, now under commissioning –SS2 connections and sensors installation done –Pixels ready.
Active gas system status. S.Konovalov, K.Zhukov. Active gas system operation. S.Konovalov "Active gas system..."TRT Overview  Good design.
1 Choice of the cleanroom Laser specifications  class 10,000 b) Softwall cleanroom Entire room = cleanroomLaser size = cleanroom Entire room = cleanroom.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire SSD/SDD Proposal Upgrade 30/08/2012
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 12/10/2005 LHCb - Install Meeting 12/10/05 TS/CV/DC Installations STATUS Ongoing works 1.chilled / mixed.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
CALO News Pascal Perret LPC Clermont 22 January 2012.
Introduction of Laser Evaluating Technology to Street Leak Surveys Ashraf Salha APA Group Gas Speak Colloquium September 2015.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
TEST FACILITY STATUS FOR TESTING CERN Marta Bajko WP10. EUCARD 2 Task 4 - HTS Magnet Tests, June 2015.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
ELENA installation progress F. Butin / ELENA collaboration.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
S A Griffiths CM42 June 2015 Electrical & Control.
Poseidon 4002 Rack monitoring.
Demineralised water cooling system
CBETA Technical Review
1.3-GHz Cavity Vacuum Furnace at IB4
ELENA installation and commissioning status
Electrical & Control.
Huawei Digital Pipeline Solution
Laser Monitoring System On behalf of the Caltech group
Project Manager’s Report + DC/MoM Report
2011/ 07/06 Jacqueline Yan IPBSM
ITS Cooling: Xmas Plan Claudio Bortolin.
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
352MHz Klystron Control for the 3MeV Linac test stand
M.Tavlet, H.Taureg - ALICE
DT Infrastructure: LV, HV, Gas
Magnet Safety System for NA61/Shine
Facility upgrade Housekeeping, rad waste segregation, chemicals, safety issues, new configurations. Please see me or Keith.
K. Foraz on behalf of OSS members
PRESENTATION ON MPT ICS SYSTEM
Pinole-Hercules Water Pollution Control Plant Upgrade Project
TEST PLANS for HL LHC IT STRING
Question & Suggestions March 17th
November technical stop activities:
On behalf of the Caltech Laser Group
Laser Monitoring System since installation at pt5
Ola Ingemansson Electrical & Instrumentation Engineer
Needed for Team A on -End
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

David BAILLEUX On behalf of the Caltech group Issues for the Laser Monitoring System M&O - US CMS ECAL IB meeting 19 March Chilled water supply Residual B field effect Laser system DCS Spare parts and upgrade

Laser System M&O Chilled Water Supply  Status during July 2008 cooling meeting: Pipe work completed; work started on pumping station; Electrical control box ordered.  Pumping station tested in February, 2009, for one laser: - Only one pump is working (another piece in reparation); - Low pressure alarm not working: pump still ON  leak detection not working; - Missing bypass as it was installed in H4  else the pump stopped if there is no water flow; - DCS not tested ( notification etc.) - Missing electrical connection for barracks control.  Up to now: Mixed water used for lasers cooling (racks) : dirty water, no leak detector.  Water leak may happen as in the past: consequence for all racks ? Responsibility? Is laser can still work the night and weekend like this ? 19 March Task follow by TS/CV : not schedule yet. Werner and Wolfgang are aware of that.

Residual B Field Effect One new digital infrared viewer ordered and received.….… One digital scope with LCD display in hand ………………………. One power meter ordered and received ……………………….…. One AC control unit has to be moved inside the room …….  Shielding around power supply and pump laser (lamp) ……  Interlock on laser lamp when B is on fast variation.………….  Laser System M&O 19 March A meeting on February 12 approved following solutions: Will be tested in June when B filed resumes. If successful  2 more DSO and instruments will be ordered Planned: waiting.. To be planned. Wolfgang has to put this on agenda.

DCS for the Laser System Priority need to be defined:  Room temperatures: CANbus installed, waiting connection and read out via central DCS.  Laser settings: Laser settings should be online and recorded DCS/PVSS (current, delay, ect.) On the laser side, the information is on the DIM server so ready to be collected. Wolfgang is aware of this. Laser System M&O Optical switch: no spare 1 x 100 switch (old one is 1 x 80 so could not covered EB and EE) Pump laser upgrade:The YLF:Nd pump laser may be replaced by diode pumped model with high stability, reliability and much less maintenance requirement. Spare Parts and Upgrade 19 March