1 Public Teleconference 9/9/2015 Agenda and Schedule RPS Calculator Update: V6.1, Land Use Data, Portfolio Selection.

Slides:



Advertisements
Similar presentations
Development of an Illinois Energy Efficiency Policy Manual A Proposed Process and Approval Plan Presented by: Karen Lusson Illinois Attorney General’s.
Advertisements

1 February 10-11, 2015 Revisions to RPS Calculator (v6.0) Workshop.
Chapter 60A-1, F.A.C. Rule Development Workshop Tampa, Florida September 24, 2003.
1 R : LTPP Track II Workshop – Operating Flexibility Modeling Results Patrick Young Analyst, Generation & Transmission Planning California Public.
CVD Risk Reduction Group Retention Draft Guidelines July 2005.
OVERVIEW OF RPS CALCULATOR FUNCTIONALITY 1. Model Specification Model developed to provide plausible portfolios to CPUC LTPP and CAISO TPP to facilitate.
Renewable Net Short.
Public Teleconference 6/29/2015 Agenda, Schedule, and Question for Stakeholders RPS Calculator 50% RPS Energy Only Special Study.
REPORT TO GRPE 71 ST SESSION EVE IWG 1 Electric Vehicles and the Environment (EVE IWG) Informal document GRPE st GRPE, 8-12 June 2015, agenda.
11 A presentation on A-16 Themes for The FGDC Steering Committee June 5, by Wendy Blake-Coleman US EPA Lifecycle Management Work Group.
1 Analytical Tools, Data & Scenarios Workshop July 29, 2004 California Water Plan Update 2004.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
American Community Survey ACS Content Review Webinar State Data Centers and Census Information Centers James Treat, ACSO Division Chief December 4, 2013.
R E T I Coordinating Committee California’s Renewable Energy Transmission Initiative: Status Update California Public Utilities Commission California Energy.
11 Cap-and-Trade Auction Proceeds Funding Guidelines for Agencies that Administer California Climate Investments September
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
1 August 3, 2015 Environmental Considerations in RPS Calculator CEC IEPR Workshop.
EDS 2 Early Delivery Systems Release 3 – Workshop August 16, 2007.
FINAL CLEAN POWER PLAN Before the Virginia Energy Efficiency Council Virginia Department of Environmental Quality November 12, 2015.
CALIFORNIA DEPARTMENT OF EDUCATION Tom Torlakson, State Superintendent of Public Instruction Updates and Current Issues ISES Meeting December 2011.
CALIFORNIA ENERGY COMMISSION Workshop on the Staff Draft 2006 Summer Outlook Report December 8, 2005 Hearing Room B.
Work Related to Senate Bill 2202 (effective January 1, 2001)
ISIS Project Status Report May 18, 2006 Prepared by MAXIMUS, Inc Education Systems Division for the ABT Committee.
0 eCPIC User Training: v6.5 Webinars August 2014 These training materials are owned by the Federal Government. They can be used or modified only by FESCOM.
Locational Net Benefit Analysis Working Group June 1, am – 3 pm Webinar drpwg.org.
09 May 2015 TAKE 1.5H TO UNDERSTAND AND SEE THE TYNDP 2016 PROJECTS ASSESSMENTS RESULTS Public webinar.
1 RETI 2.0 Plenary Group Meeting 3/18/2016 DRAFT 2016 RPS Portfolios.
Update for the Citizens Advisory Committee February 22, 2017
LNBA Subgroup: Avoided Transmission Value
Transmission-Distribution Interface Working Group Meeting
WIND And Solar ENERGY CONVERSION MODEL GUIDELINES Consultation update – September 2016 Presented by Marcelle Gannon.
Locational Net Benefit Analysis Working Group
Waste Confidence/Continued Storage – Status Update
Consolidated EIM Initiatives from 2017 Roadmap Issue Paper
Locational Net Benefit Analysis Working Group
Teacher Evaluation Timeline
August ICA Agenda Time Topic 8:00 – 8:15
State Lobbyist Services
CBP Biennial Strategy Review System
Capital Project / Infrastructure Renewal – Making the Business Case
Annual Strategic Planning Draft Timeline and Process
Status of the Planning Working Group’s (PWG) Efforts
Status Update for Reliability/Market Power Mitigation Assessment
Performance Management Workday Module
2017 RSSAC Organizational Review – Overview
T-D Interface Working Group November 2, 2017 Energy Storage and Distributed Energy Resources Phase 3 (“ESDER 3”) UPDATE Jill Powers.
CEOS Work Plan Steven Hosford, ESA/CNES, CEO CEOS SIT-33
CBP Biennial Strategy Review System ~Meetings Detail~ DRAFT August 29, /6/2018 DRAFT.
CBP Biennial Strategy Review System
Introduction to Growth Scenario Working Group
Revised engagement approach for draft GTAC
Portfolio Management Process & Customer Request Management
Market Interface Committee
2016 Billing and Coding Collaborative- Webinar Two Michigan Primary Care Transformation Project August 30, 2016.
Convergence Bidding Working Group – 10/22/09
IEP Team Meeting Facilitation: What is it and How can it benefit Georgia districts? Today we are here to introduce to you a new and exciting initiative.
School Improvement Ratings Rule 6A , F.A.C.
Exit Capacity Substitution and Revision
RTI University ScorecarD
NERC Reliability Standards Development Plan
Market Interface Committee
Next Steps Advisory group debrief call Circulate meeting summary
Development of energy balance statistics
NERC Reliability Standards Development Plan
Massachusetts’ Next-Generation Accountability & Assistance System
DER Growth Scenarios and Load Forecasts Working Group
New Special Education Teacher Webinar Series
The Seller’s Webinar will begin promptly at 1:03
UIG Task Force Progress Report
UIG Task Force Progress Report
Presentation transcript:

1 Public Teleconference 9/9/2015 Agenda and Schedule RPS Calculator Update: V6.1, Land Use Data, Portfolio Selection

Teleconference Information Toll-Free Number: Participant Passcode: Meeting will be recorded and posted on RPS Calculator page:

Agenda for Teleconference ItemPresenter Time (min) 1. Introduction and Purpose of CallEnergy Division5 2. Review of the RPS Calculator Version 6.1E3 & B&V*25 3. Overview of Recent Ruling and Staff Paper A. Summary of Staff Paper B. Summary of Information Requested from Parties Energy Division25 4. Timeline of RPS Calculator ActivitiesEnergy Division5 5. Q & AParticipants60 *Presentation will reference “Release Notes” posted to RPS Calculator home page: 1A301DF962DE/0/CPUC_RPSCalc_ReleaseNotes_v61_ pptx

Update Schedule from Oct Staff Paper Addressed in teleconference on 6/29/2015 Results expected December 2015 Addressed in 8/28/15 Ruling and Staff Paper Workshop to follow in Oct/Nov identify portfolio selection process land use information

Overview of Land Use and Portfolio Selection Ruling and Staff Paper Addresses two unresolved issues in Tracks 2a and 2b raised in October ruling and staff paper – Land Use Information – Portfolio Selection/Process Alignment Presents options for resolving both topics Solicits feedback from parties for two types of solutions: – Interim (2015) – Permanent (2016 and ongoing)

Options for Representing Land Use Information in RPS Calculator Screening: remove land and associated generic renewable resource potential from supply curve used by RPS Calculator to fill future net short Scoring: assign different risk or mitigation costs to different areas of land to influence economic selection by RPS Calculator Prior versions of RPS Calculator (and RETI) have used both options, in different ways at different times Due to time and resource constraints, Energy Division is only considering screening for developing portfolios for upcoming 2016 LTPP and TPP cycle – Proposals for scoring methodologies may be submitted, but will be discussed at a future workshop in 2016 – Multiple alternative screens may be considered in portfolio selection process

Summary of Land Use Data Requested from Parties Interim (1A): For use in 2015 for 2016 LTPP and 2016/17 TPP – Geographic datasets that meet definitions of RETI Category 1 and/or RETI Category 2 Unique, significant, plausible – Answers to questions in staff paper – Will be discussed at public workshop in Oct/Nov 2015 Permanent (1B): For ongoing annual use in future planning cycles – Geographic datasets (do not need to be limited to RETI category definitions) – Answers to questions in staff paper – Will be discussed at public workshop in Q1 2016

Options for RPS Portfolio Selection Criteria for Choosing Portfolios Criteria for Adjusting Portfolios (“post-processing”) Alignment with LTPP and TPP – Inputs and Assumptions – Timing

Summary of Portfolio Selection Information Requested from Parties Interim (2A): For use in 2015 for 2016 LTPP and 2016/17 TPP – Answers to questions in staff paper – Will be discussed at public workshop in Oct/Nov 2015 Permanent (2B): For ongoing annual use in future planning cycles – Answers to questions in staff paper – Will be discussed at public workshop in Q1 2016

Draft RPS Calculator Schedule (updated from schedule discussed on 6/29/15 teleconference) DateActivity June 2015Energy Only/Special Study Webinar July 2015RPS Calc 6.1 released August 2015Land Use/Process Alignment Ruling Released September 2015Land Use/Process Alignment Webinar Oct/Nov 2015Land Use/Process Alignment Workshop December 2015Special Study Results Available from CAISO Q RPS Calc 6.2 Released (inc. modified Energy Only parameters, if applicable) Portfolios Developed and Vetted Portfolios Submitted to CAISO Q2-Q % Policy-Preferred Needs Assessment or Special Study (schedule depends on type and nature of studies)