LHC Injectors Upgrade Project 11/11/2010 R. Garoby.

Slides:



Advertisements
Similar presentations
ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
Advertisements

Outcome from 2011 Chamonix workshop New structure of the SPSU Study Group E. Shaposhnikova /02/20111SPSU meeting.
PSB magnetic cycle 160 MeV to 2 GeV with 2.5E13 protons per ring A. Blas 2 GeV magnetic cycle 29/04/ Requirements 1.Present performance: 1E13p from.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
Status of the PSB 2 GeV Upgrade and the RCS Study SGUI Meeting B. Mikulec, 07 July 2011.
Summary and outcome of the 1st LIU-HL-LHC brainstorming meeting (24 th June 2011) Mike Lamont This event is jointly organized by the HL-LHC and LIU projects.
Ion Programme of LHC Hans-H. Braun Miniworkshop on Machine and Physics Aspects of CLIC based future Collider Option, Ion Programme of LHC Hans-H.
PS Booster Studies with High Intensity Beams Magdalena Kowalska supervised by Elena Benedetto Space Charge Collaboration Meeting May 2014.
CONTENT: Beam characteristics and parameters Filling schemes Operational settings OP procedure and COLL setting Planning Shift breakdown To define the.
HL-LHC/LIU Joint workshop Goal: Progressing towards an agreed set of 450 GeV beam parameters for High Luminosity operation in LHC after LS2 & LS3. Slides.
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER.
Update of achievable beam characteristics at injection in LHC H.Bartosik, C.Bracco, O.Brüning, C.Carli, K.Cornelis, H.Damerau, R.Garoby, S.Gilardoni, B.Goddard,
0 1 Alternative Options in the Injectors – Preliminary Summary H. Damerau LIU-TM#8 18 October 2013 Many thanks for discussions and input to T. Argyropoulos,
Production of bunch doublets for scrubbing of the LHC J. Esteban Muller (simulations), E. Shaposhnikova 3 December 2013 LBOC Thanks to H. Bartosik, T.
STATUS OF THE LHC INJECTORS UPGRADE (“LIU”) PROJECT R. Garoby for the LIU Project Team March 6, 2012CERN.
THE LHC INJECTORS UPGRADE (“LIU”) PROJECT R. Garoby for the LIU Project Team LIU-2011November 25, 2011CERN.
Some ideas for/from the SPS LIU-SPS team. Scrubbing (only) for ecloud in SPS? aC coating remains baseline..... –but scrubbing has many potential advantages.
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
LHC Injectors Upgrade Project 1/12/2010 R. Garoby.
Filling Schemes for the 2010 Heavy Ion Run Updated (3 rd iteration) version of BCWG presentation initially on 28 September, updated after discussions with.
Beam-Beam head-on Limit J. Barranco, X. Buffat, T. Pieloni, C. Tambasco, J. Qiang, K. Ohmi, M. Crouch for the Beam-Beam team BI BSRT Team George and Enrico.
LIU Beam Parameter Working Group Meeting #1: Ion parameter table Outline: Where we are standing What we need to do (still in 2015)
FCC-FHI 28/1/14 Requirements from Collider Draft parameters just available in EDMS:
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
Interface between TAC SR and SASE FEL Possibility for testing CLIC structure Avni AKSOY Ankara University.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
EVOLUTION OF BEAM CHARACTERISTICS DURING THE LIU PROJECT R. Garoby for the LIU Project Team March 7, 2012CERN.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
Introduction R. Garoby LIU 2014April 11,  LIU summary  LIU Highlights in 2013  Outcome of the «Review of LHC and Injectors Upgrade Plans» (Oct.2013)
High Intensity Beams in Existing Accelerators for CN2PY: SPS studies, PS issues E. Shaposhnikova Laguna-LBNO General Meeting CERN, Acknowledgments:
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
Research progress and plan CERN-KEK Committee, 2nd meeting 07/Dec/07 Masamitsu AIBA CERN-Japan fellow, AB/BI.
29 October 2015 B. Di Girolamo. B. Di Girolamo – Collider-Experiments Day – 5 th HiLumi Annual Meeting 2 Collider-Experiments Interactions There is a.
LIU-PS Beam Dynamics Working Group Introduction and objectives
ICE SECTION The coolest place to be! Elias Métral
MD Planning Fri – Sat (26. – 27.8.)
S. Roesler (on behalf of DGS-RP)
Impact of the current debuncher limitations (…can we get rid of longitudinal painting?)
Alternative/complementary Possibilities
Plans for ions in the injector complex D
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Status of the beta-beam study
Saturday 21st April 00:33 Interlock during ramp on BLM HV
LIU, ABP-CWG, PBC, miscellaneous
Update on the HiLumi/LIU parameters and performance ramp up after LS2
Acknowledgments: LIU-PT members and deputies, H. Bartosik
LHC status Benoit Salvant (Beams department, Accelerator and Beam Physics group) for the LHC complex teams With many thanks for their inputs to J. Boyd,
Machine Progress Towards Higher Luminosity
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
IS IT POSSIBLE TO INCREASE THE p INTENSITY FOR CNGS BY A FACTOR 2 OR 3
W. T. Weng Brookhaven National Laboratory
Progress towards Pulsed Multi-MW CERN Proton Drivers
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
LHC (SSC) Byung Yunn CASA.
Introduction to LHC beam production in PSB and PS
MEIC Cost Estimate Overview
News on TMCI in the SPS: Injecting high intensity bunches
Generation of Higher Brightness Beams for LHC
SPS collective effects Hannes, Gianni, Giovanni, Benoit, Yannis
First meeting of the LIS section: Welcome to the new members!!
Summary of session 9: "LHC Injectors Upgrade"
Another Immortal Fill….
Large emittance scenario for the Phase II Upgrade of the LHC
Updated MEIC Ion Beam Formation Scheme
Presentation transcript:

LHC Injectors Upgrade Project 11/11/2010 R. Garoby

R.G. 11/11/20102 OUTLINE 1.Organization 2.Strategy 3.Goals (first approach)

R.G. 11/11/ Organization

R.G. 11/11/20104ObjectivesOrganization Mandate “The LHC Injectors Upgrade should plan for delivering reliably to the LHC the beams required for reaching the goals of the HL-LHC. This includes LINAC4, the PS booster, the PS, the SPS, as well as the heavy ion chain.” Implementation The LIU Project will: – Analyse the HL-LHC requirements and propose an upgrade path for the injectors, exploiting the work done by the Task Forces on the „PSB energy upgrade“ and „SPS upgrade“ and by the Working Group on the SPS upgrade, – Organize the upgrades (WBS with resources and planning) and take care of their realization.

R.G. 11/11/20105 Project team LIU Project Leader: R. Garoby – Deputy: M. Meddahi Communication Weekly meetings of the Project Team (Thursday – 9h00)OrganizationOrganization

R.G. 11/11/ Strategy

R.G. 11/11/20107 Preliminary Comment Strategy Although the work done prior to the LIU Project will be fully exploited, the upgrade path recommended for the LIU Project may differ from the conclusions of the TFs because: Options are still open or not precisely defined (e.g.: e-clouds in the SPS, collimation and scraping,...) The PS, which was not in the mandates of the Task Forces, deserves analysis and certainly needs action Results from recent MDs in the injectors have to be taken into account Experience operating the LHC will influence the requirements The rate of implementation has to correspond to an acceptable spending profile for the organization.

R.G. 11/11/20108 Request to HL-LHC Strategy Beyond the detailed beam characteristics (distance between bunches, number of bunches, intensity per bunch, emittances etc.), the technical goal (beam specifications at the entrance of LHC) has to include: Margin in the LHC (beam loss, emittance blow-up in LHC itself) Tolerance for imperfection (equality between bunches in intensity and emittances) List of beam types (distance between bunches, number of bunches etc.) List of ions to consider with their specific list of parameters Preliminary discussion => official parameter list by end of 2011 => Need for a draft parameter list !

R.G. 11/11/20109 LIU rules Strategy LIU looks after the needs of the LHC, assuming that performance for the other users has to be kept unchanged: If performance is improved without any additional action, this shall be announced, If performance could be increased with additional action(s), this will be documented separately for separate financing

R.G. 11/11/ st December: „LIU day“ – Descriptions of the present ideas for the upgrades, – Discussion with collection of reactions and suggestions. Chamonix 2011 – Presentation of procedure followed by the LIU Project – Synthesis of open questions – List of required studies at the beginning of 2011 (short talk at the beginning of discussion after the last presentation in the LIU session) April 2011 (for MTP 2011) – Recommended upgrade path(es) (technical proposals) – Detailed work plan for 2011 and 2012 with resources – Baseline work plan for 2013 till 2016 with resourcesPlanning LIU Project

R.G. 11/11/ Goals

R.G. 11/11/ Draft beam specifications Goals Assumption: With Linac2, the PSB can deliver protons per ring within 2.5 mm.mrad and 1 eVs. With Linac4, the PSB will be able to provide protons per ring in the same transverse emittances and 1.2 eVs. DQ at 1.4 GeV injection of 1 eVs bunch with p in the PS on h=7 is taken as Scenario for increasing the LHC luminosity (private and preliminary!) Nominal luminosity (10 34 cm -2 s -1 ) reached with: 50 ns spacing, p/b, nominal emittances (3.75 mm.mrad), b*=0.55 m 2 x nominal luminosity reached with: 50 ns spacing, p/b, nominal emittances, b*=0.55 m or 25 ns spacing, p/b, emittances = 1.88 mm.mrad, b*=0.55 m 3 x nominal luminosity reached with: 25 ns spacing, p/b, emittances = 2.7 mm.mrad, b*=0.55 m 6 x nominal luminosity reached with: 25 ns spacing, p/b, emittances = 1.9 mm.mrad, b*=0.3 m

R.G. 11/11/ PSB-PS scenarios Goals Assumption: With Linac2, the PSB can deliver protons per ring within 2.5 mm.mrad and 1 eVs. With Linac4, the PSB will be able to provide protons per ring in the same transverse emittances and 1.2 eVs.  Q at 1.4 GeV injection of 1 eVs bunch with p in the PS on h=7 is taken as Double batch from the PSB