Coeus Spring ’09 - January 21 Update L. Sailer, B. Adams, A. Hart, B. Veenema Spring ’09 - January 21 Update L. Sailer, B. Adams, A. Hart, B. Veenema.

Slides:



Advertisements
Similar presentations
Do not use the first Task to define the Project Start Date Project always calculates from Project Start (Finish) Date Schedule from Project Finish.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Basic Overview of Project Management and Life Cycle ACES Presentation T. Gregory Guzik January 21, 2003.
Sept. 30, 2004 NIKHEF-1 Hans de Vries Status NIKHEF Mechanics Secondary vacuum box Bellows Vacuum system CO 2 cooling: Bart Verlaat.
Vacuum Vessel Production Readiness Review
, CLIC Test Module Meeting Status of the DB Quad adjustable support design Mateusz Sosin CLIC Module WG Meeting, 22-May-2013.
Liquid Nitrogen (LN2) Fire Extinction - Phase II
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
By: Matt Luedeman, Peter Wells, Chris Dyke Advisor: Jay McCormack Clients: Dr. Karl Rink Dr. Gabriel Potirniche Dr. Akira Tokuhiro 1.
Clean Water for Everyone Biofilter Project Presented on November 14, 2005.
XFD – XF Engineering Group October 20, 2005LCLS Undulator Alignment and Motion System1 Precision and repeatability of cam-shaft system in both directions.
Final Report Document. Format Title Page Executive Summary Table of Contents Introduction Mission Statement Main PDS items Brief justification of the.
Module Vessel Connection Concept Steve Virostek Lawrence Berkeley National Laboratory AFC Module Meeting April 23, 2004.
November 8-9, Blanket Design for Large Chamber A. René Raffray UCSD With contributions from M. Sawan (UW), I. Sviatoslavsky (UW) and X. Wang (UCSD)
Non-welded Window Option Edgar L. Black IIT August 15,2003.
Habitat for Humanity Final Presentation May 3, 2002.
Dean R Walters Chamber and Bellows Jan. 5, Summary Chamber The plan is to construct a chamber made of 316LN stainless steel with.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
Automatic Dental Bur Loader NCDA Dental Products Development Group Progress Review Team 99.06: Jason Dickey, Greg Frantz, Allison Martin, Nancy Meyer Sponsor:
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
EPERC TTF2 annual meeting – Milano November 2000 HSD « ADVANCED DESIGN METHODOLOGIES TO EXPLOIT HIGH STRENGTH STEELS FOR PRESSURE EQUIPMENT MANUFACTURE.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Lecture 3 Scheduling CSCI – 3350 Software Engineering II Fall 2014 Bill Pine.
Alpha Magnetic Spectrometer - 02 Flight Safety Review Phase II May , 2007 Analysis - Welding and Brazing Dan Rybicki – Materials Analysis Jacobs.
27 April 2005Safety Lock Mailbox1 Safety Lock Mailbox ME Final Presentation Carlos Alzate Brian Dorton Song Park Varun Sharma Jack Vasko Adam Zurawski.
WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration Meeting, CERN, Geneva November 12 th 2009.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
Background: Used to generate a pressure gradient shock wave traveling down a closed tube.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Lithium Hydride Absorber Program Update Alan Bross MICE CM Sofia – October 5 th, 2010.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
The Blockheads Status Presentation I. Week 1 Changes were made to our timeline and program based on the meeting held with Dr. Snell on Thursday, January.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Tube Magazine Fed Bolt-Action Rifle—Cal Winchester. STUDENT: DALLAS CLAYTON DAIGLE CONCENTRATION: MECHANICAL CLASS: ET 494 FALL 2015 INSTRUCTOR:
Steel Fabrication & Erection of Belle Chase Primary School Proposal – Fall 2015 ET 494 – Senior Design II Derek Duhon Instructor: Dr. Koutsougeras Advisor:
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
Request for Proposal (RFP) In response to the RFP – the first step is to prepare a proposal 1. Review Customer Requirements and come up with candidate.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
Double Star meeting ESTEC 25/26 March Hardware Status Engineering breadboard fabricated to validate the FPGA concept – Using an ACTEL A1280 – Tested.
14-Jun-161 Status of Horizontal Test Stand (HTS-2) Development Efforts Pradeep Kush, Prashant Khare, RRCAT, India Team Members: S.Gilankar, Rupul Ghosh,
TF Fabrication Progress is being made on TF bundle fabrication activities but the schedule remains tight. All 24 outer conductors have been machined but.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Examples. Example 2 A thin cylinder 75 mm internal diameter, 250 mm long with walls 2.5 mm thick is subjected to an internal pressure of 7 MN/m 2. Determine.
1.I interaction with VakuumPraha using basic drawings. We made a deal for 19'310 EUR + tax for two vacuum chambers plus the compensation system, we provide.
Stator Plan & Schedule Chris Booth 2nd March 2009
Master Production Scheduling (MPS)
Advisor: Dr. Shangchao Lin
3-D Printed Pressure Vessel Design to Maximize Volume to Weight
FIRST VIDEO CONFERENCE JANUARY 7, 2004 Edgar L. Black IIT
ME Spring 2015 Systems Engineering, Part II
IR Detector - Test cryostat : Machining
Teleconference ACS – FREIA 10th May 2017
Spoke CDS PDR Closeout J. G. Weisend II June 10, 2016.
Far Detector Activities Late 2017 – Early 2018
UK RFD Pre-Series cryomodule
SC1R Cold Box PDR Mechanical Design
Request for Proposal (RFP)
Panther II Hybrid Rocket Final Semester Overview
Tube Magazine Fed Bolt-Action Rifle—Cal Winchester.
SNS PPU Helium Vessel Design and Assembly
SNS PPU Cryomodule Vacuum Vessel
Challenges and Deadlines for Production
Tube Magazine Fed Bolt-Action Rifle—Cal Winchester.
SNS PPU Helium Vessel Design and Assembly
East Hall under construction
Presentation transcript:

Coeus Spring ’09 - January 21 Update L. Sailer, B. Adams, A. Hart, B. Veenema Spring ’09 - January 21 Update L. Sailer, B. Adams, A. Hart, B. Veenema

2 Overview Project Modification Work to Date Imminent Work Semester Completion

3 Overview Project Modification Work to Date Imminent Work Semester Completion

4 Changes Schedule modification Scrap prototype construction Final design & construction Alpha Design - Front Cross-section

5 Design: Changes Dropping prototyping Original plan: 2 prototypes, 1 final Time & material constraints Purpose of Beta Prototype assimilated into Alpha Formal adoption of cylindrical “Fire-Hydrant” chamber design

6 Schedule: Changes Dropped Alpha Prototype construction Completely dropped Beta Prototype - design & construction Considering material, time, purpose A bit behind schedule

7 Schedule: Changes New schedule includes anticipates delivery of final design by April 10 Construction of vessel to be completed by third-party Likely ‘Florida Precision’ in Melbourne Requirements to be discussed in next 1-2 weeks

8 Overview Project Modification Work to Date Imminent Work Semester Completion

9 Design Work Design of Alpha Prototype completed in November Not to be constructed Visualization of system, component requirements Initial box design for simplicity Box design structurally insufficient Calculations on “Fire-hydrant” design finished [ASME] for circumferential and transverse stresses, respectively

10 Design Work Alpha design - Minimum workable dimensions Allowed for translation system visualization

11 Design Work 6 electrical/optical feedthroughs Bellow design Wedge grips for material testing Swagelock™ fluid feeds Design components from vacuum systems Alpha Design - Front Cross-section

12 Design Work ASME pressure vessel regulations Utilization of manual allows for design with appropriate recommended factor of safety - COMPLETE Welds Material properties Vessel stress Joint efficiencies.25-in thickness more than enough to contend with 115-psi internal pressure [ASME]

13 Overview Project Modification Work to Date Imminent Work Semester Completion

14 Design Work Integrate ASME regulations into Final Design Discuss fabrication with Florida Precision Integration of fabrication requirements into ASME calculations (weld & joint efficiencies - note variable ‘E’) Complete final design: conceptual -> DETAILS

15 Overview Project Modification Work to Date Imminent Work Semester Completion

16 Semester Finale Utilizing final design concepts: Work-in final dimensions Complete full ASME validation calculations Deliver design to Dr. Brenner, Dr. Flemming If possible, order clamps Final deliverable of a complete cryogenic environmental testing chamber