AE Senior Thesis Natalie Bockhorst│Construction Management Chimay Anumba, PhD. PE Advanced Individual Training A.I.T. Barracks Fort Eustis, VA.

Slides:



Advertisements
Similar presentations
Produced by Empa IEA ECBCS Annex 50 Prefab Retrofit of Buildings Folie 1 Prefabricated Systems for Low Energy / High Comfort Building Renewal Project Presentation.
Advertisements

| Michael Gallagher | Construction Management AE Faculty Consultant: Dr. Riley The Pennsylvania State University AE Senior Thesis Project.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
INDUSTRIAL & SYSTEMS ENGINEERING
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
Penn State Architectural Engineering Senior Capstone Project Ramy Labna | Construction Option | Advisor: Prof Ray Sowers 2B + G + M + 7 Mansoura Development.
C AMPUS S QUARE H ARRISBURG, P ENNSYLVANIA A NDREW M ARTIN | C ONSTRUCTION M ANAGEMENT | A PRIL 12, 2010.
Kyle Goodyear BAE in Construction Management Pennsylvania State University Senior Thesis Presentation April 12, 2010.
2001 Winter Presentation. Site Location Site View.
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Daniel Bellay Lancaster County Bible Church Structural Option Lancaster County Bible Church.
The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management.
Daniel Suter Construction Management AE Senior Thesis Presentation The Pennsylvania State University Unknown Data Center Somewhere, USA
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
Bethesda Triangle Brian Groark Construction Management Faculty Consultant: Dr. Messner.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
Fisk Corporate Headquarters Houston, Texas Penn State AE Senior Capstone Project Stephen Blanchard – Construction Management Option Advisor: Dr. John Messner.
Northeast Hospital Expansion Penn State AE Senior Thesis Project Joshua Miller | Construction Management Option Faculty Advisor | Craig Dubler Courtesy.
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
Foundations of Technology.  To familiarize students with the function, applications, and requirements of construction management.
The Office Building Washington, D.C. Penn State Architectural Engineering Senior Capstone Project Brett Miller | Construction Option Advisor: Dr. Ed Gannon.
Kennedy Krieger Institute Outpatient Medical Center Baltimore, Marylan d Katie Sennett Construction Management Dr. Messner Spring 2008.
Charles Miller Construction Option Spring Dr. Riley WestEnd25.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
Wilsdorf Hall Materials Science Engineering & Nanotechnology Building University of Virginia Leaha Martynuska Construction Management Option Senior Thesis.
New Middle School Geneva, Il Greg Kemerer AE Senior Thesis 2006 – CM Option.
Government Office Center Mid-Atlantic U.S. Penn State AE Senior Thesis Project Alexander Ward | Construction Management James Faust | CM Advisor.
UPMC Passavant Pavilion & Addition Pittsburgh, Pa Jeremy McGrath Construction Management Senior Thesis Presentation 2009 The Pennsylvania State University.
Todd McCaskey Spring 2006 Senior Thesis Construction Management Penn State University Todd McCaskey’s Senior Thesis The Pennsylvania State University Architectural.
Adam Love Structural Senior Thesis Presentation 2010 The Pennsylvania State University FDA OC/ORA Office Building Silver Spring, MD.
Project Overview Analysis #1: Masonry Acceleration Adjusting the Critical Path Savings Potential Analysis #2: Façade Dimensioning Evenly Sized Elements.
Sullivan Trail Junior High Pocono Summit, Pennsylvania Andrew Mellow Goals Background Drawings Site Plan Schedule April 13, 2005.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
The Mary J. Drexel Home Assisted Living Addition Bala Cynwyd, PA Penn State AE Senior Capstone Project Gjon Tomaj – Construction Management Option Advisor:
Penn State Architectural Engineering Senior Capstone Project Quaid Spearing | Construction Option Advisor: Dr. Anumba April 15, 2014 South Halls Renovation.
Presented by Cameron Mikkelson April 16, 2014 Silverado Senior Living Brookfield, WI Analysis Topics On-site Prefabrication of Interior Wall Panels Installation.
Arts & Humanities Instructional Building Noah J. Ashbaugh Construction Management 2006.
Wardman West Residential Penn State AE Senior Thesis Project Kevin Kroener │Construction Option Faculty Advisor │Ray Sowers.
Thesis Research Proposal Aimee Bashore Franklin & Marshall College Row Lancaster, PA.
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
South Halls: Ewing-Cross Renovation AE Senior Thesis: Tech. 1 Quaid Spearing CM Option September 16, 2013.
BUILDING: LOCATION: SIZE: OCCUPANT: ARCHITECT: ENGINEERS: St. Francis Friary Hanceville, Alabama 59,900 square feet, 2 floors above grade Archdiocese.
PENN STATE AE SENIOR CAPSTONE PROJECT Adam Lasher │Construction Management Dr. Robert Leicht Susquehanna Health Patient Tower Expansion Williamsport, PA.
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
Albany Medical Center Patient Pavilion Albany, Ny Thomas J. Kleinosky – Structural Senior Thesis 2012 | Advisor: Dr. Hanagan.
ANTONIO DESANTIS VERNE STRUCTURAL OPTION ADVISOR: PROF. PARFITT APRIL 14, 2008 BRIDGESIDE POINT II PITTSBURGH, PA “BUILDING SYSTEM OPTIMIZATION” THE DEPARTMENT.
Hunter Woron Spring 2012 Structural Professor Parfitt.
Taylor Hall George Mason University Fairfax, VA Advisor: Ed Gannon Introduction Prevention through Design Façade Re-design for PtD Stick-Built vs. Infinity.
STEVE OGLESBEE, DREW WALKER, ALAN WONG SAN FRANCISCO WAR MEMORIAL.
Penn State AE Senior Capstone Project
North Hall | American University| Washington D.C.
Advisor: Professor M. Kevin Parfitt
Redifer Commons Addition & Renovation Project
MEDICAL OFFICE BUILDING at Tysons Corner
Introduction James W. & Frances G. McGlothlin Medical Education Center
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Codi Shine Analysis 1: Analysis 2: Analysis 3: Analysis 4:
Wrangle Hill Elementary School New Castle, DE
© LEAN CONSTRUCTION INSTITUTE
Daniel Suter Unknown Data Center Somewhere, USA
Ryan Johnson - Structural Option
AMBRIDGE AREA HIGH SCHOOL
Minuteman Vocational Technical Regional High School Progress
Project Background Type of building: Mixed-use residential building
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
DBIA Manual of Practice
Minuteman Vocational Technical Regional High School Progress
Presentation transcript:

AE Senior Thesis Natalie Bockhorst│Construction Management Chimay Anumba, PhD. PE Advanced Individual Training A.I.T. Barracks Fort Eustis, VA

Presentation Outline 1.Project Overview 2.Analysis #1: SIPS 1.Architectural Breadth 2.Structural Breadth 3.Analysis #2: Comparing Contracts 4.Analysis #3: Schedule Acceleration 5.Analysis #4: Modularization 6.Final Recommendations 7.Acknowledgements A.I.T. Barracks │Fort Eustis, VA │ Natalie Bockhorst │ CM Advanced Individual Training A.I.T. Barracks Fort Eustis, VA

Advanced Individual Training A.I.T. Barracks Fort Eustis, VA A.I.T. Barracks │Fort Eustis, VA │ Natalie Bockhorst │ CM Project Overview Project Name:Advanced Individual Training Barracks Location:Building #2301, Marshall St. Fort Eustis, VA Building Occupancy Type:Barracks Number of Stories:3 Gross Building Area:91,800 S.F. Presentation Outline 1.Project Overview 2.Analysis #1: SIPS 1.Architectural Breadth 3.Analysis #2: Comparing Contracts 4.Analysis #3: Schedule Acceleration 5.Analysis #4: Modularization 6.Final Recommendations 7.Acknowledgements

A.I.T. Barracks │Fort Eustis, VA │ Natalie Bockhorst │ CM Analysis #1 Short Interval Production Schedule: Masonry Façade WorkPresentation Outline 1.Project Overview 2.Analysis #1: SIPS 1.Problem Identification 2.Durations 3.Typical Sequencing 4.SIPS 5.Recommendation 6.Architectural Breadth 3.Analysis #2: Comparing Contracts 4.Analysis #3: Schedule Acceleration 5.Analysis #4: Modularization 6.Final Recommendations 7.Acknowledgements Problem Identification: ►Unforeseen conditions ►Mortar time consternate concerning precast elements ►Limited scaffolding

A.I.T. Barracks │Fort Eustis, VA │ Natalie Bockhorst │ CM Analysis #1 Short Interval Production Schedule: Masonry Façade Work ActivityArea A (Days)Area B (Days)Area C (Days)Area D (Days) Spray Foam Insulation11 5 Install Brick Veneer137 6 Brick Wash2222 Install Precast6661 Total ActivityTotal DurationUnitUnit/Day Spray Foam Insulation38 Days36,391sqft960 SF/Day Install Brick Veneer39 Days173,223 Bricks 4500 Bricks/Day or 990 SF/Day Install Precast19 Days297 precast16 Precast/Day A B C D Presentation Outline 1.Project Overview 2.Analysis #1: SIPS 1.Problem Identification 2.Durations 3.Typical Sequencing 4.SIPS 5.Recommendation 6.Architectural Breadth 3.Analysis #2: Comparing Contracts 4.Analysis #3: Schedule Acceleration 5.Analysis #4: Modularization 6.Final Recommendations 7.Acknowledgements

A.I.T. Barracks │Fort Eustis, VA │ Natalie Bockhorst │ CM Presentation Outline 1.Project Overview 2.Analysis #1: SIPS 1.Problem Identification 2.Durations 3.Typical Sequencing 4.SIPS 5.Recommendation 6.Architectural Breadth 3.Analysis #2: Comparing Contracts 4.Analysis #3: Schedule Acceleration 5.Analysis #4: Modularization 6.Final Recommendations 7.Acknowledgements Analysis #1 Short Interval Production Schedule: Masonry Façade Work

A.I.T. Barracks │Fort Eustis, VA │ Natalie Bockhorst │ CM July Area A South level 1 West level 1 North level 1 Area B North level 1 Area C North level 1 East level 1 South level 1 Area B South level 1 Spray Foam Install Brick Veneer Install Precast August Area D East/ South level 1 West/North level 1 East/South level 2 West/North level 2 Spray Foam Install Brick Veneer Install Precast Presentation Outline 1.Project Overview 2.Analysis #1: SIPS 1.Problem Identification 2.Durations 3.Typical Sequencing 4.SIPS 5.Recommendation 6.Architectural Breadth 3.Analysis #2: Comparing Contracts 4.Analysis #3: Schedule Acceleration 5.Analysis #4: Modularization 6.Final Recommendations 7.Acknowledgements Analysis #1 Short Interval Production Schedule: Masonry Façade Work

A.I.T. Barracks │Fort Eustis, VA │ Natalie Bockhorst │ CM Presentation Outline 1.Project Overview 2.Analysis #1: SIPS 1.Problem Identification 2.Durations 3.Typical Sequencing 4.SIPS 5.Recommendation 6.Architectural Breadth 3.Analysis #2: Comparing Contracts 4.Analysis #3: Schedule Acceleration 5.Analysis #4: Modularization 6.Final Recommendations 7.Acknowledgements Façade Work Schedule Durations Original Target Actual SIPS 120 Days194 Days59 Days Analysis #1 Short Interval Production Schedule: Masonry Façade Work It is recommended to use a SIPS for the Masonry Façade Work Façade Work Schedule Savings Original Target Actual SIPS 38%0%70% Cost Reduction: 1. Labor 2. Equipment

A.I.T. Barracks │Fort Eustis, VA │ Natalie Bockhorst │ CM Architectural Breadth North Elevation South Elevation East Elevation West Elevation Presentation Outline 1.Project Overview 2.Analysis #1: SIPS 1.Architectural Breadth 1.Original Brick Veneer Elevations 2.New Precast Façade Elevations 3.Comparison 4.Recommendation 3.Analysis #2: Comparing Contracts 4.Analysis #3: Schedule Acceleration 5.Analysis #4: Modularization 6.Final Recommendations 7.Acknowledgements Original Brick Veneer Elevations

A.I.T. Barracks │Fort Eustis, VA │ Natalie Bockhorst │ CM Architectural Breadth North Elevation South Elevation East Elevation West Elevation Presentation Outline 1.Project Overview 2.Analysis #1: SIPS 1.Architectural Breadth 1.Original Brick Veneer Elevations 2.New Precast Façade Elevations 3.Comparison 4.Recommendation 3.Analysis #2: Comparing Contracts 4.Analysis #3: Schedule Acceleration 5.Analysis #4: Modularization 6.Final Recommendations 7.Acknowledgements New Precast Façade Elevations

A.I.T. Barracks │Fort Eustis, VA │ Natalie Bockhorst │ CM Architectural Breadth North Elevation South Elevation North Elevation South Elevation Presentation Outline 1.Project Overview 2.Analysis #1: SIPS 1.Architectural Breadth 1.Original Brick Veneer Elevations 2.New Precast Façade Elevations 3.Comparison 4.Recommendation 3.Analysis #2: Comparing Contracts 4.Analysis #3: Schedule Acceleration 5.Analysis #4: Modularization 6.Final Recommendations 7.Acknowledgements New Precast Façade Elevations Original Brick Veneer Elevations

A.I.T. Barracks │Fort Eustis, VA │ Natalie Bockhorst │ CM Architectural Breadth East Elevation West Elevation East Elevation West Elevation New Precast Façade Elevations Original Brick Veneer Elevations Presentation Outline 1.Project Overview 2.Analysis #1: SIPS 1.Architectural Breadth 1.Original Brick Veneer Elevations 2.New Precast Façade Elevations 3.Comparison 4.Recommendation 3.Analysis #2: Comparing Contracts 4.Analysis #3: Schedule Acceleration 5.Analysis #4: Modularization 6.Final Recommendations 7.Acknowledgements

A.I.T. Barracks │Fort Eustis, VA │ Natalie Bockhorst │ CM Architectural BreadthPresentation Outline 1.Project Overview 2.Analysis #1: SIPS 1.Architectural Breadth 1.Original Brick Veneer Elevations 2.New Precast Façade Elevations 3.Comparison 4.Recommendation 3.Analysis #2: Comparing Contracts 4.Analysis #3: Schedule Acceleration 5.Analysis #4: Modularization 6.Final Recommendations 7.Acknowledgements Façade Cost Comparison Original FaçadeNew Façade Unit Masonry$65.00 Cost/SFPrecast Panels$ Cost/SF Precast Concrete$10.00 Cost/SF Total$75.00 Cost/SFTotal$ Cost/SF Façade Schedule Comparison Original TargetActualSIPSNew Façade 120 Days194 Days59 Days48 Days It is recommended to use a Precast Concrete Façade

A.I.T. Barracks │Fort Eustis, VA │ Natalie Bockhorst │ CM Analysis # 2: Comparing Contracts and Evaluating the RiskPresentation Outline 1.Project Overview 2.Analysis #1: SIPS 1.Architectural Breadth 3.Analysis #2: Comparing Contracts 1.Problem Identification 2.Design Build vs. Integrated Project Delivery 3.Risk Analysis Matrix 4.Recommendations 4.Analysis #3: Schedule Acceleration 5.Analysis #4: Modularization 6.Final Recommendations 7.Acknowledgements Problem Identification: ►Design Build Contract Approach ►Industry Issue

A.I.T. Barracks │Fort Eustis, VA │ Natalie Bockhorst │ CM Fundamental Principles Integrated Project DeliveryDesign Build Project Delivery  Mutual respect and trust  Mutual risk and reward  Collaborative innovation and decision making  Early goal definition  Early involvement of all key participants  Intensified Planning  Open and enhanced communication IPDDB ProsConsProsCons √Collaborative team X Target cost/value design √ Speed X Design choices are typically limited √ Early decision- making X Shared risk, reward, contingency √Consolidated cost risk held with the Design Builder X Decision making process is accelerated √ Dynamic cost modeling X Larger team √ Owner staffing requirement is reduced √ Advanced technical coordination √ Reduce RFI’s CO’s and total cost Presentation Outline 1.Project Overview 2.Analysis #1: SIPS 1.Architectural Breadth 3.Analysis #2: Comparing Contracts 1.Problem Identification 2.Design Build vs. Integrated Project Delivery 3.Risk Analysis Matrix 4.Recommendations 4.Analysis #3: Schedule Acceleration 5.Analysis #4: Modularization 6.Final Recommendations 7.Acknowledgements Analysis # 2: Comparing Contracts and Evaluating the Risk

A.I.T. Barracks │Fort Eustis, VA │ Natalie Bockhorst │ CM Likelihood Not Acceptable Risk Mitigation Acceptable Consequences When evaluating risk, risk can be defined as the likelihood (probability) versus consequences. Setting up the acceptable level of risk in various areas, likelihood of proposed scenarios and acceptability of their consequences can be illustrated in the form of a matrix Risk Analysis Design BuildIntegrated Project Delivery DescriptionOwnerArchCMSUBOwnerArchCMSUB Delays and Extras Insurance Dispute Resolution Incentive Compensation High Risk Medium Risk Low Risk Presentation Outline 1.Project Overview 2.Analysis #1: SIPS 1.Architectural Breadth 3.Analysis #2: Comparing Contracts 1.Problem Identification 2.Design Build vs. Integrated Project Delivery 3.Risk Analysis Matrix 4.Recommendations 4.Analysis #3: Schedule Acceleration 5.Analysis #4: Modularization 6.Final Recommendations 7.Acknowledgements Analysis # 2: Comparing Contracts and Evaluating the Risk A141 C195

A.I.T. Barracks │Fort Eustis, VA │ Natalie Bockhorst │ CM Presentation Outline 1.Project Overview 2.Analysis #1: SIPS 1.Architectural Breadth 3.Analysis #2: Comparing Contracts 1.Problem Identification 2.Design Build vs. Integrated Project Delivery 3.Risk Analysis Matrix 4.Recommendations 4.Analysis #3: Schedule Acceleration 5.Analysis #4: Modularization 6.Final Recommendations 7.Acknowledgements Analysis # 2: Comparing Contracts and Evaluating the Risk It is not recommended to use an IPD Approach

A.I.T. Barracks │Fort Eustis, VA │ Natalie Bockhorst │ CM Analysis #3 Schedule Acceleration TechniquesPresentation Outline 1.Project Overview 2.Analysis #1: SIPS 1.Architectural Breadth 3.Analysis #2: Comparing Contracts 4.Analysis #3: Schedule Acceleration 1.Problem Identification 2.Flow Charts 3.Last Planner 4.Recommendations 5.Analysis #4: Modularization 6.Final Recommendations 7.Acknowledgements Problem Identification: ►Unforeseen conditions ►Site work moved to critical path

A.I.T. Barracks │Fort Eustis, VA │ Natalie Bockhorst │ CM Presentation Outline 1.Project Overview 2.Analysis #1: SIPS 1.Architectural Breadth 3.Analysis #2: Comparing Contracts 4.Analysis #3: Schedule Acceleration 1.Problem Identification 2.Flow Charts 3.Last Planner 4.Recommendations 5.Analysis #4: Modularization 6.Final Recommendations 7.Acknowledgements Analysis #3 Schedule Acceleration Techniques

A.I.T. Barracks │Fort Eustis, VA │ Natalie Bockhorst │ CM The process for creating the weekly work plans will be as followed: Monday – Update the project schedule Tuesday – Develop the future schedule Wednesday – Update the schedule if necessary Thursday – Distribute the weekly work plan for the following week to foremen, so they can prepare for the next weeks work Presentation Outline 1.Project Overview 2.Analysis #1: SIPS 1.Architectural Breadth 3.Analysis #2: Comparing Contracts 4.Analysis #3: Schedule Acceleration 1.Problem Identification 2.Flow Charts 3.Last Planner 4.Recommendations 5.Analysis #4: Modularization 6.Final Recommendations 7.Acknowledgements Analysis #3 Schedule Acceleration Techniques Project: A.I.T. Barracks 4 Week Lookahead Schedule Site Work Activity Schedule M T W T F S Mark Existing Utilities XXXX Actual Last Planner Earthwork Inspections X X X Actual Last Planner Remove Existing Trees X X X X Actual Last Planner Rough Grade Building Pad X X X Actual Last Planner Install Storm Drain X X X X X X Actual Last Planner Underground Electric X X X X X X X X X X Actual Last Planner

A.I.T. Barracks │Fort Eustis, VA │ Natalie Bockhorst │ CM Presentation Outline 1.Project Overview 2.Analysis #1: SIPS 1.Architectural Breadth 3.Analysis #2: Comparing Contracts 4.Analysis #3: Schedule Acceleration 1.Problem Identification 2.Flow Charts 3.Last Planner 4.Recommendations 5.Analysis #4: Modularization 6.Final Recommendations 7.Acknowledgements Analysis #3 Schedule Acceleration Techniques It is recommended to use the Last Planner

A.I.T. Barracks │Fort Eustis, VA │ Natalie Bockhorst │ CM Presentation Outline 1.Project Overview 2.Analysis #1: SIPS 1.Architectural Breadth 3.Analysis #2: Comparing Contracts 4.Analysis #3: Schedule Acceleration 5.Analysis #4: Modularization 1.Problem Identification 2.Schedule Impact 3.Areas of Modularization 4. Financial Feasibility 5.Recommendations 6.Final Recommendations 7.Acknowledgements Analysis #4: Analyzing the Effects of Modularization Problem Identification: ►Repetitive and standardized building ►Reduce schedule

A.I.T. Barracks │Fort Eustis, VA │ Natalie Bockhorst │ CM On-Site Construction Schedule Light Steel Framing with Modular Bathroom Units Schedule Modular Construction Schedule Presentation Outline 1.Project Overview 2.Analysis #1: SIPS 1.Architectural Breadth 3.Analysis #2: Comparing Contracts 4.Analysis #3: Schedule Acceleration 5.Analysis #4: Modularization 1.Problem Identification 2.Schedule Impact 3.Areas of Modularization 4. Financial Feasibility 5.Recommendations 6.Final Recommendations 7.Acknowledgements Analysis #4: Analyzing the Effects of Modularization

A.I.T. Barracks │Fort Eustis, VA │ Natalie Bockhorst │ CM Partial First Floor Plan – West Wing 28’- 7 ¼” 12’ - 8 1/8” Typical Room Enlarged Presentation Outline 1.Project Overview 2.Analysis #1: SIPS 1.Architectural Breadth 3.Analysis #2: Comparing Contracts 4.Analysis #3: Schedule Acceleration 5.Analysis #4: Modularization 1.Problem Identification 2.Schedule Impact 3.Areas of Modularization 4. Financial Feasibility 5.Recommendations 6.Final Recommendations 7.Acknowledgements Analysis #4: Analyzing the Effects of Modularization

A.I.T. Barracks │Fort Eustis, VA │ Natalie Bockhorst │ CM Crane Placement and Working Radius Plan Cost Comparison Original Cost:$18,618,720 Modular Construction Cost:$16,756,848 Benefits 1.Controlled factory environment 2.Cost Savings 3.Modular units are built on a flat surface 4.Average 50% schedule savings 5.There is less of a disturbance on site 6.Standardized design 7.Low waste 8.Environmentally friendly construction process Presentation Outline 1.Project Overview 2.Analysis #1: SIPS 1.Architectural Breadth 3.Analysis #2: Comparing Contracts 4.Analysis #3: Schedule Acceleration 5.Analysis #4: Modularization 1.Problem Identification 2.Schedule Impact 3.Areas of Modularization 4. Financial Feasibility 5.Recommendations 6.Final Recommendations 7.Acknowledgements Analysis #4: Analyzing the Effects of Modularization

A.I.T. Barracks │Fort Eustis, VA │ Natalie Bockhorst │ CM Analysis #4: Analyzing the Effects of ModularizationPresentation Outline 1.Project Overview 2.Analysis #1: SIPS 1.Architectural Breadth 3.Analysis #2: Comparing Contracts 4.Analysis #3: Schedule Acceleration 5.Analysis #4: Modularization 1.Problem Identification 2.Schedule Impact 3.Areas of Modularization 4. Financial Feasibility 5.Recommendations 6.Final Recommendations 7.Acknowledgements Cost Comparison Original Cost:$18,618,720 Modular Construction Cost:$16,756,848 It is not recommended to use Modularization Problems 1.Double Walls 2.Continual Vapor Barrier 3.Installation 4.Insulation 5.Water Infiltration 6.Roof 7.Logistics

A.I.T. Barracks │Fort Eustis, VA │ Natalie Bockhorst │ CM Final RecommendationsPresentation Outline 1.Project Overview 2.Analysis #1: SIPS 1.Architectural Breadth 3.Analysis #2: Comparing Contracts 4.Analysis #3: Schedule Acceleration 5.Analysis #4: Modularization 6.Final Recommendations 7.Acknowledgements Analysis #1: SIPS ►SIPS is Recommended Analysis #2: Contract Comparison ►IPD is not Recommended Analysis #3 Schedule Acceleration ►The Last Planner is Recommended Analysis #4 Modularization ►Modularization is not Recommended

A.I.T. Barracks │Fort Eustis, VA │ Natalie Bockhorst │ CM AcknowledgementsPresentation Outline 1.Project Overview 2.Analysis #1: SIPS 1.Architectural Breadth 3.Analysis #2: Comparing Contracts 4.Analysis #3: Schedule Acceleration 5.Analysis #4: Modularization 6.Final Recommendations 7.Acknowledgements Friends and Family AE Faculty Advisor: Dr. Anumba Balfour Beatty Construction Project Team U.S. Army Corps Project Team PACE Industry Members

A.I.T. Barracks │Fort Eustis, VA │ Natalie Bockhorst │ CM Questions?