HIE-ISOLDE HEBT: characteristics Beamline diameter: 40 mm (REX: 100 mm) Beamline height: 1.75 m Beamline vacuum: low 1e-7- high 1e-8 mbar Connection of.
Advertisements

Magdalena Kowalska, CERN PH-SME-IS ISOLDE scientific coordinator’s report ISCC meeting, July 6, 2011 Beam requests and schedule 2011 Experimental statistics.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
EHN1 Claude Pesce DGS/RP. Why TREC & buffer zones?  Radiological control of material leaving beam areas is a legal obligation.
Interfaces with the SNS Project for the ARCS Instrument Doug Abernathy ARCS Hardware Project Manager ARCS Construction Project Review DOE Germantown Aug.
Task Card Templates Choose one slide below each week to create a task card for a Tech Tub station. Make sure to fill in the “Notes” below the task card.
ISCC 24 May 2004L.M. Fraile L.M. Fraile, CERN PH/IS ISOLDE scientific coordinator’s report ISOLDE Collaboration Committee 24 th May 2004 ISOLDE scientific.
TD/MSD TORUS CMM PRODUCTION: OVERVIEW G. Velev Clas12 Torus CCM Production Readiness Review –Dec 4, 2013.
IEFC Workshop 2011 David Mcfarlane Superintendent for SPS EN/MEF/ABA 1.
Canterbury College Engineering Department
Radiation testing in facilities outside CERN EDMS document version 2.0 Heinz Vincke - RadWG meeting 6/7/2010.
J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D. J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D SAFETY J.Pothier (GLIMOS) C.Schäfer (deputy GLIMOS) DISMANTLING.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
Physics coordinator report: Shifts 2014 Schedule 2015 Access, safety and courses b508 and 275 Magdalena Kowalska.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
B508 and 275 Magdalena Kowalska. b275 2 AEGIS laser lab ASACUSA test setup g-BAR? Storage of big parts, test stands? Test setups SSP, detector labs Electronics.
Access requirements D. Caforio Università di Bologna – INFN AFP Testbeam Organization meeting – October 18 th, 2012.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
Marc Tavlet - GLIMOS1 Paperwork needed to come and work at CERN 1. Access Rights – Registration 2. Tests with Beams 3. Safety Procedures to work at Point-2.
FACET User Support Carsten Hast Accelerator Research Division Test Facilities Department
ISOLDE Physics Coordinator Report Schedule Access to the hall Visits b275 and b508 Magdalena Kowalska.
Third Year Lab and Projects Head of Lab Prof Ralf Toumi Head of Projects, Dr John Tisch.
Scheduling News. Magdalena Kowalska. Injector schedule since last meeting 2 Confirmation of 2 week proton prolongation – until December 17 th : 35 ->
ADO-PO Section Meeting Safety Group LS1 Shutdown Safety Organization.
ISOLDE Physics Report Magdalena Kowalska. Injector schedule since last meeting 2 September: confirmation of 2 more weeks with protons – until December.
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
ISOLDE PH report Schedule 2012 Physics results 2012 Experiments, users New template Safety Long shutdown PH and ENSAR news Magdalena Kowalska Yorick Blumenfeld.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Magdalena Kowalska, CERN PH-SME-IS ISOLDE scientific coordinator’s report ISCC meeting, November 4, 2010 Running period 2010 Status of INTC shifts Accelerator.
Physics coordinator report: Overview of 2015 Karl Johnston.
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
Physics coordinator report 2015 overview 2016 schedule Safety & access B. 508 & 275 Karl Johnston.
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008 ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008.
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, February 11, 2008 ISOLDE scientific coordinator’s report INTC meeting, February.
HIE-ISOLDE Design Study Safety and Beam Quality Challenges for the HIE-ISOLDE Frontend Jacobo Montaño (EN/STI/RBS) HIE-ISOLDE Workshop, November 2013 *
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
Test beam check list Michael JECKEL EN-EA-EC. Content: Safety & Radiation Protection Arrival Access Installation Departure Michael JECKEL EN-EA-EC.
Test beam check list Michael JECKEL EN-EA-EC.
Some arrangements for personnel safety 1- Procedures for access
SPS Winter stop Planning meeting (N06) 05/01/2011
Physics coordinator report
Physics coordinator report
The Periodic Table G R O U P S P E R I O D S.
CE Status: Activities executed until 03/08 and ongoing
Preparation for CERN test beam
Physics coordinator report: Overview of 2015
Renovation of the 45-year old PS magnets
ISOLDE PH report Schedule 2012 Physics results 2012 Experiments, users
Test beam check list Michael JECKEL EN-EA-EC EDMS:
10/month is the present production rate 2 FTE + sporadic contributions
LHCb & EYETS
Alexander Herlert, CERN (PH-SME-IS)
Difficult beams accepted in 2014 (updated since last meeting)
A. Herlert, CERN PH-SME-IS
Magdalena Kowalska, CERN PH-SME-IS
Scheduling News . Magdalena Kowalska.
Magdalena Kowalska, CERN PH-SME-IS
A. Herlert, CERN PH-SME-IS
Fixed Decay Station at ISOLDE
Magdalena Kowalska, CERN PH-SME-IS
Coordinator’s report . Magdalena Kowalska.
Experimental Areas – LS2 planning
New procedures 2013: registration access
INTC matters . Magdalena Kowalska.
Thomas Nilsson, CERN EP/IS
A. Herlert, CERN PH-SME-IS
East Hall under construction
Alexander Herlert, CERN (PH-SME-IS)
Presentation transcript:

Schedule Access to the hall b508. Magdalena Kowalska

ISOLDE schedule – part 1 2 GPS startup on schedule (end July); HRS – 2 weeks buffer eaten up and physics delayed by ca 1 week (CRIS and IDS runs changed into tests) Magnet cycling and slit position problems

ISOLDE schedule – part 1 3 GPS rather ok HRS: only one smooth run and then target piston problem – rescheduling

ISOLDE schedule – part 2 4 GPS: several new or prototype targets HRS: COLLAPS and CRIS – require ISCOOl bunching

ISOLDE schedule – summary Very difficult start-up  Still debugging in the online period HRS piston problem HRS multipoles on – no beam B508 delayed – CRIS, COLLAPS, SSP Policy: give some beam to every group => many changes to the schedule Some nice physics in spite of problems 5 Rare-earth collections of medical isotopes for PSI, Denmark, Lausanne ISOLTRAP: mass of Cd – 2/3 of programme in 1/3 of time, no Cs contasmination 206Hg for IDS – reasonable transmission The TATRA setup from Bratislava – new ISOLDE group and setup Solid-state studies with molten Pb and Sn targets In-source spectroscopy of At – WINDMILL and ISOLTRAP 11Li for Caen and Madrid groups – 1000 ions/s for > week, neutron detectors at LA1 31Ar at IDS, 1-2 ions/s for > week, target survived CERN-wide 3h power cut TISD: boron beams, molten salt, …

Proton schedule 2015 First protons: around April 5 First physics: hopefully mid-April Stop: mid-November or mid-December 6

Access to ISOLDE 7 From beginning of July:  Access to HIE-ISOLDE worksite: only local physicists when moving equipment  Access for users from Jura side

Access to ISOLDE Users requesting dosimeter after Jul 1 st : ( ) No temporary dosimeters possible To obtain dosimeter:  Follow online courses on general safety (as before)  Follow online RP course on Supervised Areas (as before)  Follow ISOLDE online RP course – NEW, no complaints until now  Present RP form signed by home institute – NEW, only 1 complaint until now To access ISOLDE:  Follow 2-h RP ISOLDE practical course – NEW (2pm Tue, Fri, no complaints until now)  Follow online electrical awareness course - NEW CERN staff requesting dosimeters: as before (online courses + 1-day course) Users and staff with valid dosimeters: After July 1 st : Follow ISOLDE online RP and electrical awareness course Follow new procedure when present medical certificate expires Access to ISOLDE via dosimeter (once tourniquet behind ISOLDE is ready), until then – with CERN card 8

Safety at ISOLDE 3 electrical incidents this year – safety teams looking closely Safety contacts at ISOLDE  General safety aspects, travelling experiments – GLIMOS (me)  For fixed-setups: Safety person for every aspect assigned -> CERN courses have to be followed Do not perform tasks for which you are not trained or at least briefed  Connecting electronics and cabling (before powering up)– no problem  Work with open circuits -> CERN “habilitation electrique” (2-day course) needed  Filling LN2 – use cryo gloves and safety glasses, get a briefing from the local cryo- safety person Electronics tests – electronics lab in b275, detector lab to come in b508 9

When at ISOLDE - practicalities Toolbox for (mostly) travelling experiments refilled:  Mechanical tools  Safety equipment: glasses, cryo-gloves, LN2 tubes, electrical insulating gloves and mat  Ask before taking tools of other experiments Mechanical workshop  Soon in b508  Before - self-service workshop in Prevessin – contact Ramon Folch Make sure that other respect safety rules:  E.g. HIE-ISOLDE workers closing the SAS door and the door to the worksite  E.g. users filling LN2 in flip-flops 10

b Hand-over meetings:  Civil engineering and cooling&ventillations – last week; points to be resolved identified  Electricity – this Wednesday  Safety – to be scheduled Remaining:  Closed cooling water system  Vacuum gas exhaust  Opening for SSP gases and fume cupboard Move in  Laser tables for COLLAPS and CRIS – this week  CRIS laser setup by a technician – next week  Proper move of all users - January