DA  NE KICKERS David Alesini (LNF, INFN Frascati) 4th Low Emittance Rings Workshop INFN-LNF 17-19 September 2014.

Slides:



Advertisements
Similar presentations
ALPHA Storage Ring Indiana University Xiaoying Pang.
Advertisements

Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
CLIC DR EXTRACTION KICKER DESIGN, MANUFACTURING AND EXPERIMENTAL PROGRAM C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral (CIEMAT),
CIEMAT ACTIVITIES ON STRIPLINE KICKERS I. Rodríguez.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
R&D ON STRIPLINES FOR THE CLIC DR KICKERS C. Belver-Aguilar (IFIC) Acknowledgements: A. Faus-Golfe (IFIC), F. Toral (CIEMAT), M. Barnes (CERN) ICFA Beam.
KICKER LNF David Alesini LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Plans for injection/extraction R&D S. Guiducci INFN-LNF KEK - ILCDR07, Dec 207.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, N.Kazarinov.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
Introduction to beam impedance O.Berrig 23/
Impedance and Collective Effects in BAPS Na Wang Institute of High Energy Physics USR workshop, Huairou, China, Oct. 30, 2012.
FAST KICKER STATUS Fabio Marcellini On behalf of LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
PROPOSAL G.I.A.F. (HYBRID GUN AT HIGH FREQUENCY) INFN-LNF – UNIVERSITY OF ROME “LA SAPIENZA”- UCLA D. Alesini (T), M. Ferrario (R), A. Gallo (T),
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
E-cloud studies at LNF T. Demma INFN-LNF. Plan of talk Introduction New feedback system to suppress horizontal coupled-bunch instability. Preliminary.
EMMA: Pulsed magnets Kiril Marinov MaRS group, ASTeC, Daresbury Laboratory 1.
Status of ATF Fast Kicker Experiment
Bunch Separation with RF Deflectors D. Rubin,R.Helms Cornell University.
CLIC workshop 2015 EXTRACTION KICKER STRIPLINE MEASUREMENTS C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral (CIEMAT), M.J. Barnes.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
P I T Z Photo Injector Test Facility Zeuthen Design consideration of the RF deflector to optimize the photo injector at PITZ S.Korepanov.
TESLA DAMPING RING RF DEFLECTORS DESIGN F.Marcellini & D. Alesini.
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
UPDATE ON KICKERS LNF David Alesini for the LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
LER workshop 2014 Update on the Extraction Kicker for CLIC DRs: Calibration Tests C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral.
Electron Cloud Studies at DAFNE Theo Demma INFN-LNF Frascati.
C/S band RF deflector for post interaction longitudinal phase space optimization (D. Alesini)
Main Technical Issues of theSuper B Injector Main Technical Issues of the Super B Injector SuperB Meeting, Isola d’Elba, May 31st – June 3rd, 2008 D. Alesini,
Udo Blell - Synchrotrons 1 Udo Blell GSI, Darmstadt MAC – 7 April 2 th - 3 th, 2012 FZ - Jülich SIS 100 Injection / Extraction systems.
Progress Report on the Ultra-fast Harmonic Kicker Cavity Design and Beam Dynamic Simulation Yulu Huang 1,2 H. Wang 1, R. A. Rimmer 1, S. Wang 1 1.Thomas.
Advancements on RF systems D. Alesini (LNF-INFN) Quinto Meeting Generale Collaborazione LI2FE, Frascati 15-16/03/2011.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
SuperB Injector (2) R. Boni, INFN-LNF - on behalf of the “Injector Study Group” SuperB Mini-MAC, Frascati July, 2008 D. Alesini, R. Boni, F. Marcellini,
High Bandwidth Damper System: kicker impedance
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Dither Luminosity feedback versus Fast IP feedback
NC Accelerator Structures
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Large Booster and Collider Ring
CTF3 kicker activities at CIEMAT
Proposal for a Transparent Off-Axis Injection Scheme for BESSY II
F.Marcellini, D.Alesini, A.Ghigo
STUDIES OF THE STRIPLINE KICKER FOR BEAM EXTRACTION FROM THE CLIC DRs
Update of CLIC accelerating structure design
Junji Urakawa (KEK) for ATF International Collaboration
Conclusions of LCWS08 & ILC08, Chicago, November ‘08
Bunch Separation with RF Deflectors
Damping Ring Kicker Tests at AØ
SuperB project. Injection scheme design status
Strip-line Kicker R&D at KEK-ATF
ATF Fast Kicker R&D at LBNL ILCDR06, Cornell University
Fast Kicker R&D at ATF T.Naito(KEK) TILC09 18/April/ /11/27.
CLIC DR EXTRACTION KICKER DESIGN, MANUFACTURE AND EXPERIMENTAL PROGRAM
Advanced Light Source “The fast strip-line kicker for ALS PSB: Requirements, Design, and Performance“ Presented by: Slawomir Kwiatkowski LBNL. ALS 1.8.
November 14, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
Electron sources for FCC-ee
Explanation of the Basic Principles and Goals
MEBT1&2 design study for C-ADS
Physics Design on Injector I
Kicker and RF systems for Damping Rings
Kicker specifications for Damping Rings
Fast kicker beam dynamics simulations
Presentation transcript:

DA  NE KICKERS David Alesini (LNF, INFN Frascati) 4th Low Emittance Rings Workshop INFN-LNF September 2014

OUTLINE DA  NE injection kickers design criteria measurements installation and test DR-ILC kickers studies tapered strip advantages on beam coupling and transfer impedance effects of the non-uniformity of deflecting field DA  NE horizontal feedback kickers design criteria Installation and test

DA  NE INJECTION SYSTEM The bunches coming from the damping ring are injected into each ring through the injection kickers 1. The second kicker just compensates the oscillations in the stored bunches caused by the injection kick. Old injection kickers were realized with two coils. The length of the kicking pulse were approximately 150 ns. The new kickers have been realized to operate with new fast pulse generators. Compared to the previous devices, the new system has the following main features: -possibility to implement injection with much shorter pulse (12 ns instead of 150 ns); -better uniformity of the deflecting field as a function of the transverse coordinates; -lower beam coupling impedance -possibility of higher repetition rate (50 Hz). EnergyE [MeV]510 Max. beam currentI M [A] 2.2 (e-) 1.1 (e+) # of colliding bunches110 RF frequencyf RF [MHz] RF voltage [kV] Harmonic number120 Bunch spacingT B [ns]2.7 (=1/f RF ) Max LuminosityL [cm -2 s -1 ]4.5  DA  NE parameters (SIDDHARTA runs )

Input ports Output ports (LOAD) Strip ceramic supports BEAM THE NEW DA  NE INJECTION KICKER [D. Alesini et al., PRST, 13, (2010)] Tapered stripline Elliptical cross section HV feedthrough PARAMETER DA  NE ILC Total deflecting voltage V T [MV] Total deflection angle [mrad]50.76 Rise time of the kicker pulse [ns]<6<6<6 Decay time of the kicker pulse [ns]<6<6<6 Flat top kicker pulse [ns]>0.5> 0.12 Horizontal beam stay kicker [mm] (diameter) >50>52 Bunch length of injected bunches [mm]356 Relative amplitude jitter<5%<0.065% Maximum Rep. rate [Hz] Number of injected bunches Kicker electrical length [m]0.85 The kicker is basically a two stripline structure, where both the striplines and the surrounding chamber have been tapered. Each transverse section has constant 50 Ω impedance to match the output impedance of the high voltage pulse generator. The deflecting field flatness has been obtained with a proper choice of the ratio between the length of tapered and straight sections while the beam impedance reduction is the result of the tapering. The novelty of the new DA  NE kickers with respect to previous devices is the introduction of the tapered striplines to simultaneously obtain: -low beam coupling and transfer impedances -excellent uniformity of the deflecting field -better matching between the strip and the pulse generators

ELLIPTICAL CROSS SECTION OF THE STRIPLINES: EFFICIENCY AND UNIFORMITY OF THE DEFLECTING FIELD The TEM deflecting mode can be excited by feeding the two strips with opposite voltages while, to have a net deflection, the particle beam has to travel in the opposite direction with respect to the TEM wave. For a given stripline aperture it is possible to calculate the total equivalent deflecting field E T at the center of the structure, normalized to the input voltage per strip V P, as a function of the coverage angle. The intensity of the deflecting field increases if  increases but, on the other hand, also the distance between the strip and the vacuum chamber itself has to be increased to maintain the strip impedance constant For large coverage angles, the efficiency of an elliptical stripline is larger than the circular one because the strip is closer to the center of the pipe. Another important point to be taken into account is the behavior of the deflecting field as a function of the transverse coordinates (x-horizontal, y-vertical). a=25 mm

DESIGN CRITERIA OF THE NEW KICKERS The design of the kickers is based on the idea to properly taper the striplines and the surrounding vacuum chamber. Each transverse section should have constant impedance in order to avoid reflections of the input pulse. The tapered scheme allows to: a)reduce the broadband beam coupling impedance since the discontinuity of the striplines is mitigated by the introduction of the tapers; b)improve the deflecting field quality obtaining a uniform transverse deflection as a function of the transverse coordinate (horizontal in particular); c)obtain a better matching between the generator and the kicker structure at high frequency avoiding multiple reflections of the deflecting pulse; d)reduce the beam transfer impedance. (a) Integrated deflecting field as a function of the horizontal and vertical (b) coordinates; (c) deflecting field in the center of the structure as a function of the longitudinal coordinate

PARAMETERS Beam Energy E [MeV]510 Time spacing between bunches [ns]2.7 Deflection [mrad]5 Total deflecting voltage VT [MV]2.5 Total kicker length L [cm]  90 Voltage per strip [kV]45 Input pulse length [ns]  5 Pulse length “seen” by bunches [ns]  10 Max rep rate [Hz]10 NEW KICKERS: PARAMETERS The whole kicker dimensions included the length of the tapers have been designed to have an integrated deflecting voltage along the kicker of 2.5 MV with a maximum input voltage per strip of 45 kV. The typical high voltage input pulse signal is given in the figure. The pulse has a very short rise time (of about 300 ps), a longer decay time (of about 2.5 ns) with a flat top time of about 5 ns. From this profile it is possible to calculate the total deflecting field as a function of the bunch time arrival in the kicker structure. The result is shown in the figure.

RF MEASUREMENT RESULTS: REFLECTION COEFFICIENT Reflection coefficient at the input port: HFSS simulations and measurements. The final mechanical drawing (cross- section) of the kickers and a picture of the realized kicker are shown in the figure. The strip is sustained by ceramic supports. Since commercial 50  high voltage feedthroughs do not exists, they have been developed at LNF.

RF MEASUREMENT RESULTS: BEAM COUPLING IMPEDANCES The wire method technique has been used to fully characterize the kicker beam coupling and transfer impedances. The longitudinal coupling impedance has been measured with several different terminations at the 4 kicker ports: when 50 Ω matches each port; when the two input ports are closed on short circuits and the output ports are on 50 Ω, and when the 50 Ω are replaced by the real HV 50 Ω load built to be used for the operation. The first of these measurements give the impedance of the stand-alone kicker, while the other two take account of mismatches introduced by connecting the pulsers (a short circuit is used to simulate the pulser in the worst possible condition). Perfect matching of the 4 ports The transfer impedance allows the evaluation of the peak voltage and the average power induced by the beam into the kicker ports for a given beam current. The maximum induced peak voltage on the upstream (output) ports is <100 V with a 6 nC bunch charge while the average power induced on the ports is <10 W with a 2A beam.

DA  NE OPERATION WITH THE NEW KICKERS (1/3) Four new kickers have been installed since November They always worked properly and the only problem we had was related to a wrong brazing of few mini-bellows. The damaged mini-bellows have been replaced. The injection with the high voltage fast pulse generators has been successfully tested. The figure shows the the r.m.s. oscillation amplitude of 100 stored bunches with the kicker pulse centered on bunch 50 obtained with the horizontal digital feedback diagnostics. As expected the bunches 49 and 51 takes approximately half the kick maximum amplitude, while bunches 48 and 52 are only very little perturbed. As a matter of fact, the operation with fast pulse generators has shown a poor reliability, even after repair and substitution of damaged parts with upgraded ones. The reasons of such poor reliability have not been understood. In any case we never had the possibility to use routinely and at the same time the eight fast pulsers.

Several different injection configurations have been therefore used. For great part of the operation time, the kickers worked with the old long pulse generators in both the rings. In this configuration the two strips are connected in series and the kick is only given by the magnetic field one. (MAX STORED CURRENT e- >2.5 A) PARAMETERS Deflection/current [mrad/kA]2.7 Total deflecting voltage VT/current [MV/kA]1.38 Also a different “hybrid” configuration has been successfully tested. In this case the two kinds of pulsers (long and fast) were used together on the same kicker, connecting each one to a different stripline. Figure shows, as example, the sum of the signal detected at the two stripline outputs ports of each kicker in this configuration. DA  NE OPERATION WITH THE NEW KICKERS (2/3)

The new stripline kicker has been also used as an additional kicker for the horizontal feedback in the positron ring. One stripline of both the kickers of the DANE positron ring have been connected with the old-long pulser for beam injection and the remaining stripline connected to the amplifiers of the feedback system. Thanks to this configuration it has been possible to increase the stored current in the e + ring to more than 1 A. With the aim to overcome the problems related to the fast pulser reliability, it has been decided to try a different and more compact model that produces an output pulse having the same shape but a reduced amplitude from 45 kV to 25 kV. In spite of the lower kick voltage, increasing ß function in the kicker region and changing the beam orbit in the septa, the injection was possible as well. According to the hybrid scheme, two 25kV units were installed in the electron ring at the end of the SIDDARTHA run (September 2009-November 2009) and have been successfully tested up to the end of the run for about two months of operation without problems. The injection kickers (not the “compensating” ones) have been also modified with a “cut and paste” operation and now the strip distance in the center of the kicker is 40.8 mm instead of 54.8 mm. This increases the kicker efficiency by 40%. DA  NE OPERATION WITH THE NEW KICKERS (3/3)

GENERAL CONSIDERATIONS: ADVANTAGES OF TAPERED KICKERS ON BEAM IMPEDANCE The advantages in tapering the striplines of the kickers can be pointed out with simple electromagnetic simulations. We consider, as an example, the case of a kickers with the dimensions reported in figures. The two kickers give the same deflecting field for a given strip voltage and have the same electrical length. The longitudinal beam coupling impedance and the transfer impedance calculated by GdfidL in the two cases up to 20 GHz are reported in figures. The results show the strong reduction of the impedance and transfer impedance content when we have a tapered geometry. From HFSS simulation it is also easy to verify that the reflection coefficient at the input port is also reduced above 1 GHz.

PARAMETERS (ILC)  x_KICK =65 m;  y_KICK =20 m A x_max =A y_max =0.09 m  rad (injected) Bunches distance = 3.08 ns stripline geometries Geometry 1 Geometry 2 y x 25 mm  /2=45 deg GENERAL CONS.: UNIFORMITY OF THE DEFL. FIELD (1/4)

Geometry 1 Geometry 2 GENERAL CONS.: UNIFORMITY OF THE DEFL. FIELD (2/4)

A x_max =0.15 m  rad A x_98% =0.11 m  rad A y_max =0.13 m  rad A y_98% =0.09 m  rad Horizontal plane Geometry 1 Vertical plane GENERAL CONS.: UNIFORMITY OF THE DEFL. FIELD (3/4)

V strip =10kV Geometry 1 GENERAL CONS.: UNIFORMITY OF THE DEFL. FIELD (4/4)

20 cm striplines 22 cm+ 2*12 cm tapers OTHER APPLICATIONS: NEW TAPERED KICKER FOR THE DA  NE TRANSVERSE FEEDBACK The new horizontal DA  NE kickers of the horizhontal feedback system have been designed using the same “phylosophy” of tapered striplines.

PERFORMANCES OF THE NEW TRANSVERSE FEEDBACK KICKERS Transverse shunt impedance In the horizontal plane we incresed the perrformances of the feedback system by a factor 5 with respect to the “old” system Courtesy A. Drago

CONCLUSIONS -The design of the new DA  NE injection kickers has been based on elliptical and tapered striplines with HV 50 Ohm feedthroughs. Using a tapered stripline it has been possible to simultaneously reduce the impedance of the device and to improve the deflecting field quality. -They have been successfully installed in the collider demonstrating to be very versatile devices to be used in different operation conditions. -Injection with the 45 KV pulsers has been successfully tested but showed poor reliability -Other possible injections scheme have been tested successfully: with the old long pulse generators and in a hybrid configuration -Lower voltage (25 kV) fast pulse generators have been successfully tested for two months and they will be finally used for injection in the next DA  NE run -Low power RF measurements have been also done and compared with simulations showing a very good agreement and a total comprehension of the device from the electromagnetic point of view -General advantages of tapered kickers and critical issues on the uniformity of the deflecting field have been also pointed out. -A similar approach has been also successfully adopted for the kickers of the horizontal feedback system

THANKS TO… P. Raimondi, F. Marcellini, G. Sensolini, A. Drago, C. Milardi, M. Zobov, S. Pella, M. Serio, A. Ghigo, S. Guiducci, A. Zolla and… the DA  NE team!