April 2006 CD1 Review NOvA DAQ 642,816 300 hits/sec avg. 20,088 Front-End Boards (~ 3 MByte/sec data rate per FEB) 324 Data Combiner Modules,

Slides:



Advertisements
Similar presentations
HCAL FIT 2002 HCAL Data Concentrator Status Report Gueorgui Antchev, Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
Advertisements

Development of novel R/O electronics for LAr detectors Max Hess Controller ADC Data Reduction Ethernet 10/100Mbit Host Detector typical block.
BTeV Trigger Architecture Vertex 2002, Nov. 4-8 Michael Wang, Fermilab (for the BTeV collaboration)
Eunil Won Harvard University April 11, 2003 for ZPD FDR 1 ZPD Prototype Tests and DAQ Implementation Introduction Prototype Tests - Electrical Signals.
1 Design of the Front End Readout Board for TORCH Detector 10, June 2010.
CKM 26 Feb 2002 Triggerless DAQ Architecture. CKM 26 Feb 2002 Switch-based DAQ Operation (buffers)
Winter 2013 Independent Internet Embedded System - Final A Preformed by: Genady Okrain Instructor: Tsachi Martsiano Duration: Two semesters
LAr40 Data Acquisition WBS Jon Urheim Far Site Review, December 6-9,
NetBurner MOD 5282 Network Development Kit MCF 5282 Integrated ColdFire 32 bit Microcontoller 2 DB-9 connectors for serial I/O supports: RS-232, RS-485,
FLARE Workshop November 4-6, Data Acquisition Mark Bowden, Margaret Votava.
K. Honscheid RT-2003 The BTeV Data Acquisition System RT-2003 May 22, 2002 Klaus Honscheid, OSU  The BTeV Challenge  The Project  Readout and Controls.
DCS Detector Control System Hardware Dirk Gottschalk Volker Kiworra Volker Lindenstruth Vojtech Petracek Marc Stockmeier Heinz Tilsner Chair of Computer.
Remote Firmware Down Load. Xilinx V4LX25 Altera Stratix Control Altera Stratix Control Xilinx V4FX20 EPROM XCF08 EPROM XCF08 EPROM EPC16 EPROM EPC16 EPROM.
Calorimeter upgrade meeting - Wednesday, 11 December 2013 LHCb Calorimeter Upgrade : CROC board architecture overview ECAL-HCAL font-end crate  Short.
TRIGGER-LESS AND RECONFIGURABLE DATA ACQUISITION SYSTEM FOR POSITRON EMISSION TOMOGRAPHY Grzegorz Korcyl 2013.
Future DAQ Directions David Bailey for the CALICE DAQ Group.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
Understanding Data Acquisition System for N- XYTER.
ALICE Rad.Tolerant Electronics, 30 Aug 2004Børge Svane Nielsen, NBI1 FMD – Forward Multiplicity Detector ALICE Meeting on Rad. Tolerant Electronics CERN,
PHENIX upgrade DAQ Status/ HBD FEM experience (so far) The thoughts on the PHENIX DAQ upgrade –Slow download HBD test experience so far –GTM –FEM readout.
David Bailey University of Manchester. Overview Aim to develop a generic system –Maximise use of off-the-shelf commercial components Reduce as far as.
June 3, 2005H Themann SUSB Physics & Astronomy 1 Phenix Silicon Pixel FEM S. Abeytunge C. Pancake E. Shafto H. Themann.
R&D for First Level Farm Hardware Processors Joachim Gläß Computer Engineering, University of Mannheim Contents –Overview of Processing Architecture –Requirements.
11th March 2008AIDA FEE Report1 AIDA Front end electronics Report February 2008.
Frank Lemke DPG Frühjahrstagung 2010 Time synchronization and measurements of a hierarchical DAQ network DPG Conference Bonn 2010 Session: HK 70.3 University.
Timing Distribution System (TDS) 9 April, 2010 Greg Deuerling Rick Kwarciany Neal Wilcer.
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
Data Acquisition Backbone Core J. Adamczewski-Musch, N. Kurz, S. Linev GSI, Experiment Electronics, Data processing group.
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
CKM Data Source System CKM Electronics Group July 2003.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
Modeling PANDA TDAQ system Jacek Otwinowski Krzysztof Korcyl Radoslaw Trebacz Jagiellonian University - Krakow.
Beam diagnostics developments at LAPP: Digital part CTF3 Collaboration Meeting Louis Bellier, Richard Hermel, Yannis Karyotakis, Jean Tassan,
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
The Past... DDL in ALICE DAQ The DDL project ( )  Collaboration of CERN, Wigner RCP, and Cerntech Ltd.  The major Hungarian engineering contribution.
XLV INTERNATIONAL WINTER MEETING ON NUCLEAR PHYSICS Tiago Pérez II Physikalisches Institut For the PANDA collaboration FPGA Compute node for the PANDA.
D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, R. Joannes, A. Le Coguie, S. Lhenoret, I. Mandjavidze, M. Riallot, E. Zonca TPC Electronics:
S.Anvar, V.Gautard, H.Le Provost, F.Louis, K.Menager, Y.Moudden, B.Vallage, E.Zonca, on behalf of the KM3NeT consortium 1 IRFU/SEDI-CEA Saclay F
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
Event Display The DAQ system architecture The NOA Data Acquisition system with the full 14 kt far detector P.F. Ding, D. Kalra, A. Norman and J. Tripathi.
The ALICE Data-Acquisition Read-out Receiver Card C. Soós et al. (for the ALICE collaboration) LECC September 2004, Boston.
IRFU The ANTARES Data Acquisition System S. Anvar, F. Druillole, H. Le Provost, F. Louis, B. Vallage (CEA) ACTAR Workshop, 2008 June 10.
GGT-Electronics System design Alexander Kluge CERN-PH/ED April 3, 2006.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
St Petersbourg June  CAP COMET (Compressor for e tracking) Overview.
Eric Hazen1 Ethernet Readout With: E. Kearns, J. Raaf, S.X. Wu, others... Eric Hazen Boston University.
E. Hazen -- HCAL Upgrade Workshop1 MicroTCA Common Platform For CMS Working Group E. Hazen - Boston University for the CMS Collaboration.
T. Gorski, et al., U. Wisconsin, April 28, 2010 SHLC RCT MicroTCA Development - 1 SLHC Cal Trigger Upgrade SLHC Regional Calorimeter Trigger MicroTCA Development.
AMC13 Project Status E. Hazen - Boston University
DAQ and TTC Integration For MicroTCA in CMS
“FPGA shore station demonstrator for KM3NeT”
CALICE DAQ Developments
PRAD DAQ System Overview
AMC13 Status Report AMC13 Update.
Production Firmware - status Components TOTFED - status
Future Hardware Development for discussion with JLU Giessen
Iwaki System Readout Board User’s Guide
TELL1 A common data acquisition board for LHCb
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
L0 processor for NA62 Marian Krivda 1) , Cristina Lazzeroni 1) , Roman Lietava 1)2) 1) University of Birmingham, UK 2) Comenius University, Bratislava,
MicroTCA Common Platform For CMS Working Group
VELO readout On detector electronics Off detector electronics to DAQ
NA61 - Single Computer DAQ !
STAR-CBM Joint Workshop Heidelberg, Physikalisches Institut
Embedded XINU and WRT54GL
RPC FEE The discriminator boards TDC boards Cost schedule.
RPC Electronics Overall system diagram Current status At detector
NetFPGA - an open network development platform
TELL1 A common data acquisition board for LHCb
Presentation transcript:

April 2006 CD1 Review NOvA DAQ 642, hits/sec avg. 20,088 Front-End Boards (~ 3 MByte/sec data rate per FEB) 324 Data Combiner Modules, each reading out 64 FEBs. 1.8 to 3.5 GByte/sec detector data rate.

April 2006 CD1 Review DAQ x and 2.7.x Front-end Data to Farm X64 Cross-connect Trigger Processors (256) APD Front-end Boards (20,088) Data Concentrators (324) Ethernet Network X64

April 2006 CD1 Review DAQ on the Detector

April 2006 CD1 Review DAQ Network Front-end Boards Data Concentrator Gigabit Ethernet Control/ Timing 4m cables

April 2006 CD1 Review Timing System GPS Run Control Host Cross- connect GE Network Data Concentrator FEB Clock, Sync, Cmd, Data Fanout X64 X6 X324 Storage & Internet Processor Farm X256

April 2006 CD1 Review DCM Block Diagram … Front-End Inputs X 64 … JTAG PLD FPGA GE PHY Gigabit Ethernet Clk, Sync, Cmd, Data To Data Network From Control/ Timing System LVDS Drivers Clk & Sync Cmd & Data DRAM Processor Boot Flash

April 2006 CD1 Review DCM Layout FE Links FPGA (embedded processor & Ethernet) Gigabit Ethernet Buffer memory (DRAM)

April 2006 CD1 Review DAQ Network … X 9 Data Concentrators 48 port GE switches Processors … X 8

April 2006 CD1 Review DAQ Network - Realization COTS SWITCHES

April 2006 CD1 Review Dataflow 1a 2a 3a 0a 1b 2b 3b 0b 1c 2c 3c 0c 1d 2d 3d 0d Data Concentrators Switch

April 2006 CD1 Review Dataflow2 0a 0b 0c 0d 1a 1b 1c 1d 2a 2b 2c 2d 3a 3b 3c 3d Processors Switch

April 2006 CD1 Review DAQ/DCM Design flow Prototype DCM (5) R&D x Integration Prototype DCM (9) R&D x Production Pilot DCM (9) Construction Production DCM (324) Construction Integration Prototype Near Detector 2007 Near Detector 6 Years Far Detector Data for 6 Years Integration Prototype FEB Pilot FEB Production FEB Production Test Stand Mini-DAQ 1 Switch, ~10 Proc Mini-DAQ 1 Switch 5 Proc Production DAQ - 2 level Switch, 256 Proc

April 2006 CD1 Review DAQ/DCM Cost flow Prototype DCM (5) R&D x $23.2k M&S $282k Labor Integration Proto DCM (9) R&D $23.2k M&S $18.1k Labor Production Pilot DCM (9) Construction $21.1k M&S $4.2k Labor Production DCM (324) Construction $400k M&S $80k Labor Integration Prototype Near Detector 2007 Near Detector 6 Years Far Detector 6 Years Integration Prototype FEB Pilot FEB Production FEB Production Test Stand Mini-DAQ 1 Switch, 8 Proc $35.3k M&S $8.7 Labor Mini-DAQ 1 Switch 5 Proc $113.7k M&S $338.5k Labor Prod DAQ 24 Switches, 256 Proc $670.8k M&S $165.5k Labor DAQ Hardware R&D $160k M&S $638k Labor DAQ Hardware Prod. $1127k M&S $258k Labor Note: DAQ includes timing, network and control room

April 2006 CD1 Review Finito

April 2006 CD1 Review Backup slides

April 2006 CD1 Review DCM Wiring CAT5e cable Clk Sync Cmd Data

April 2006 CD1 Review DCM Timing stop bit Clock Sync start bit Cmd / Data (4X oversampled)

April 2006 CD1 Review