Fostering worldwide interoperabilityGeneva, 13-16 July 2009 ATIS Intellectual Property Rights Policy Review Thomas Goode General Counsel, ATIS DOCUMENT.

Slides:



Advertisements
Similar presentations
Instructions for the WG Chair l At Each Meeting, the Working Group Chair shall: l Show slides #1 and #2 of this presentation l Advise the WG membership.
Advertisements

Instructions for the WG Chair l At Each Meeting, the Working Group Chair shall: l Show slides #1 and #2 of this presentation l Advise the WG membership.
PWG Instructions for the WG Chair At Each Meeting, the Working Group Chair shall: Show slides #2 and #3 of this presentation Advise the WG membership that:
GSC: Standardization Advancing Global Communications Towards a Common ITU/ISO/IEC Patent Policy by Masamichi Niiya Telecommunication Standardization Bureau.
Geneva, Oct 9, 2012 ATIS Intellectual Property Rights Activities 2012 – An Update Thomas Goode General Counsel, ATIS Document No: GSC16bis-IPR-08 Source:
Fostering worldwide interoperabilityGeneva, July 2009 "Update on Activities of the TIA IPR Standing Committee since GSC-13" Amy Marasco TIA Delegation.
Fostering worldwide interoperabilityGeneva, July 2009 Recommendations on FRAND Principle in IPR Policy CCSA Global Standards Collaboration (GSC)
Doc.: IEEE /024 Submission January 2001 Jim Carlo, Texas InstrumentsSlide 1 Patents and IEEE 802 Stds IEEE 802 Chair’s Viewpoint Jim Carlo General.
1 May 2007 Instructions for the WG Chair The IEEE-SA strongly recommends that at each WG meeting the chair or a designee: l Show slides #1 through #5 of.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ATIS Intellectual Property Rights Activities 2011 – An Update Thomas Goode General Counsel, ATIS.
Session Overview November , 2003 Jerry Upton- Chair Gang Wu – Procedural Vice Chair Eshwar Pittampalli – Liaison Vice.
Real Time Locating Systems (RTLS) Presented by: Craig K. Harmon NCITS T20, Convener.
Instructions for the WG Chair l At Each Meeting, the Working Group Chair shall: l Show slides #1 and #2 of this presentation l Advise the WG membership.
Doc.: IEEE /400 Submission November 2000 Matthew B. Shoemake, Texas InstrumentsSlide 1 Patent Policy Review Matthew B. Shoemake, Ph.D. IEEE g,
Doc.: 802_Handoff_Opening_Notes_r1 Submission November David Johnston, IntelSlide 1 IEEE 802 Handoff ECSG Chair’s Introduction David Johnston
Fostering worldwide interoperabilityGeneva, July 2009 Summary of GSC-14 IPR WG Meeting Antoine Dore, ITU IPR WG Chair Global Standards Collaboration.
ATIS Intellectual Property Rights Policy Review Thomas Goode General Counsel, ATIS DOCUMENT #:GSC13-IPR-08 FOR:Presentation or Information SOURCE:ATIS.
xx session2_opening_notes.ppt Submission May 2004 Ajay Rajkumar, Chair, Slide 1 IEEE Session #2 Opening Session Ajay Rajkumar.
Opening Plenary Presentation Session #4 Gary Robinson – Chair Mark Klerer – Jerry Upton Vice-Chairs IEEE /14.
Doc.: IEEE /0747r0 Submission May 2006 Lee Armstrong, Armstrong Consulting, Inc.Slide 1 TGp May Opening Presentation Notice: This document has.
January 17, 2005Chair, IEEE Opening January 2005 Plenary Session #12 Jerry Upton- Chair Gang Wu – Procedural.
Summary of GSC-13 IPR WG Meeting Tom Goode, ATIS IPR WG Chair DOCUMENT #:GSC13-CL-05r1 FOR:Presentation SOURCE:Tom Goode, IPR WG Chair AGENDA ITEM:3.4.
March 2006 Richard Paine, BoeingSlide 1 doc.: IEEE /0261r0 Submission 11k Denver Ad Hoc Agenda Notice: This document has been prepared to assist.
Doc.: IEEE /0661r0 Submission November 2004 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Doc.: IEEE /161r0 Submission January 2004 Al Petrick, IceFyre Semiconductor Slide WG Technical Editor’s Report January 2004 Interim Meeting.
IEEE 802 Handoff ECSG Chair’s Introduction
Submission Title: [WG-TG3b Meeting Report Sept04]
11k Seattle 3 Agendas Date: Authors: September 2005
11k Vancouver Ad Hoc Agenda
11k Vancouver Ad Hoc Agenda
11k Vancouver Ad Hoc Agenda
Instructions for the WG Chair
IEEE Wireless Coexistence TAG
APF Study Group Agenda September 13, 2004 September 2004
November 2013 Opening Report
TGu Agenda Date: Authors: January 2007 January 2007
TGu Ad Hoc Agenda Date: Authors: February 2007
Siemens, Roke Manor (Recording Secretary )
Towards a Common ITU/ISO/IEC Patent Policy
Sponsor Ballot Comment Resolution
doc.: IEEE /479r0 Mika Kasslin TGh chair
TGu Ad Hoc Agenda Date: Authors: February 2007
IEEE r: Fast BSS Transition TG Agenda
November 2005 Opening Report
Submission Title: [WG-TG3b Meeting Report Sept04]
July 2005 Opening Report Date: Authors: July 2005 July 2005
802.11p WAVE Opening and Agenda November p
Instructions for the WG Chair
What is a CA document? Date: Authors: March 2005 March 2005
January 2007 doc.: IEEE /1934r2 January 2007
Submission Title: [WG-TG3b Meeting Report September05]
TGu Ad Hoc Agenda Date: Authors: April 2007 April 2007
November 2012 Opening Report
May 2005 Opening Report Date: Authors: May 2005 May 2005
Report of TGv – September 2006
TGi Preliminary Agenda
BEAM Ad Hoc September Agenda and Report for LB97
IEEE r: Fast BSS Transition TG Agenda
Instructions for the WG Chair
IEEE r: Fast BSS Transition TG Agenda
IEEE IPR Policy Date: Authors: March 2006 March 2006
IEEE Wireless Coexistence TAG
Summary of GSC-13 IPR WG Meeting
TGu Agenda Date: Authors: May 2006 May 2006
Stephen McCann (Chair)
Submission Title: TG9ma Opening Report for July Meeting
IEEE Wireless Coexistence TAG
Instructions for the WG Chair
Submission Title: TG9ma Opening Report for September Meeting
Submission Title: TG9ma Opening Report for September Meeting
Presentation transcript:

Fostering worldwide interoperabilityGeneva, July 2009 ATIS Intellectual Property Rights Policy Review Thomas Goode General Counsel, ATIS DOCUMENT #:GSC14-IPR-009 FOR:Presentation SOURCE:ATIS AGENDA ITEM:IPR; 4 CONTACT(S):Thomas Goode

Fostering worldwide interoperability 2 Geneva, July 2009 The ATIS IPR Policy Review Task Force was established in November 2006 at the direction of the ATIS Board of Directors. It is comprised of IPR policy subject matter experts from ATIS Board companies. The Task Force’s mission is to determine whether ATIS’ IPR policy should be amended to make the standards development process more effective. No specific problems have been identified. The Task Force is taking a proactive approach to examine possible improvements. The Task Force has met on a monthly/bi-monthly basis (9 meetings since GSC-13). ATIS IPR Policy Review Task Force

Fostering worldwide interoperability 3 Geneva, July 2009 ATIS follows the ANSI Patent Policy Section 10.4 of the ATIS Operating Procedures details ATIS’ patent disclosure and assurance policy, which: Encourages the disclosure of relevant patented inventions at the “earliest possible time” in the development of ATIS deliverables; and Establishes that, if ATIS receives notice that a deliverable may require use of a patented invention, an assurance must be received that licenses will be made available on reasonable and nondiscriminatory terms. Background – ATIS IPR Policy

Fostering worldwide interoperability 4 Geneva, July 2009 The Task Force ’ s current work has focused on the issue of irrevocability of licensing assurances: A “straw” ballot was recently sent to Task Force members to gauge their views on 5 alternatives related to irrevocability. 4 of these alternatives suggest revisions to the ATIS Operating Procedures; the other alternative recommends that no change related to irrevocability is necessary. The results of the straw ballot will be reported to the ATIS Board. Recent Task Force Activity

Fostering worldwide interoperability 5 Geneva, July 2009 Future Task Force Issues The Task Force has identified other issues for consideration, including whether ATIS’ Patent Policy should specifically address: the imposition of assurance obligations on transferees; the potential creation of alternative ATIS IPR policies for specific committees; mandatory worldwide licensing; and mandatory exhaustive licensing. These issues have not yet been discussed, and whether consensus will exist regarding any of them is yet to be determined.

Fostering worldwide interoperability 6 Geneva, July 2009 Supplementary Slides

Fostering worldwide interoperability 7 Geneva, July 2009 ATIS Member Companies Participating in the ATIS IPR Policy Review Task Force ADTRAN, Inc. Alcatel-Lucent AT&T Cisco Corning Ericsson Global Crossing Hewlett Packard Motorola Net Traffic Nortel QUALCOMM Qwest Research In Motion Tekelec T-Mobile Verizon IPR Policy Review Task Force

Fostering worldwide interoperability 8 Geneva, July 2009 ATIS Patent Policy Section 10.4 of the ATIS OP If ATIS or ANSI receives a notice that a proposed American National Standard may require the use of a patented invention, the procedures in this clause shall be followed Statement from patent holder Prior to approval of such a proposed American National Standard, ATIS or ANSI shall receive from the identified party or patent holder (in a form approved by ATIS or ANSI) either: assurance in the form of a general disclaimer to the effect that such party does not hold or does not currently intend holding any invention the use of which would be required for compliance with the proposed American National Standard or assurance that: A license will be made available without compensation to the applicants desiring to utilize the license for the purpose of implementing the standard; or A license will be made available to applicants under reasonable terms and conditions that are demonstrably free of any unfair discrimination.