6 April 2007G. Rakness (UCLA) 1 CSC runs at minus side slice test 27 Mar. 2007 – 5 Apr. 2007 Color scheme: Successes Problems/questions Greg Rakness University.

Slides:



Advertisements
Similar presentations
Andrey Korytov July 2, Data Quality TB 2004 Andrey Korytov.
Advertisements

24 April 2007G. Rakness (UCLA) 1 Power cuts at Green Barracks/SX5 False fire alarms from the central fire alarm system (incendie central) cut power to.
22 May 2007G. Rakness (UCLA) 1 At minus-side slice test… Complete description of how to bring back slice test all the way from (power=off) to (local run=physics.
TMB-RAT Software Update USCMS Slice Test Rice University August 16, 2004 Martin Von der Mey / Yangheng Zheng* University of California, Los.
US Some Preliminary Test Beam Results T. Ferguson, N. Terentiev*, I. Vorobiev CMS EMU Meeting Fermilab Oct , 2004.
US Test Beam Results Of Front End Timing T. Ferguson, N. Terentiev* (Carnegie Mellon University) CMS EMU Meeting University of California, Davis Feb 25.
CSC Synchronization Procedure and Plans CMS Endcap Muon FNAL October 29, 2004 Jay Hauser* / Martin Von der Mey / Yangheng Zheng University of.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
US LPC Muon Group CMSSW code development efforts N. Terentiev Carnegie Mellon University CMS EMU Meeting, Florida Institute of Technology February 17-18,
Preliminary Results from Structured Beam Test CMS Trigger Meeting June 3, 2003 Brian Mohr UCLA Dept. of Physics.
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
S. Durkin, USCMS-EMU Meeting, Oct. 21, 2005 Critical Data Errors S. Durkin The Ohio State University USCMS EMU Meeting, FNAL, Oct. 20, 2005.
An Asynchronous Level-1 Tracking Trigger for Future LHC Detector Upgrades A. Madorsky, D. Acosta University of Florida/Physics, POB , Gainesville,
20 Oct 2009G. Rakness (UCLA)1 Powering on… Last week: CMS off to give evaporation time to dry out the experiment Monday – Tuesday: Began powering on CSCs.
15 Sept 2009G. Rakness (UCLA)1 Paper progress On the Analysis Review Committee for the paper: “Performance of the CMS Cathode Strip Chambers with Cosmic.
CMS Emu Meeting, Dec. 6, Electronics Long Term Operations What we learned from Electronics Commissioning G. Rakness U.C.L.A. Dec 6, 2008.
13 March 2007G. Rakness (UCLA) 1 Minus side slice test status Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
Status of the CSC Track-Finder Darin Acosta University of Florida.
Track-Finder Trigger at the Beam Test Results and Features Darin Acosta, Rick Cavanaugh, Victor Golovtsov, Lindsey Gray, Khristian Kotov, Alex Madorsky,
Test Beam Wrap-Up Darin Acosta. Darin Acosta, University of Florida 18 June 2004 USCMS Meeting 2 Agenda n Darin/UF: General recap of runs taken, tests.
CSC Synchronization documentation Step-by-step procedure to… – Read out a chamber – Synchronize triggers from many chambers (and read out data) Description.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
Draft of talk to be given in Madrid: CSC Operations Summary Greg Rakness University of California, Los Angeles CMS Run Coordination Workshop CIEMAT, Madrid.
4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,
UCLA meeting, 2012 Hauser1 Since last week Technical Coordination workshop Gave talk on CSC upgrades New 2013 timeline – ME4/2 seems okay, ME1/1 is tight,
CMS Latency Review, 13th March 2007CSC Trigger 1 Latency and Synchronization update.
Track-Finder Test Beam Results Darin Acosta. Darin Acosta, University of Florida 30 July 2004 Trigger Meeting CSC Beam Test (Muon Slice Test) ME.
10 th LECC Workshop, September 2004, Hauser et al.1 Experience with Trigger Electronics for the CSC System of CMS J. Hauser*, E. Boyd, R. Cousins,
S. Durkin, Software Review, March 16, 2006 FED Library S. Durkin The Ohio State University CSC Online Software Review, March 16,2005.
13 March 2007G. Rakness (UCLA) 1 RPC efficiency in RAT Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
Andrew Peck 1 CSC OTMB Firmware Meeting February 21, 2014 ALCT/TMB/RAT Test Stand at CERN Setting up complete duplicate of the ALCT-TMB-RAT test stand.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
22 Sept A slight reformulation of (ALCT) muonic timing… In terms of brass tacks.
PNPI / University of Florida Checking PC Timing Lev Uvarov CSC Time Synchronization Meeting May 12, 2009.
3 Nov 2009G. Rakness (UCLA)1 Weekend of 24 – 25 October Loaded all TMB firmware –Version 15 Oct 2009 XML file created using Jay’s muonic timing constants.
1 Status of the CSC system M. Ignatenko (UCLA) CSC Operation and DPG meeting CERN January 18, 2012.
Recall: CFEB inefficiencies Collision Run June 2010G. Rakness (UCLA)1 validation/run135445/ExpressPhysics/Site/PNGS/hORecHits.png.
CSC Ops/DPG meeting, 05-Oct-2011 Hauser1 ALCT boards for ME4/2 etc.
10/20/09 UCLA Meeting Hauser 1/9 Various updates Update on LHC/CMS schedule: First shots into collimator: Nov. 7 and 8! Circulating beam ~Nov. 18, less.
6-Dec-05PC Commissioning1 Peripheral Crate (PC) Commissioning Status Fred Borcherding, CSC/EMU Group.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
Update on “Muonic Timing” of CSC Electronics
Recall: CSC TF Halo rate spikes during run (23 May)
904 Status Recall last Group Meeting…
Timing/Synchronization Status
CSC Synchronization Procedure and Plans
CSC EMU Muon Port Card (MPC)
University of California Los Angeles
University of California, Los Angeles Endcap Muon Purdue
“Golden” Local Run: Trigger rate = 28Hz
CMS EMU TRIGGER ELECTRONICS
University of California Los Angeles
University of California Los Angeles
Current Status of CSC Trigger Elements – Quick Summary
Darin Acosta University of Florida
September CSC Beam Test Report
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
CSC Trigger Primitives Test Beam Studies
Analysis of Oct. 04 Test Beam RPC Data
University of California Los Angeles
Changes in Level 1 CSC Trigger in ORCA by Jason Mumford and Slava Valuev University of California Los Angeles June 11,
TMB and RAT Status Report
University of California Los Angeles
CSC Turn ON Status Report by Fred B.
Configuring the Peripheral Crates
FED Design and EMU-to-DAQ Test
Plans for the 2004 CSC Beam Test
CSC Electronics Problem Report CSCE I&C
Presentation transcript:

6 April 2007G. Rakness (UCLA) 1 CSC runs at minus side slice test 27 Mar – 5 Apr Color scheme: Successes Problems/questions Greg Rakness University of California, Los Angeles

6 April 2007G. Rakness (UCLA) 2 Run k events; trigger=singles ME-3/2/19 Report from DQM… All unpacked events: –do have this chamber in readout 100% –with all boards (ALCT, TMB, CFEB) present 100% A. Korytov (Florida)

6 April 2007G. Rakness (UCLA) 3 Run M events; trigger = singles on all chambers Trigger signals at Sector Processor (K. Kotov, Florida): – timed to within 0.2bx, except… – ME-3/1/10 ~ 0.6bx –Settings based on AFEB  ALCT and ALCT  TMB cable lengths successful (M. Ignatenko, UCLA) Data from ME-2/2/16 ALCT is bad, found to be ALCT and/or skew-clear cable. Remove ME-2/2/16 from data acquisition path… (Note: trigger = singles on all chambers for runs discussed today)

UF group 29 March ALCT0_BXN - L1A_BXN: PERFECT Run 57013: ALCT0-L1A BXN difference = 3, 4 Run 539: ALCT0-L1A BXN difference = 3 (the same for all!) A. Korytov (Florida) [Value of xml parameter alct_l1a_delay: Run = constant value Run 539 = set for each chamber to be value measured with scan]

UF group 29 March Raw anode hits: PERFECT 7.5 A. Korytov (Florida) Run 539: Anode hits for all chambers are captured right in the middle of the 0-15 window (average is ~7.5 for all chambers) [Formula by J. Hauser (UCLA) and A. Madorsky (Florida): If alct_l1a_delay has been timed in to be in the middle of the ALCT L1A window, then the number of time bins before pretrigger is equal to (alct_fifo_pretrig-6)+(alct_l1a_window_size-1)/2.] Time bin ALCT wiregroup

UF group 29 March CLCT0_BXN - L1A_BXN: no changes CLCT0-L1A BXN difference = -1, 0 A. Korytov (Florida) [No change observed, even though the setting for tmb_l1a_delay did change: Run = constant for all chambers Run 539 = value measured by TMB-L1A delay scan Why?]

6 April 2007G. Rakness (UCLA) 7 Run 542: Upgrade TMB firmware to 9 January 2007 version ISE compiled bug fix on 2 nd CLCT zero dead-time triad decoders Data look good with ISE compilation… A. Korytov (Florida) …(relatively minor) issues of word count in DMB data quality check… Go back to 5 September 2006 version (MTCC version)…

6 April 2007G. Rakness (UCLA) 8 Runs 546, 547: Upgrade ALCT firmware to 2 April 2007 version… modified timing of mux clock/control Run 57013: “ratty” anode wiregroup occupation histograms… Run 547: smooth distributions A. Korytov (Florida) ME-2/1/8 ME-3/1/8 Run 547 = HV on ring 1 chambers only, in order to trigger only on ring 1 CRC errors persist (<0.1/mil on 8/16, ~1% on 1/16)  cable at CFEB? Fiber?

6 April 2007G. Rakness (UCLA) 9 Run 552: Upgrade peripheral crate software w/expanded TMB, ALCT, DMB configuration from xml TMB/ALCT config verified with “check configuration” button Upgrade ME-3/1 with ALCT576mirror firmware v.02Apr07 Wiregroup distributions look good (begin at 1, end at 96) “Complete set” of parameters available to study trigger configurations ME-3/1/8 TMB was not triggering (similar occasional “slot 2 problem” seen during MTCC) ME-3/1/8 Run 546:Run 552: ME-3/1/8 A. Korytov (Florida)

6 April 2007G. Rakness (UCLA) 10 To do: update TMB firmware when available… header update to solve word count issue bit to turn off LCT  MPC (?) begin implementing configure using hard reset Does CSC handle it correctly? TMB and DDU counters checked during MTCC, but data never taken… Does ME-3/1/8 come back? begin systematic study of trigger configuration (see Jay’s talk)