7/24/011 TFTR D&D Status July 24, 2001. 7/24/012 Project Status The TFTR D&D Project will be completed on time and within budget.

Slides:



Advertisements
Similar presentations
Learning Objectives Understand the OSHA requirements for fall protection during steel erection Understand the OSHA requirements for fall protection during.
Advertisements

Vacuum Vessel Production Readiness Review
NCSX Vacuum Vessel Overview Paul Goranson WBS 12 Manager Vacuum Vessel Manufacturing Study Kickoff meeting April 29, 2003.
January 8-10, 2003/ARR 1 Plan for Engineering Study of ARIES-CS Presented by A. R. Raffray University of California, San Diego ARIES Meeting UCSD San.
RFCC Module Tech Board Schedule Discussion Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 4, 2009.
Eliminating and Controlling Dust & Noise Hazards July 2002.
Princeton Plasma Physics Laboratory D&D of TFTR Health Physics Safety Radioactive Waste Keith Rule.
NSTX Supported by Erik Perry May 5, 2009 NSTX Upgrade Status.
June 25-26, 2002D&D Lessons Learned Workshop1 Overview of the TFTR D&D Project Erik D. Perry D&D Lessons Learned Workshop June 25-26, 2002 PPPL.
Princeton University Plasma Physics Laboratory EVMS Certification Review NSTX Project Overview Ron Strykowsky October 4-6, 2011.
NCSX NCSX Project Update Hutch Neilson, Project Manager for the NCSX Team Princeton Plasma Physics Laboratory Oak Ridge National Laboratory Briefing for.
Chapter 23 Lighting Design Process: Final Phases © 2006 Fairchild Publications, Inc.
Final Meeting TW5-TSW-001 Deliverable 2 SCKCEN, L. OomsCulham, October 23–24, 2006.
Overview of TFTR D&D Hazards Jerry Levine Head, Environment, Safety & Health.
Line Breaks Steve Raftopoulos D&D Lessons Learned Workshop June 25-26, 2002 PPPL.
June 25-26, 2002D&D Lessons Learned Workshop1 Summary of Lessons Learned James H. Chrzanowski D&D Lessons Learned Workshop June 25-26, 2002 PPPL.
TF Coil Vacuum Vessel Wire Rope Tensioning Fixture 3 Per Segment Horizontal Stop 3 Per Segment Wood Block 2 Per Segment TFTR D&D FMEA REVIEW Vacuum Vessel.
Shear Problem Defined There are no bolts on the inboard side of the coil structure to account for shear forces. Bottom Line: friction alone will not prevent.
PRY Implementation - Contents l Fit with Experimental Devices (& services connections) l Fit with Tracker Cryo l Fit with Floor & Trench l Fit with Mezzanine.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
Anthony Indelicato DOE-Princeton Site Office May 2012 Construction Progress Review for the NSTX Upgrade Project Construction Progress Review for the NSTX.
J. Levine5/21/02 NCSX ENVIRONMENT, SAFETY & HEALTH (ES&H) NCSX Conceptual Design Review (CDR) May 21, 2002.
June 25-26, 2002D&D Lessons Learned Workshop1 D&D Health Physics Issues George Ascione / Carl Tilson D&D Lessons Learned Workshop June 25-26, 2002 PPPL.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
NCSX Field Period Assembly (FPA) Operations, Cost and Schedule, Staffing, and Metrology Utilization Mike Viola Field Period Assembly Manager NCSX FPA Peer.
11/2/2005Mike Viola1 November Lehman Review November 2, 2005 NCSX VVSA NCSX Vacuum Vessel Fabrication Major Tool and Machine – S F 3 120° segments.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
F. Dahlgren -SC Project Review of NCSX, April 8-10, 2008 PF, TF, & Trim Coil Supports (WBS-15) Core Base Support Structure (WBS-17) F. Dahlgren NCSX Coil.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
US Project Plan for MICE Mark Palmer Peter Garbincius, Alan Bross, Rich Krull Fermilab November 24, 2014.
Electric Energy Notes.
Engineering Operations Outage Schedule Center Stack casing is scheduled to go back in the vessel today Complete NB armor, Diagnostic calibrations, clean/photo/close,
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
SC Project Review of NCSX, April 8-10, 2008 NCSX Machine Assembly E. D. Perry.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
Procurement and Manufacture of LCLS Undulators FY 04 Activity: Complete design of Second Prototype Undulator This will include field control comb Procure.
NCSX VACUUM VESSEL PL Goranson Final Design Review November 17, 2005 Man Access Port /Lateral Supports NCSX.
Field Period Assembly Wayne Reiersen SC Project Review PPPL May 2006.
Technical Readiness Review of the n-3He Experiment Seppo Penttila ORNL P-div At SNS Jan
Engineering Operations Outage Status: New shielding of HHFW/in-vessel components has been completed. Fit-ups of OH bus lead upgrades to reduce error fields.
Preparations for working on Station 1 November 22, 2005.
12/19/2006Mike Viola1 December Lehman Review December 19, 2006 Mike Viola Field Period Assembly Manager NCSX Field Period Assembly + + =
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
Anthony Indelicato DOE-Princeton Site Office December 2012 Construction Progress Review for the NSTX Upgrade Project Construction Progress Review for the.
NCSX Major Procurement Status July 20, Steady Progress on C1 and C2 The C1 was transferred to the 5 axis machine last Saturday; finish machining.
Cryoplant Controls Installation
Integrate Lighting, Daylighting and HVAC Control in the Laboratory Room Duane Ranski Siemens Industry Inc.
Resource Loaded Schedule and Budget Profile
QXF Coil Fabrication & Tooling Reaction / Impregnation
14 Refrigerant Recovery, Recycling, and Recharging.
Radiation Safety Management
LARP Vertical Test Facility
Project General Data Beneficiary: Rosenergoatom
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
S0 Status report from KEK
Construction (Design and Management) Regulations (CDM) 2015
Peer Review Agenda (Suggested).
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
Manufacturing Engineering (ME)
Fire Prevention and Safety
Experimental equipment Edgar L. Black February 17, 2019
Status of Readout Boards
Nuclear Power Plants.
Nuclear Power Plants.
2019/7/9 Application of cavitation jet technique to operating nuclear power plant MITSUBISHI HEAVY INDUSTRIES, LTD.  Hironori Onitsuka KORYO ENGINEERING.
Injector/Linac Design Status C. E
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
BC2 / Linac Installation Coordination Kathleen Ratcliffe
PS magnet status D Bodart 25/06/2019.
Presentation transcript:

7/24/011 TFTR D&D Status July 24, 2001

7/24/012 Project Status The TFTR D&D Project will be completed on time and within budget

7/24/013 Project Status Reviews since 12/00: DOE Cost and Schedule Review, 12/00 PPPL Audit of D&D Project, 12/00 - 1/01 - no findings DOE-PG Unified Safety Review, 4/01 - no findings DOE-CH Review of Sector Lift Procedure, 5/01 - approved ALARA Review of Vessel Segmentation, 5/01 - approved DOE EH-24 Review, 5/01 - awaiting report

7/24/014 Project Status cont Engineering: Vessel Segmentation FMEA approved Successful Final Design Review for Vessel Segmentation Last of the removal procedures are being prepared Temporary vessel supports, for vessel segmentation, have been designed, fabricated, tested, and are currently being installed

7/24/015 Project Status cont Engineering cont : A sector disassembly fixture has been designed, fabricated and tested - a second fixture is currently in fabrication

7/24/016 Project Status cont Engineering cont : A special vertical bandsaw has been tested and procured for cutting the TF coils in half to reduce the cost of shipping them for burial Contamination barriers for the annulus between the vacuum vessel and the TF coils have been designed, tested, and are currently being installed

7/24/017 Project Status cont Engineering cont : Continuing to spend more time on engineering (especially Diamond Wire Cutting) because it improves overall safety and efficiency Continuing to pay attention to the principles of Integrated Safety Management

7/24/018 Project Status cont Diamond Wire Cutting Engineering: Cutting of the vacuum vessel will be done using a diamond wire rope technology that has been specifically developed for this purpose - reduced airborne contamination - reduced worker exposure - reduced cost

7/24/019 Project Status cont Diamond Wire Cutting Engineering cont : When each vessel segment is removed, two TF coils will be lifted with it A disassembly fixture will be used to support the vessel segment while the TF coils are rotated off of it The vessel segments will be placed in special shipping/burial containers and immediately shipped A special vertical bandsaw will be used to cut the TF coils in half to reduce the cost of shipping them for burial

7/24/0110 Project Status cont Diamond Wire Cutting Engineering cont : Diamond Wire Cutting trials have developed the process into a mature state Results indicate that we can do a through-cut in a day Process has been refined to reduce the chance of a broken wire and reduce worker exposure should a wire need to be replaced Process for gas cooling/cleaning of the wire has been developed to reduce tritium contaminated waste

7/24/0111 Project Status cont Diamond Wire Cutting Engineering cont :

7/24/0112 Project Status cont Field Work: Vacuum Pumping Ducts have been removed

7/24/0113 Project Status cont Field Work cont : Lintels and columns and Shear Compression Panels have been removed

7/24/0114 Project Status cont Field Work cont : Ducts connecting Neutral Beamlines to the vacuum vessel have been removed

7/24/0115 Project Status cont Field Work cont : Vacuum vessel appendages have been removed and all windows have been reinforced

7/24/0116 Project Status cont Field Work cont : Vacuum vessel has been filled with lightweight concrete

7/24/0117 Project Status cont The TFTR D&D Project is continuing on a path which will assure that it will be completed on time and within budget

7/24/0118

7/24/0119

7/24/0120

7/24/0121 FY01 Accomplishments

7/24/0122 FY01 Remaining

7/24/0123 FY02 Planned

7/24/0124 Radwaste Status