All The future of DC work. GEO DC workshop June 20042 Restructuring of DC and Detector Work for many reasons the DC work was not very efficient in the.

Slides:



Advertisements
Similar presentations
FCMAT Response & Preparation: Process Outline October 25, 2006.
Advertisements

RECOVERING HARDWARE INJECTIONS IN LIGO S5 DATA Ashley Disbrow Carnegie Mellon University Roy Williams, Michele Vallisneri, Jonah Kanner LIGO SURF 2013.
S3/S4 BBH report Thomas Cokelaer LSC Meeting, Boston, 3-4 June 2006.
For the Collaboration GWDAW 2005 Status of inspiral search in C6 and C7 Virgo data Frédérique MARION.
Cascina, January 24, 2005 Status of GEO600 Joshua Smith for the GEO600 team.
GWDAW-8 (December 17-20, 2003, Milwaukee, Wisconsin, USA) Search for burst gravitational waves with TAMA data Masaki Ando Department of Physics, University.
User Office Status Overview Elder Matias Canadian Light Source.
LIGO-G W Lessons Learned From E7 at LIGO Hanford Observatory Fred Raab Daniel Sigg.
G D Interferometer Status LSC Meeting, Ann Arbor, June 4, 2005 Daniel Sigg.
LIGO- G Z AJW, Caltech, LIGO Project1 Use of detector calibration info in the burst group
LIGO-G M Status of LIGO Barry Barish PAC Meeting Caltech 3-June-04 Upper limits on known pulsar ellipticities.
What is Business Analysis Planning & Monitoring?
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
Report From Joint Run Planning Committee R. Passaquieti & F. Raab - LSC / VIRGO Collaboration Meeting rd July 2007 – LIGO-G Z.
LIGO-G Z Detector characterization for LIGO burst searches Shourov K. Chatterji for the LIGO Scientific Collaboration 10 th Gravitational Wave.
Taking Inventory & Taking Action. Taking Inventory & Taking Action Overview of Workshop Key Tags on Table – NA communities around the globe Theme of this.
LIGO-G W News From Joint Run Planning Committee Roberto Passaquieti & Fred Raab 23May2007.
LIGO- G Z AJW, Caltech, LIGO Project1 Use of detector calibration info in the burst group
S.Klimenko, G Z, December 21, 2006, GWDAW11 Coherent detection and reconstruction of burst events in S5 data S.Klimenko, University of Florida.
Status of LIGO Data Analysis Gabriela González Department of Physics and Astronomy Louisiana State University for the LIGO Scientific Collaboration Dec.
LIGO- G D Status of LIGO Stan Whitcomb ACIGA Workshop 21 April 2004.
LIGO-G Z Detector Characterization SummaryK. Riles - University of Michigan 1 Summary of Detector Characterization Sessions Keith Riles (University.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
Novemebr 5, 2006LSC meeting1 Virgo Update Prospects on detector performance and running schedules B. Mours.
The Commissioning of the CLAS12 Detector V. Burkert, D. Carman, R. De Vita, D. Weygand CLAS12 workshop, June 21 st 2011.
Martin Hewitson Overview of DC work. GEO DC workshop June DC work Noise characterisation Noise projections, noise sources, noise couplings Calibration.
1 Feedback from the executive committee meeting Benno Willke GEO meeting, Glasgow October 2006.
Data Quality Vetoes in LIGO S5 Searches for Gravitational Wave Transients Laura Cadonati (MIT) For the LIGO Scientific Collaboration LIGO-G Z.
1 GEO outlook Benno Willke (presented by Bernard Schutz) LSC meeting, MIT Nov 2006.
Stefan Hild 1GWDAW 10, Brownsville, December 2005 Status of GEO 600 Stefan Hild, AEI Hannover for the GEO-team.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
LIGO-G Z April 2006 APS meeting Igor Yakushin (LLO, Caltech) Search for Gravitational Wave Bursts in LIGO’s S5 run Igor Yakushin (LLO, Caltech)
CERN-IT Oracle Database Physics Services Maria Girone, IT-DB 13 December 2004.
LIGO- G Z August 16, 2006August 2006 LSC Meeting - DetChar 1 Spectral Line Working Group Report Keith Thorne, Chair.
Status of coalescing binaries search activities in Virgo GWDAW 11 Status of coalescing binaries search activities in Virgo GWDAW Dec 2006 Leone.
LIGO-G D LSC Meeting Nov An Early Glimpse at the S3 Run Stan Whitcomb (LIGO–Caltech) LIGO Scientific Collaboration Meeting LIGO Hanford.
A Waveform Consistency Test for Binary Inspirals using LIGO data LSC Inspiral Analysis Working Group LIGO-G Z LSC Meeting Andres C. Rodriguez.
Searching for Gravitational Waves from Binary Inspirals with LIGO Duncan Brown University of Wisconsin-Milwaukee for the LIGO Scientific Collaboration.
S5 BNS Inspiral Update Duncan Brown Caltech LIGO-G Z.
LIGO-G Z Detector Characterization Summary K. Riles - University of Michigan 1 Summary of the Detector Characterization Sessions Keith.
LIGO- G D E7: An Instrument-builder’s Perspective Stan Whitcomb LIGO Caltech LSC Meeting Upper Limits Plenary Session 22 May 2002 LIGO Livingston.
Bryan ButlerEAC meeting 2003-Sep-091 Computing Issues: Scientific Requirements Bryan Butler EVLA Project Scientist for Software (starting 2003-Oct-01)
LIGO-G Z The Q Pipeline search for gravitational-wave bursts with LIGO Shourov K. Chatterji for the LIGO Scientific Collaboration APS Meeting.
LIGO-G Z Detector Characterization Issues K. Riles - University of Michigan 1 Detector Characterization Issues -- S2 Analysis & S3 Planning.
S.Klimenko, LSC, August 2004, G Z BurstMon S.Klimenko, A.Sazonov University of Florida l motivation & documentation l description & results l.
2014 CalCom Activity Plan based on last year’s work and open discussion: Periodic meetings with detector groups to discuss algorithms, discuss software.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Operations Automation Team Kickoff Meeting.
LIGO-G Z Detector Characterization Summary K. Riles - University of Michigan 1 Summary of the Detector Characterization Sessions Keith.
LIGO-G Z Status of the LIGO-TAMA Joint Bursts Search Patrick Sutton LIGO Laboratory, Caltech, for the LIGO-TAMA Joint Working Group.
LIGO-G Z Peter Shawhan, for the LSC Burst Analysis Group LSC Observational Results Meeting November 4, 2006 The S4 LIGO All-Sky Burst Search.
Brand Project Presentation FMC 6 Nov Brand Project – recent activity 11 January 2010 is change over date – for all media and materials Brand Book.
LIGO-G Z The Q Pipeline search for gravitational-wave bursts with LIGO Shourov K. Chatterji for the LIGO Scientific Collaboration APS Meeting.
LIGO-G05????-00-Z Detector characterization for LIGO burst searches Shourov K. Chatterji For the LIGO Scientific Collaboration 10 th Gravitational Wave.
Supporting quality devices
October 2006, LIGO Hanford Observatory
S5 First Epoch BNS & BBH Inspiral Update
The Q Pipeline search for gravitational-wave bursts with LIGO
Inspiral Analysis Group Results
On Behalf of the LIGO Scientific Collaboration and VIRGO
Report on the S2 Run Keith Riles (University of Michigan)
S2 Inspiral Hardware Injections
homework assignment due Feb 23
Jim Hough for the GEO collaboration
Towards the first coherent multi-ifo search for NS binaries in LIGO
Stan Whitcomb LSC meeting Hanford 15 August 2005
Analysis of L1 WaveMon S2 veto triggers
Inspiral Hardware Injections
Talk prepared by Stefan Hild AEI Hannover for the GEO-team
Joint bar-IFO observations
Authentication Username Password Submit.
Presentation transcript:

all The future of DC work

GEO DC workshop June Restructuring of DC and Detector Work for many reasons the DC work was not very efficient in the past site team does 70% of the time DC work only high priority task could be addressed by site team proposal of new structure: re-organize work done at the site → detector team perform the DC work in the search groups and in the detector group ensure the connection between the search groups and the detector group by having a detector group member in each search group increase manpower in detector group

GEO DC workshop June DC work in search groups find artifacts in data that cause problems in the analysis info transferred to detector group, they discuss the problem and improve the detector to avoid artifacts or suggest veto back to search group follow up analysis on triggers request information from detector group on instrumental and PEM channels for trigger time monthly review of the sensitivity and state goals for improvements (frequency domain and time domain) input to prioritization of detector optimization work

GEO DC workshop June S4 – Dates and Goals S4 will start Jan 7th and will last for 4 weeks LIGO goals: Sensitivity goals, inspiral range: H1: 7.5 Mpc L1: 4 Mpc H2: 2 Mpc Duty cycle: 70% individual ifos, 40% triple GEO goal: be factor of 3 for significant frequency range within worth LIGO detector, duty cycle: 90%

GEO DC workshop June S4 – preparation and shifts hardware freeze: Dec 12th control room preparation until Dec 22th LabView control computer operator monitors operator manual search group monitors DC work environment for operator SMS alarms operator shifts 6h – 14:30h, 14h – 22h, no overnight shifts