Energy Efficient Through-holes The sole responsibility for the content of this publication lies with the authors. It does not necessarily reflect the opinion.

Slides:



Advertisements
Similar presentations
ENERGY CONSERVATION: HOME WRAP, INSULATION, AND STOPPING AIR LEAKS.
Advertisements

Finishes many options Walls wood shakes, shingles, board & batten (vertical), plank lap (horizontal), T1-11 ply, vinyl, fiber cement, aluminum, stucco.&
Timber Framed Structures
Walls Ron Gatepain constructionsite.
Building Methods Types of Structure.
PHSAUTOMOTIVESALSPHSAUTOMOTIVESALS SPARK PLUGS Thanks to NGK for picture.
Controlling the condition and drying of the structures in the building site.
Energy Efficient Through-holes Repository: Aho Hanna, Korpi Minna (edit) REALISATION OF AIR PROOF STRUCTURES AND CONNECTIONS IN RESIDENTAL BUILDING Techical.
Chapter 4: Air Leakage Control: Materials and Techniques
Welcome to Field Controls: HRV / ERV Training Duct Systems Part 3
Energy renovation of structures Moisture and microbial damage Supplementary insulation Renovation of structures The sole responsibility for the content.
Topic C1 Superstructures - walls
Unit A3-12 Insulating Agricultural Structures Problem Area 3 Construction Systems.
Lesson 12 Insulating Agricultural Structures Next Generation Science/Common Core Standards Addressed! CCSS. ELALiteracy. RST.9 ‐ 10.7Translate quantitative.
Presentation on Installation of a Domestic Cold Water Storage Cistern
Flash and FOIL® Frame Wall Insulation. Module 1 Masonry Wall Insulation Hybrid Spray Foam and Reflective Insulation System – Fi-Foil® Company Introduces…
Chapter 27 Insulating Structures. Objectives After reading the chapter and reviewing the materials presented the students will be able to: List the ways.
DOORS AND WINDOWS.
P1a 1.5 Heat transfer by design. Lesson Objectives To investigate factors that affect the rate of thermal energy transfer. To describe how thermal energy.
HVAC maintenance and energy efficient renovations The sole responsibility for the content of this publication lies with the authors. It does not necessarily.
Outcome 3 (part 2) Heat emitters and their components Unit 208: Central heating systems.
Energy Efficient Through-holes The sole responsibility for the content of this publication lies with the authors. It does not necessarily reflect the opinion.
Construction site weather shielding and condition control The sole responsibility for the content of this publication lies with the authors. It does not.
Controlling the condition and drying of the structures in the building site The sole responsibility for the content of this publication lies with the authors.
Part 2: Buildings as a System Lee F. Ball Jr., PhD
Heating foil Ecofilm C Installation guide. ECOFILM C - OPTION For ceiling heating by heating foil ECOFILM C we offer following types : width (mm) output.
Walls of Structure Decreasing the Amount of Heat Exchange.
Residential Construction Window Installation Guide *Source: (1) Carpentry & Building Construction Feirer & Feirer (2) Sill to Sash; A Professionals Guide.
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
SHREE J.M.SABVA INSTITUTE OF ENGINEERING &TECHNOLOGY, BOTAD 1.BELADIYA VISHAL R. 2.PARMAR PRAKASH K. 3.DESAI PARAS V. 4.PARMAR VISHAL D. 5.GOHEL KAMLESH.
Residential Construction Unit 4- Window and Doors Mr. Todzia.
PLASTERBOARDS Plasterboard is a rigid flat sheet material which comprises of a core of gypsum plaster with the surfaces covered by stout paper. This covering.
R-Value? Refers to the efficiency of the insulation of a house Ratio of the temperature difference across an insulator and the heat flux.
PowerPoint ® Presentation Unit 52 Thermal Insulation and Other Insulating Methods Thermal Insulation Exterior Insulation and Finish Systems (EIFS) Roof.
Cladding attachment.
Unit 6/P6 – Timber Frame Construction Name ________________
SELECTING INSULATION MATERIALS  Insulation can serve as more than just an energy barrier, providing fire resistance, humidity control, and noise reduction.
Beamline Readiness Review - Hutch Beamline Microdiffraction March 28, 2006.
Direct Hot Water. What Cold Water System is Pictured? What hot Water System is Pictured?
Quality assurance of energy-efficient and moisture-safe constructions The sole responsibility for the content of this publication lies with the authors.
HVAC Energy Efficiency Ventilation, indoor air & heating installations HVAC adjustments and implementation The sole responsibility for the content of this.
Energy efficient connections in timber buildings The sole responsibility for the content of this publication lies with the authors. It does not necessarily.
Energy efficient connections in stone houses The sole responsibility for the content of this publication lies with the authors. It does not necessarily.
When drawing your plan, try and add as much detail as you can, labelling different features, such as double glazed windows and cavity walls. Draw two.
Certificate number: FS453/02 Application FS21 Firestop Panel is used to firestop mechanical and electrical services where they pass through fire rated.
Level 1 Diploma in Electrical Installation © 2014 City and Guilds of London Institute. All rights reserved. 1 of 10 PowerPoint presentation Visual inspection.
Learning Outcome Lesson Objective
Several Common Mistakes to prevent When Fitting a Fireplace Cap
Architecture Supported by:
CAD-Architecture Inst: Mr. Johnston Logan High School
Insulation Objectives
Warm-up 9/20/16 What is the underlayment called below the shingles?
INSULATION.
Objective 6.02 part 2: Recognize components of construction
Insulation Dr. Qing Wang
FS24 FIRESTOP COLLAR CONCEALED INTUMESCENT
Building Methods Types of Structure.
Objectives Describe the fasteners, anchors, and adhesives used in construction and explain their uses. f. Identify various types of mechanical anchors.
Electrical Gas Plumbing Heating & Cooling
Energy Efficient Construction and Training Practices: Basics
Building Construction I Sofia Sebastian 1
Arch205 building construction Windows- glazed curtain wall, skylights
Building Construction I Sofia Sebastian 1
II REVIEW.
MATERIALS AND CONSTRUCTION I
MODULE 9 – Building Envelope
PLUMBING MATERIALS, PIPE BENDING AND PRESSURE TESTING
Details These are drawings of specific elements where the designer wants to provide more detailed information than can be seen in the larger drawings.
Common Components of a Traditional Wood Framed Building
Passive houses.
Presentation transcript:

Energy Efficient Through-holes The sole responsibility for the content of this publication lies with the authors. It does not necessarily reflect the opinion of the European Union. Neither the EASME nor the European Commission are responsible for any use that may be made of the information contained therein.

Through-holes Badly sealed AC through- holes have caused decay and mould in boarding. When there is a vacuum inside the building, the mould spores move along to indoor air.

1. Plastic board is installed above the vapour barrier using separate battens. The vapour barrier of the roof is installed up against it. Holes for pipe through-holes can be made before or after the board installation. The hole should be cut mm wider than the diameter of the pipe. 2. Cellular plastic insulation is foamed under the vapour barrier and between the battens. The holes are made as before. 3. The hole-through pipe is foamed tight to the board collars in 1-2 layers. Pipe through-holes with plastic heat insulation

Sealing through-holes for pipes in the roof of a log building 1.The vapour barrier foil is taped to the through-hole for the pipe approx. 5 cm under the vapour barrier of the roof. 2.The foil is pressed or pleated loosely. 3.The vapour barrier foil is tightened to the other vapour barrier of the roof by battens or separate tightening battens

1.A sheet metal collar is fastened to the brick flue. The gap between the flue and the collar is sealed with a fire resistant joint compound before tightening. 2.The vapour barrier foil of the roof and the sheet metal collar are overlapped and the connecting joint is pressed to the bearer. In-situ masonry flue through-hole in a timber roof 1 2

Through-hole for stainless steel insulated chimney pipe in a timber roof 1.The vapour-proofing of the roof is turned up at the edges of the battens. 2.The gap between the flue and the roof batten is filled with fire-resistant mineral wool. 3.The joint is sealed with fire- resistant elastic jointing compound. Check out also the instructions from the flue manufacturer! 1 2 3

Of in-situ masonry flue in the roof of a log building 1.The vapour barrier foil of the roof is left long around the chimney flue and it is folded up loosely between the battens and the fire protection. 2.The sheet metal collar is fastened around the brick flue. Between the flue and the collar is non-flammable elastic jointing. 3.The end of the vapour barrier foil is overlapped between the sheet metal collar and the fire protection and the joint is taped. 4.The gap between fire protection and battens should allow the structure to settle

Electrical installation and electrical through-holes 1.Installations are made usually between the battens. They should not go through waterproofing. 2.Cables that go through the vapour barrier foil or pipe sleeves are installed using through-hole flashing. 3.Through-holes in plastic thermal insulation can be sealed by foaming. 4.The gap between the cable and the pipe sleeve is sealed with elastic jointing compound

Industrial through-holes! Industrial manufactured through- hole flashings save installation time and simplify the making of airtight structures. NB Read the instruction manual before installation. Exercise: Search the internet for pictures of ”vapour barrier” and ”through-hole flashing”.

Remember Make sure that the connection between through-holes and vapour barrier foils will stay unbroken even with movements of the frame. Favour industrial manufactured through-holes used with a vapour barrier. If taping is used in the connections, choose a vapour barrier tape that is fit for the purpose. Structures should stay airtight for decades. The principles of through-holes on a roof can be applied to through-holes on walls and floors. Interior walls of apartments and intermediate floors should also be made air proof, so air pressures in the apartments can be controlled.

Authors: Juha Vinha, Ralf Lindberg, Jussi Mattila, Jukka Lahdensivu, Jari Hietala, Jommi Suonketo, Minna Korpi, Hanna Aho, Kati Salminen, Kimmo Lähdesmäki, Elina Manelius, Vesa Kuhno, Kari Saastamoinen & Olli Teriö. Translation Ulrika Uotila & Myra Bird. References: Aho Hanna, Korpi Minna (toim.) Ilmanpitävien rakenteiden ja liitosten toteutus asuinrakennuksissa. Tampereen teknillinen yliopisto Tutkimusraportti 141. The good practices and principles required for the energy efficient building have been included in the teaching material. The writers are not responsible for their suitability to individual building projects as such. The individual building projects have to be made according to the building design of the targets in question.