Project Management Lecture 22 Readings Chapter 14 Lecture 22 Short Project Management.XLSX Lecture 22 Project Management.XLSX Lecture 22 Event Management.XLSX.

Slides:



Advertisements
Similar presentations
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. A PowerPoint Presentation Package to Accompany Applied Statistics.
Advertisements

Presented by: Waymon Lofton & Jerry Coppo Practical Risk Analysis 2007 AACEI Conference.
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
Project Management Lecture 16 Project management involves estimating the length of time to complete a project Once a project has been undertaken then a.
Presenter: Victor C. Tyler, P.E. Estimating and Bidding Strategies that Drive Best Practices.
Introduction to Risk Analysis Using Excel. Learning Objective.
Construction Engineering 221 Cost Estimating and Bidding II.
ICS 442 Software Project Management
INVESTMENT APPRAISAL NON DISCOUNTING By Lucky Yona.
Materials for Lecture 11 Chapters 3 and 6 Chapter 16 Section 4.0 and 5.0 Lecture 11 Pseudo Random LHC.xls Lecture 11 Validation Tests.xls Next 4 slides.
Decision Tree Analysis. Decision Analysis Managers often must make decisions in environments that are fraught with uncertainty. Some Examples –A manufacturer.
SW Project Management Project Schedule and Budget
Engineering Economic Analysis Canadian Edition
SEEM 3530 Program Evaluation and Review Technique
Degree and Graduation Seminar Cost Management
Chapter 12 – Independent Demand Inventory Management
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Spreadsheet Demonstration
Chapter 9: Simulation Spreadsheet-Based Decision Support Systems Prof. Name Position (123) University Name.
Dr. István Fekete: The Role of Integrated Risk Management in Organizations April11th, Budapest.
Materials for Lecture 16 Read Chapters 13 and 14 Lecture 16 Portfolio Analyzer Low Corr.xlsx Lecture 16 Portfolio Analyzer High Corr.xlsx Lecture 16 Insurance.
Introduction to Monte-carlo Analysis for software development
The AIE Monte Carlo Tool The AIE Monte Carlo tool is an Excel spreadsheet and a set of supporting macros. It is the main tool used in AIE analysis of a.
About the Exam No cheat sheet Bring a calculator.
Engineering Economic Analysis Canadian Edition
1 Chapter 7 Applying Simulation to Decision Problems.
AMERICA’S ARMY: THE STRENGTH OF THE NATION Mort Anvari 1 Cost Risk and Uncertainty Analysis MORS Special Meeting | September.
Materials for Lecture 08 Chapters 4 and 5 Chapter 16 Sections Lecture 08 Bernoulli.xlsx Lecture 08 Normality Test.xls Lecture 08 Simulation Model.
Server Storage Gets Cheap Engr 1202 ECE Project Cost Analysis.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
PROJECT MANAGEMENT Approaches
© 2007 Pearson Education Decision Making Supplement A.
Project Management Lecture 22 Readings Chapter 14 Lecture 22 Short Project Management.XLSX Lecture 22 Project Management.XLSX Lecture 22 Event Management.XLSX.
Server Storage Gets Cheap Engr 1202 ECE Project Cost Analysis.
Chapter 12 Risk and Refinements on CB © 2012 Pearson Prentice Hall. All rights reserved
Simulation Chapter 16 of Quantitative Methods for Business, by Anderson, Sweeney and Williams Read sections 16.1, 16.2, 16.3, 16.4, and Appendix 16.1.
Materials for Lecture 19 Readings Chapter 14
HMP Simulation - Introduction Deterministic vs. Stochastic Models Risk Analysis Random Variables Best Case/Worst Case Analysis What-If Analysis.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Is There a Proper Accounting for Indirect Costs?
Supplementary Chapter B Optimization Models with Uncertainty
PROJECT MANAGEMENT.
Project Management Lecture 22
Chapter 12: Kay and Edwards
Bidding Strategies.
Auctions and Competitive Bidding
Managing Risk and Uncertainty
Prepared by Lloyd R. Jaisingh
Estimating Project Costs
PRESENTATION FOR 3rd DEGREE COMPULSORY SECONDARY EDUCATION STUDENTS
Cost Concepts for Decision Making
(Additional materials)
Materials for Lecture 18 Chapters 3 and 6
Supplement: Decision Making
Activity-Based Costing Chapter 3
Event Chain Methodology
Lecture # 4 Software Development Project Management
ENGINEERING MANAGEMENT (GE 404)
Risk Analysis & Success Driven Project Management
Chapter 6: Estimating demand and revenue relationships
Systems Design: Process Costing
Engr 1202 ECE Project Cost Analysis.
ARCH 435 PROJECT MANAGEMENT
Activity-Based Costing Chapter 3
Lecture 7 PROJECT SCHEDULING Ferdinand Fassa.
Software Cost Estimation
Agile Project Management and Quantitative Risk Analysis
Simulation Supplement B.
FACULTY OF ENGINEERING CONSTRUCTION AND BUILDING DEPARTMENT
Presentation transcript:

Project Management Lecture 22 Readings Chapter 14 Lecture 22 Short Project Management.XLSX Lecture 22 Project Management.XLSX Lecture 22 Event Management.XLSX Lecture 22 Stochastic Bid Analysis.XLSX

Project Management Project management involves estimating the length of time to complete a project Once a project has been undertaken then a project manager is responsible for carrying out the project on the assigned time table How do the managers establish a time schedule –Generally based on average length of time for each component –Average length of time based on past experience Length of time to complete each step is a random variable

Project Management Who does project management? –Engineers, managers, accountants –They estimate number of days to completion Generally do not incorporate risk Benefits of incorporating risk into project management analysis –Assign a probability to number of days until project is completed –Assign a probability to getting a project done in a fixed timeframe; potential bonus

Project Management KOV for a project management problem is: How many days will it take? There is no final answer until project is completed Answer is an unknown PDF of days, weeks, or months to completion Simulation provides a methodology for estimating unknown PDFs Formulate the problem as a Monte Carlo simulation problem

Project Management Model formulation –KOV is “Number of Days” to completion –Identify each task (step) for project –Specify order of each task for the project Identify bottlenecks where tasks will wait on precious stages –Determine the PDFs for number of days (or weeks, months, etc.) to complete each task Rely on experience from past jobs Depend on experts or subcontractors for the time to complete each task PDF may be dependent on resources available

Project Management Critical to identify the order of the tasks and their linkages (dependencies), for example: –Task 10 starts after Tasks 5 and 8 are completed –Task 11 starts after Task 10 is completed Thus, Task 5 or 8 could hold up the whole project –If analysis shows 5 is the bottleneck is it worth investing more resources in Task 5 to get the project completed earlier?

Project Management Create a simple Project Network Diagram to summarize the order of tasks Drawn it in Excel with simple arrows and boxes Network diagram shows potential bottlenecks

Project Management Tasks 1-6, 2 and 3 wait on 1, 4 waits on 2, 5 waits on 3 and 4, last task (6) waits on 5 Assumes next task starts day after its predecessor ends Days in column C are GRKS() stochastic

Project Management Scheduled number of days to complete the project is 45 days P(Days>45)=?

Spreadsheet of a Project Management Analysis

Project Management Expanded I like to add a second KOV – Cost We know cost of a project is stochastic So project management model can simulate PDFs for days and cost In the example $/day costs for each task are multiplied by stochastic days

Bid Analysis in Business Businesses are often asked to prepare bids for uncertain projects, such as: –Build a house –Build a road or bridge –Build an airplane Past experiences help in bid preparation –The cost categories are commonly known –But what of the risks? –Risks are taken into consideration based on perceived risks or past experience

Bid Analysis in Business How fixed price bids work –Contractors provide a fixed price bid –Must deliver finished product at a fixed price –If costs exceed expectations, they must absorb cost excesses in terms of reduced profits which could turn into losses –Risks are: price of inputs (materials), cost & performance of sub-contractors, performance of materials, performance of finished product, liability for environmental quality during project, interest rate, weather, etc.

Bid Analysis in Business Bids for new projects can be couched in terms of a stochastic simulation problem The KOV is the simulated cost vs. bid Objective of management: submit a bid price that is low enough to get accepted, but high enough to insure a profit –Sounds like game theory? –We can set it up as a simulation model with the objective that the bid insures an x% chance of a profit

Bid Analysis in Business Model formulation –KOV is the bid and probability of a profit –Bid = Sum of costs + Desired Profit –Stochastic variables are any factor which affects the cost and are uncertain Break each cost category into its basic component Labor costs = f( hourly, contract labor, professional labor, management time, etc.) Get estimates of the PDF for each labor cost item from an expert in that field Materials costs are risky, get estimates of PDFs from experts for each material

Bid Analysis in Business Example model to bid on a research project Example is for an international research project Start with a simplified budget for the project Notice all of the uncertainties CategoryQuantityCost Researchers3 to 6$35,000 each Grad Students 1 or 2$15,000 each Local Facilitators 2 or 3$10,000 each Secretarial1$24,000 Fringe Benefits 40% of salaries Travel10 to 15 trips $2-$3,000 each Materials$5 to $8,000

Stochastic Bid Analysis -Deterministic Best Case/Worst Case - Lowest Cost is $244,100 or the “Best Case” scenario - Average Cost is $350,850 or the “No Risk” scenario - Highest Cost is $462,600 or the “Worst Case” scenario -Stochastic Results of Budget Simulation 1000 iterations - Mean$351,379 - Minimum$266,419 Note: This is much higher than the “Worst Case” - Maximum$440,159 Note: This is less than the “Best Case” Probability of under bidding project for alternative bids: - P(costs > 375,000)=33.89% - P(costs > 400,000)=16.67% - P(costs > 425,000)=2.4% - P(costs > 350,000)=50.5%

Bid Analysis in Business The bid if you ignore the risk –Average Cost is $350,850 Stochastic Analysis yields the following

Bid Analysis in Business Because we are uncertain about the cost of facilitators and researchers we can run a scenario analysis on these costs

Bid Analysis in Business Example of a bid analysis for building a house ActivityCost of Materials –Site Preparation5K, 10K, 20K –Concrete50K – 60K –Steel75K, 80K, 90K –Lumber80K – 100K –Electrical30K –Sheetrock21K – 25K –Exterior Walls41K – 45K –Paint18K – 25K –Floor Covering18K – 22K –Interest Rate7% – 8.5% –Overhead 30K – 35K –Profit Residual

Contractor’s Bid Analysis

CDF of Profits for Alternative Bid Prices

Bid Analysis As a manager one job is to estimate how much to bid a contract We can use the project management, cost analysis to estimate the best bid for a contract The costs are at risk and if we bid to low our profits are reduced or an actual loss is incurred Bid to high and your company does not get the job

Bid Analysis as a Stochastic Problem

Event Planner Event planner KOVs –Number of days ahead to start planning an event –Cost of the event Research application KOVs –Time to complete a research project –Cost of a project Wedding planner –Probability of being ready on time –Cost of the event Banquet planner

Event Planner