High Intensity Neutrino Source HINS Linac Front-End R&D --- Systems Integration, Beam Diagnostics Needs, and Meson Lab Setup Bob Webber.

Slides:



Advertisements
Similar presentations
Superconducting Spoke Resonator Cavities and Cryomodules
Advertisements

ESS End-to-End Optics and Layout Integration Håkan Danared European Spallation Source Catania, 6 July 2011.
Project X Injector Experiment (PXIE) Steve Holmes Fermilab Proton Accelerators for Science and Innovation: Second Annual Meeting Rutherford Appleton Laboratory.
Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
 An h=4 (30 MHz) RF system will be used for electron operation. For protons, this would correspond to h=56, and the 1 kV maximum gap voltage would only.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
MEBT & RT CH Section Thomas Page Fermilab Accelerator Advisory Committee May 10 th – 12 th, 2006.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
F HINS Schedule of Activities in Meson During FY08 Bob Webber AD Safety Meeting December 5, 2007.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
STF Status and Future plan H. Hayano, KEK, LCWS12 Arlington System Test session 1.
High Power RF Systems, Control and Distribution in the HINS Alfred Moretti, Brian Chase, Chris Jensen and Peter Prieto Fermilab Accelerator Advisory Committee.
ANL-FNAL Collaboration on High Intensity Neutrino Source Activities G. Apollinari Introduction Collaboration Activities ‘05-’07 Achievements ’07-’10 Plans.
F Project X Overview Dave McGinnis October 12, 2007.
Fermilab High Intensity Neutrino Source R&D Program - Mission, Status, Plans, and Support Needs - For AD Department Heads March 2007 Bob Webber.
Anders Sunesson RF Group ESS Accelerator Division
HINS Front-End R&D --- Status and Plans Bob Webber Fermilab Accelerator Advisory Committee August 7, 2007 Update of May 10 th – 12 th, 2006 AAC Presentation.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
Alexander Aleksandrov Oak Ridge National Laboratory
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
Christoph Gabor, ASTeC HIPPI—Meeting (WP 5) 26 th – 28 th September 2007 Non—destructive transverse emittance measurement device The Front End Test Stand.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
HINS R&D Giorgio Apollinari Fermilab Accelerator Advisory Committee May 6-8 th, 2008.
Overview of HINS Operations and Radiation Shielding Considerations in the Meson Detector Building Bob Webber August 16, 2006.
Proton Driver Resources & Schedule (R&D Plan) Rich Stanek May 10, 2005.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
June 3, 2004G.W.Foster - Proton Driver Proton Driver Project Development, Tactics & Strategy G. W. Foster Fermilab User’s Meeting June 3, 2004.
F. f 2 Definitions Proton Driver –Generic name for past ~15 years for new, higher intensity machines and schemes to replace present Linac and Booster.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
Project X RD&D Plan 325 MHz Linac including High Intensity Neutrino Source (HINS) Program Bob Webber AAC Meeting February 3, 2009.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
Fermilab SRF Linac Development Steve Holmes Workshop on High Intensity Proton Accelerators October 19, 2009.
Project X High Power 325 MHz RF Distribution and Control Alfred Moretti, Nov 12, 2007 Project X Workshop.
Introduction to the effort on C-ADS accelerator physics and review charges Jingyu Tang For the Joint IHEP-IMP group on the C-ADS Accelerator Physics International.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
CW Linac Lattice August, 29 N.Solyak, B.Shteynas.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
D. Li, Project X Collaboration Meeting, Fermilab (October 25-27, 2011) Overview of Project X Frond-End R&D at LBNL Derun Li Project X Collaboration Meeting.
HINS Status and Strategy/Plans with Respect to Project X Bob Webber AAC Meeting November 16-17, 2009.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
ESS Front End diagnostic
Bunch Shape Monitor for HINS Wai-Ming Tam Project X Collaboration Meeting September 11, 2009.
Chris Adolphsen Sergei Nagaitsev
ESS RF Development at Uppsala University
Superbeams with SPL at CERN
CEPC RF Power Sources System
High Intensity Neutrino Source R&D Overview
ADS Accelerator Program in China
LINAC4 commissioning plans etc.
Electron Source Configuration
Pulsed Ion Linac for EIC
Advanced Research Electron Accelerator Laboratory
Ciprian Plostinar Workshop on Testing and Commissioning
The SPL-based Proton Driver at CERN
RF introduction Anders Sunesson RF group leader
Injector/Linac Design Status C. E
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

High Intensity Neutrino Source HINS Linac Front-End R&D --- Systems Integration, Beam Diagnostics Needs, and Meson Lab Setup Bob Webber

Fermilab 2 Motivation and Timeline Motivation – –Test key un-proven technologies important to the low- energy front-end (β<0.4) section of the proposed 8 GeV Superconducting H- Linac Timeline – –Accomplish the R&D necessary to establish technical credibility and cost basis for the Linac front-end by ~2010 Funding Resources – –$10M in FY06 (FNAL and collaborators; SWF and M&S) –similar funding projected for FY07 and 08 until recent rumblings from DOE (within the last 4 weeks)

Fermilab 3 R&D Objectives Demonstrate high power RF distribution and 4.5 millisecond pulse operation of multiple cavities from a single klystron Demonstrate device and system performance of high power vector (IQM) modulators for amplitude and phase control of multiple cavities Measure axially-symmetric beam performance with RT-CH (room temperature, crossbar H-type) spoke resonator cavities and SC solenoid focusing in the RT Linac Demonstrate low transition energy (10 MeV) to and application of superconducting spoke resonator accelerating structures Demonstrate high-speed (nanosecond) beam chopping at 2.5 MeV Demonstrate performance of this Linac concept and resulting beam quality to 90 MeV

Fermilab 4 R&D Plan Install and commission 2.5 MW, 325 MHz klystron system Equip and operate a 325 MHz high power RF component test facility Fabricate, install, and operate a test cryostat for 325 MHz SC spoke cavities Construct and test key components of the low-energy Linac concept Assemble the 10 MeV RT Linac, operate with beam, and verify performance Install 325 MHz SC spoke resonator cryomodules and operate with beam up to 90 MeV This all adds up to building a first-of-its-kind superconducting 90 MeV H- linac

Fermilab 5 Major Activity Areas in Meson 325 MHz Klystron and Modulator Area 325 MHz RF Component Test Facility Cavity Test Cave (RT-CH and superconducting cavities) Ion Source, RFQ, and 2.5 MeV Absorber Area 90 MeV Accelerator and Beam Absorber Cave

Fermilab 6 Meson Building Floor Plan 90 MeV Linac Klystron and Modulator Area RF Component Test Facility Cavity Test Cave 200 ft. Ion Source and RFQ Area

Fermilab 7 View Into Klystron/Modulator Area (early May)

Fermilab MHz 2.5MW Klystron (early May)

Fermilab msec Klystron Pulse Transformer (early May)

Fermilab MHz Waveguide Circulator (early May)

Fermilab 11 View Into Klystron/Modulator Area (June 9)

Fermilab 12 View Into Klystron/Modulator Area (June 9)

Fermilab 13 Klystron and Waveguide (June 16)

Fermilab 14 Modulator Capacitor Cabinet (front) (June 28)

Fermilab 15 Modulator Switch Cabinet (back) (June 28)

Fermilab 16 Modulator Switch Cabinet (front) (June 28)

Fermilab 17 View Down (Future) Linac Beam Line

Fermilab 18 Layout Through Second β=.4 Cryostat Ion SourceRFQMEBTRoom Temperature 16-Cavity, 16 SC Solenoid Section Two Β=0.4 SSR 11-Cavity, 6-Solenoid Cryostats Two Β=0.2 SSR 9-Cavity, 9-Solenoid Cryostats 2.5 MeV50 KeV 10 MeV 20 MeV 60 MeV 30 MeV 90 MeV

Fermilab 19 Meson Linac Cave Cross-section

Fermilab 20 Beam Diagnostics - Minimum on-line (P. Ostroumov) Current transformers (CT) Beam phase pick-up – necessary to control energy stability during the operation Initial tune-up of the cavity field and phase Beam profile wire scanners (or/and laser scanners) Beam loss monitors – about 20 – distribute along the linac Inter-cryostat space should include –CT –BPM, includes phase pick-up –Wire scanner

Fermilab 21 Off-line (temporary installation) The temporary diagnostics station is desirable to use at the end of the following linac sections RFQ+MEBT, RT section, SSR1, SSR2 - will be permanent place Diagnostics station includes (minimum set) 1 solenoid (or 3 quads, triplet) 2 steering magnets 2 BPMs, includes phase pick-up 3 profile monitors 2 current transformers Beam dump –water cooled Energy degrader Faraday cup Fast Faraday cup CCD camera with the quartz foil Maximum set, extend for –Emittance station – slit-collector – copy from SNS –Bunch length – custom design

Fermilab 22 Machine and Beam Parameters Two operating modes providing 1.56E14 ppp –3 millisecond 8.6 mA average beam pulse at ≤ 2.5 Hz –1 millisecond 26 mA average beam pulse at ≤ 10 Hz Bunch Frequency – 325 MHz –(1/4 of ILC 1.3 GHz) –Chopped in MEBT (2.5MeV) at 53 MHz (~ 2 of 6 bunches missing) and at 89 KHz (~1.6 microsecond gap); therefore peak beam current is ~1.5 times average current stated above Beam tube aperture –20mm bore radius through focusing solenoids; 15mm? through warm RF cavities

Fermilab 23 Baseline - 05/15/06 – Trans. envelopes

Fermilab 24 MEBT – June 12, 2006: Dimensions OK Increase this space and use it for the steering magnet

Fermilab 25 CH-SSR1 Strip-line BPM This space can be increased up to 204 mm

Fermilab 26 So What is Needed Now? Beam current transformer electromechanical designs BPM pick-up electromechanical design(s) for RT and SSR Linac sections Scanning wire electromechanical designs Laser wire design Beam phase monitor system design Beam energy analysis system Beam bunch length monitor? Electronics for all above

Fermilab 27 SNS Diagnostics plate

Fermilab 28 BPM (SNS)

Fermilab 29 Meson Schedule 2006 Short “mock” Linac cave section available –May 2006 Klystron modulator completion –July 2006 (late July) 325 MHz RF power system commissioning –July 2006 (early August) 325 MHz component testing in RF test area –Starting August MHz RT cavity power testing in cavity test cave –September 2006 Superconducting cavity test cryostat installation –October 2006 Ion Source installation in Meson –November 2006

Fermilab 30 Meson Schedule 2007 RFQ (now in procurement) delivery and power testing –January 2007 RT cavity and coupler testing –Starting February MeV beam tests –Beginning February 2007 First SC spoke resonator power tests in test cryostat –April 2007 Linac cave construction and utilities installation –May 2007 Demonstration of multiple cavity RF distribution and independent amplitude & phase control –July 2007 Beam accelerated through first ‘N’ RT cavities –September 2007 (optimistic)

Fermilab 31 Meson Schedule 2008 Full 10 MeV RT linac installed –April 2008 R&D beam operations at 10 MeV –Starting May 2008 First SC spoke resonator cryomodule installation –October 2008 Tests of RT + SC cavity RF distribution and independent amplitude & phase control –November 2008 Beam through first SC spoke cryomodule –December 2008 (optimistic)

Fermilab 32 Manpower Resources A Lab-Wide effort is required and now being applied –Beam line components are designed and procured by Technical Division –RF and conventional power source components and systems integration and operation are the responsibility of the Accelerator Division –Particle Physics Division is supplying manpower for utilities and infrastructure installation in the Meson building –Laboratory Safety Section and Accelerator Division Safety Department are already at this early stage actively involved Key technical systems now lacking required attention –RF power distribution system (tightly coupled with cavity design status and power requirements) –Low level RF systems – system design, modeling, hardware (partially mitigated via LBNL MoU) –Cryogenics delivery system engineering for the Meson Linac cave –Beam instrumentation design (partially mitigated by BNL MoU)

Fermilab 33 Summary Considerable activity is now underway on component design, procurement, and facilities to support planned R&D It will be an exciting next 12 months to bring 325 MHz klystron and RFQ on-line and to accelerate beam in the Meson Building Key areas, presently lacking effort necessary to maintaining desired schedule, are identified

Fermilab 34 Backup Slides

Fermilab 35 Meson Building Floor Plan

Fermilab 36 Modified, 05/25, Trans. envelopes