Tuesday 7 th August - morning 07:10 Reinjection after loss of fill 2920 to UFO near ALICE  26 pb -1 in 1h16m; peak lumi 6.4e33 cm -2 s -1 08:10 dump at.

Slides:



Advertisements
Similar presentations
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
Advertisements

MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
Thursday 21/4 07:30: End of fill #1727. Beam dumped. ALICE compensator magnet fault. Delivered ~6.7 pb -1 in 7.5 h. 11:30 Stable beam # bunches/beam.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
:30 meetingEBH 1  No beam during the morning:  4:15 – 9: V distributor: Recovery after electrical interruption  access for TI services.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
LHC Status Tue Morning 22-Aug
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Luminosity lifetime – fill 2932
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
LHC summary week 32 Coordination: Mike Lamont & Jan Uythoven
LHC Morning Meeting - G. Arduini
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
Tuesday 22nd January - morning
Monday 6th August & night
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Summary of Week 16 G. Arduini, J. Wenninger
Lost at 12:05 to power converter (RTQX2.R1) problem
Note: squeeze in Atlas, CMS, LHCb and Alice on going
LHC Morning Meeting - G. Arduini
Friday 31st August & night
Mike Lamont, Jorg Wenninger
Wednesday 8th August & night
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Summary week 29 VdM scans Luminosity production
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
Chromaticity can make a difference…
Friday morning 10:30 Optics measurements and corrections.
Saturday – Morning 7:36 beams dumped
Not the most productive 24 hours on record
Friday Morning 7:30 injection for fill 2908
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Saturday 7th May Sat – Sun night
(on behalf of the LHC team)
Summary Thursday h21: Stable beams fill #1303.
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
LHC Morning Meeting - G. Arduini
Monday 14:00 beam dump Access:
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Thursday 26th July 13:21 Fill 2880 beam dumped
Friday 07:00 Fill 1729 dumped. Movement device allowed flag switching to FALSE. From the logs, it seems the energy went to FFFF/7860 GeV. To be confirmed.
Thursday – Morning Energy matching at injection with H CODs
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
LHC Status Tue Morning 22-Aug
Summary for LPC (March 7th, Ralph Assmann)
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
LHC Morning Meeting - G. Arduini
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Tuesday In the morning test cycle with probe for Q’ measurement.
Sat 15/10 New record bunch population profiting of the scrubbing period on Friday. Nb~1.42x1011p/bunch  110 MJ at 3.5 TeV. Filling slowed down by ZS sparking.
Wednesday h18: 228b fill lost just before start of ramp.
LHC Morning Meeting - G. Arduini
Tuesday – Morning and Evening
Another Immortal Fill….
Saturday 15th May One bunch 1 e11 per beam 09:57: start ramp
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Saturday 26 November 2011.
Presentation transcript:

Tuesday 7 th August - morning 07:10 Reinjection after loss of fill 2920 to UFO near ALICE  26 pb -1 in 1h16m; peak lumi 6.4e33 cm -2 s -1 08:10 dump at 450 GeV when moving out injection protection at pt 8  first to be a UFO. However, subsequent TDI position faults show that the loss was due to the TDI jaw not moving correctly, and one edge of the jaw going close to the beam. (Stefano) Some delay to TDI – reset required CHANGE OF PLAN – SWITCH OCTUPOLE POLARITY  Simple flip at 450 GeV (6.5 A)  417 A at flat-top & squeeze;  down to 300 A in collision BP LHC status

Step 1 Switch polarity at injection and inject full complement of 1374 bunches  Octupoles on at ±6.5 A  No signature selective blow-up seen  Dampers reduced gain - ditto LHC status

Step 2 14:00 Test ramp with pilot bunches  Anticipatory Q’ trims performed (up to 12 units at 4 TeV)  Thanks to Daniel and Themis – adjust of phase loop gain to avoid problem with RF modulation/low bunch intensity  Reasonable Q’ measurement through ramp, squeeze and collide as a result.  Chromaticity measurements fed-forward into settings, aiming for: +2 at 450 GeV Increasing to + 5 at end of ramp, through squeeze, and into collision 15:15 Beams dumped LHC status

Chromaticity – beam 1 ramp LHC status

Chromaticity – Vertical B1/B2 – flat top LHC status Decay at 4 TeV

Chromaticity – beam 1 – squeeze & adjust LHC status

Step 3 Ramp with 12 nominal bunches – smooth Beams dumped 18:10 LHC status

Step 4 Ramp, squeeze, collide, optimize with 480 bunches  Sensible bunch intensities  Ramp, squeeze, collide – no major issues  Tune scan  Stable beams for an hour  Reduce octupoles in Adjust at end-of-fill LHC status

Tune scan at start of collisions LHC status Steps of 1e-3 both planes, both beams Initial tune +3e-3 with respect to end squeeze (~nominal settings) Given below – this tune increase in collision beam process removed -1e-3 etc..

Octupole reduction with 480b LHC status Octupole current Beam lifetime

Octupole reduction – beam loss LHC status non-colliding bunches go walkies at 23 A

Step 5 Physics fill with 1374 bunches  ~1.47e11 at 450 GeV Smooth ramp and squeeze  Also enjoying effect of reduced emittances from injectors Just after end of squeeze - strong vertical instability  Clear visible on BBQ FFT at tune, beam 1 first  Supressed by frantically increasing chromaticity Q’ trim H+2 V+6 B1/2 LHC status

Beam loss – end squeeze LHC status

Beam loss – end squeeze LHC status

Lifetimes through squeeze and adjust LHC status

Beam sizes LHC status

Tune – B1V LHC status

Start of fill 2927 LHC status

Step 6 Increase octupoles to 475 A  reverse polarity, from 417 A Bump up vertical chromaticity in squeeze to around 7 Try again… today LHC status

Misc OFSU crashed 3 times during the shift SPS intervention (EDF) Thursday 10:00 for 2-3 hours TOTEM – third third of fill test incoming Access list developing  Markus Z. – point 4 – di/dt  N. Magnin – LBDS  RP – RAMSES reset  Ralph S. – UA47 and tunnel LHC status