TOWR-S Coordination with NWS Operations and Training Eric Guillot, Mike Johnson, & the TOWR-S Team 11 May 2016 1.

Slides:



Advertisements
Similar presentations
NWS Western Region and Coastal WFO Eureka Mel Nordquist, SOO WFO EKA Crescent City KCEC Arcata KACV Eureka WFO.
Advertisements

Update on GOES-R Proving Ground Activities at the Operations Proving Ground Chad Gravelle GOES-R/JPSS All-Hands Call – 7 July 2014.
Update on Delivery System Options for ABI and VIIRS Air Quality Products Ray Hoff.
September 12, 2011 – Conference Call GOES-R Proving Ground All Hands SPoRT Update HWT Spring Program National Centers Activity OCONUS activities PG products.
Total Operational Weather Readiness - Satellites (TOWR-S)
TOTAL OPERATIONAL WEATHER READINESS – SATELLITES (TOWR-S) PROJECT Corresponding author: User Readiness for GOES-R and JPSS is dynamic.
Experiences with Operational Readiness through the TOWR-S On-site Operations Testing Mel Nordquist – WFO EKA Frank Alsheimer – WFO CHS.
GOES-R Proving Ground Product Development at CIRA Project Overview The GOES-R Satellite Proving Ground project engages the National Weather Service in.
1. Outline RAMMB/CIRA Overview RAMMB/CIRA real-time product development & deployment environment GOES-R Proving Ground AWIPS II Overview AWIPS II Configuration.
Guide to Linux Installation and Administration, 2e1 Chapter 3 Installing Linux.
Himawari Overview Mike Johnson & Joe Zajic (NWS/OST)
GOES-R Training Plan PG/User Readiness Meeting OCWWS Training Division NESDIS GOES-R COMET VISIT (CIRA/CIMSS) CIMMS (Liaison) Regions June
F OG AND L OW S TRATUS T RAINING R ESOURCES : B LOGS, V IDEOS AND F ACTS SHEETS ( AND HOW THEY COMPLEMENT EACH OTHER ) Scott Lindstrom University of Wisconsin-Madison.
Transitioning unique NASA data and research technologies to operations Product Training Science Advisory Committee February 28 – March 1, 2012 National.
11 GOES-R Proving Ground CIRA / RAMMB Progress Report 16 April 2010 Proving Ground Product Status –New ORI case –Land Surface Temperature –Cloud Climatology.
Tropical Operations and Configuration Training Courses Update Shannon White, Pablo Santos, David Sharp, Andy Devanas, Matt Moreland.
September 4 -5, 2013Dawn Conway, AMSR-E / AMSR2 TLSCF Lead Software Engineer AMSR-E / AMSR2 Team Leader Science Computing Facility Current Science Software.
The NASA Short-term Prediction Research and Transition (SPoRT) Center GOES-R Proving Ground Update 14 January, 2013 Contributions from: Kevin Fuell, Geoffrey.
GOES-R Proving Ground Storm Prediction Center and Hazardous Weather Testbed Chris Siewert 1,2, Kristin Calhoun 1,3 and Geoffrey Stano OU-CIMMS, 2.
1 CIMSS Participation in the Development of a GOES-R Proving Ground Timothy J. Schmit NOAA/NESDIS/Satellite Applications and Research Advanced Satellite.
Kim J. Runk June 4, 2014 Satellite Proving Ground User Readiness Meeting.
Month day, year Comments from NWSHQ Perspective Need to produce table showing 68 baseline & option products vs products that PG is working on What is link.
Update on 2011 National Hurricane Center Proving Ground Mark DeMaria, NESDIS/STAR PG All Hands Conference Call July 22,
1 GOES-R Proving Ground CIRA / RAMMB Progress Report 10 January 2011 National Center Interactions WFO Interactions ORI Case Study Conferences and Meetings.
Update on Delivery System Options for ABI and VIIRS Air Quality Products Ray Hoff.
RGB Imagery Transition to WFOs for AWIPS I and AWIPS II NOAA Satellite Science Week 4 May, 2012 Kevin Fuell 1, Andrew Molthan 2 Gary Jedlovec 2, Kevin.
The NASA Short-term Prediction Research and Transition (SPoRT) Center GOES-R Proving Ground Update 9 July, 2012 Contributions from: Gary Jedlovec, Kevin.
GOES-R Proving Ground Activities within the Storm Prediction Center and Hazardous Weather Testbed - 1/12/15 PG All-Hands Update William Line University.
TOWR-G Test for Operational Weather Readiness with GOES-R Joe Zajic NWS Office of Science & Technology – Science Plans Branch Integrity Applications Incorporated.
2015 OCONUS Meeting Non Export-Controlled Information Progress in Development and Integration of the Product Generation Capabilities of the GOES-R Ground.
GOES-R Recommendations from past GOES Users’ Conference: Jim Gurka Tim Schmit Tom Renkevens NOAA/ NESDIS Tony Mostek NOAA/ NWS Dick Reynolds Short and.
GOES-R Air Quality Proving Ground H. Zhang 1, R. M. Hoff 1, S. Kondragunta 2, A. Huff 3, M. Green 4, S. A. Christopher 5, B. Pierce.
Satellite Proving Ground for Marine, Precipitation, and Satellite Analysis SATELLITE LIAISON: MICHAEL J. FOLMER, PHD.
The NASA Short-term Prediction Research and Transition (SPoRT) Center GOES-R Proving Ground Update 1 July 2013 Contributions from: Kevin Fuell, Geoffrey.
NCEP Central Operations March, 2015 NAWIPS Migration to AWIPS II Status Updates 2015 Unidata Users Committee.
Bill Campbell, Brian Gockel, and Jim Heil (NOAA/NWS) Marge Ripley and Jean-Jacques Bedet (NOAA/NESDIS/GOES-R) Improved Temporal Resolution GOES-R Sectorized.
Transitioning research data to the operational weather community Overview of GOES-R Proving Ground Activities at the Short-term Prediction Research and.
Current State of GOES-R/JPSS User Readiness and the Operations Proving Ground Chad Gravelle GOES-R/JPSS Proving Ground / User-Readiness Meeting 3 June.
AWIPS Readiness for New Satellite Products Mike Johnson (NWS/OBS) OCONUS Proving Ground 13 May,
NWS Satellite User Readiness - Overview Mike Johnson Proving Ground / User Readiness Conference June 2,
Transitioning unique NASA data and research technologies to operations The NASA Short-term Prediction Research and Transition (SPoRT) Center GOES-R Proving.
GOES-R High Latitude Proving Ground Status November 23, 2010 Reported by Tom Heinrichs UAF-GINA With thanks to colleagues at GINA, CIMSS, STAR, and NWS.
Update on Satellite Proving Ground Activities at the Operations Proving Ground Chad Gravelle GOES-R/JPSS All-Hands Call – 13 July 2015.
GOES-14 1-minute imagery GOES-14 will collect 1-minute imagery May 9-22 Data will be collected at CIRA’s groundstation and converted into NAWIPS and AWIPS-2.
Alaska Region-specific Products: Satellite Data Activities and Impacts to NWS Alaska Operations GOES-R OCONUS Workshop Reported by Tom Heinrichs Dayne.
1 Status of Satellite Training Actions Anthony Mostek Chief, Forecast Decision Training Division (FDTD/OCLO) LeRoy Spayd NOAA/National Weather Service.
GROUND READINESS SO MUCH DATA… SO MANY ENDPOINTS… GRB PDA SBN AWIPS-2 -D2D -NCP N-AWIPS.
1 NWS Expectations Satellite Data CONOPS Mike Johnson.
GOES-R Product Distribution Logistics Before and After Handover Kathryn Miretzky GOES-R User Services Coordinator Product Readiness and Operations (PRO)
Preparing for GOES-R: Post Launch Test Planning Wayne MacKenzie GOES-R Product Area Lead GOES-R Product Readiness and Operations (PRO) Team Deputy GOES-R/JPSS.
JPSS Training Plan BY JOREL TORRES 1, BERNIE CONNELL 1, STEVE MILLER 1, BRIAN MOTTA 2 AND TONY MOSTEK 2 JPSS SATELLITE LIAISON 2016 OCONUS INTERCHANGE.
{ AWC and OCONUS: satellite user readiness in the evolving aviation forecasting mission Amanda Terborg OCONUS 2016 Honolulu, HI.
Sandy Supplemental for Alaska - Update Presented by Tom Heinrichs University of Alaska Fairbanks Geographic Information Network of Alaska.
Satellite Products Dissemination Christine Brunner NOAA/NWS Office of Dissemination May 10, Satellite Proving Ground/User-Readiness Meeting.
Lance VandenBoogart GOES-R PG User Readiness Meeting 6/3/2014 “Tales From The Testbed”: HWT-EWP Highlights.
Guide to Linux Installation and Administration, 2e
NOAA Report on the Status and Future Plans for GEONETCast Americas Presented to CGMS-43 Working Group IV session, agenda item 3.
Overview – SOE PatchTT November 2015.
TOTAL OPERATIONAL WEATHER READINESS – SATELLITES (TOWR-S) PROJECT
Overview – SOE PatchTT December 2013.
RICO Ops Plan – Satellite Section
Satellite Data Resources: Browsing and Accessing Archived Datasets
GOES-R RPM Synthetic Ingest and Display at WFO Medford, OR
Mitel Pricing Tool - MPT Overview of MPT. SX-200 ICP Sales Training2 Mitel Pricing Tool - MPT  The Mitel Pricing Tool (MPT) consolidates various tools.
GNOSIS eLearning Modules How-To Guide
Hyperspectral Wind Retrievals Dave Santek Chris Velden CIMSS Madison, Wisconsin 5th Workshop on Hyperspectral Science 8 June 2005.
Change Management Team
GOES-R Proving Ground Activities at SPoRT
Status of recent/near future VISIT/SHyMet as it relates to the Satellite Foundational Course for GOES-R (SatFC-G) NOAA Satellite Proving Ground / User.
The National Weather Service “Polar Book Club”
Presentation transcript:

TOWR-S Coordination with NWS Operations and Training Eric Guillot, Mike Johnson, & the TOWR-S Team 11 May

What is the GOES-R Simulated Imagery? RaFTR: Resample and Format: Timed Release system creates simulated GOES-R data – All 16 GOES-R channels derived from CIMSS model output Hourly WRF-CHEM over CONUS GFS over rest of world – RaFTR interpolates model output to correct GOES-R imagery cadence Flex Mode: 15 min FD, 5 min CONUS, two 1 min mesoscale areas Scan Mode: 5 min FD & CONUS Data is processed through the GOES-R Ground Segment and sent over the GOES-R East and West SBN channels via the NCF As far as AWIPS-II is concerned, this is the real GOES-R imagery! 2

What are the GOES-R Simulated Products? Simulated GOES-R imagery flows into GOES-R GS Baseline product algorithms process the data: – Simulated imagery – Real-time ancillary data (models, observations, etc.) Baseline products are created in real-time and hosted on the PDA system Baseline products are sent to sites over EXP channel of SBN via NCF and terrestrially via PDA As far as AWIPS-II is concerned, these are the real GOES-R baseline products! 3

User Readiness Partners = WFO/RFC/National Center = Support Site RIW CYS CIRA UCAR MSO ABQ TWC PSR LOX EKA MFR PQR FGF APX CIMSS OAX FWR SPC HWT PAH ARH PRHQ OPG CRHQ AWC CAE CHS MRX RLX HNX OUN WDTD BRO 4 NHC VAAC WPC OPC

Necessary Site Modifications to Receive Imagery & Products 5 Modifications to the AWIPS pqact & ldmd files: – Read the GOES-R East and GOES-R West SBN channels – Read the SBN EXP channel – Read the WMO headers for GOES-R Sectorized Cloud and Moisture Imagery, derived products, and polar products Restart LDM as root Note: pqact.conf file changes are overwritten in each AWIPS build 5

Daily Satellite Scan Strategy Tag-Up 6 – Standing optional meeting daily at 2pm EDT – Opportunity for user community to: Report any dataflow issues at their site Decide to put the “satellite” in E or W position for next day Decide to put the “satellite” in Flex or Continuous Full Disk mode for next day Decide on position of Mesoscale sectors if in Flex mode – Plan for following day will go into effect at 12z that day 6

AWIPS Freeze & TOWRpro RPM Development 7 – AWIPS freeze is imminent AWIPS v is currently final release (~Oct 2016) Satellite AWIPS development will continue beyond freeze date – Non-baseline “localization” changes to continue during freeze via TOWRpro RPM RPM = Red Hat Package Manager A collection of.xml AWIPS configuration files installed at the “site” level GOES-R RPM collection called “goes-r wfo” Polar RPM collection called “polar-wfo” 7

GOES-R TOWRpro RPM 8 – GOES-R TOWRpro RPM has been deployed at nearly all participating sites. It contains: Improved GOES-R CAVE menu GOES-R 11-bit color tables Derived product WMO headers Purge rules to 6 hours Other config files required to receive products – Users can provide feedback to TOWR-S for recommended changes to menu, color tables, etc. – Derived products are becoming available over SBN this month 8

Polar TOWRpro RPM Development 9 – Polar TOWRpro RPM is under development and not yet deployed. It will contain: Polar imagery/products (listed by satellite source) in existing “Satellite” CAVE menu WMO headers for all polar imagery/products – Polar products are becoming available over SBN this month Beginning to flow over EXP SBN channel – First product will be AMSR-2 Sea Surface Wind Speed Eventually these products will be migrated to their operational paths Requires AWIPS v to display them (point-set plugin, netcdfGrid plugin) 9

TOWRpro AWIPS Installation 10 – Performed by site ITO or SOO Detailed directions provided on Vlab Takes ~20-30 minutes for initial install Takes ~5 minutes for install of updated version – Matt Comerford (TOWR-S) wrote TOWRpro RPM & installation instruction (supports every site install) – Installation guide located at: mission-readiness-project/rpm-installation-guide 10

Participants Presenting Today 11 – Following three talks this session are from various TOWR-S participants: Mike Stavish: WFO Medford Chris Gibson / Lance Vandenboogart: SOO / WFO Missoula Paul Iniguez: WFO Phoenix 11

Summary NWS participation with simulated imagery dataflow has been outstanding TOWRpro RPM has become a primary way to advance AWIPS satellite configuration changes GOES-R SCMI will continue to be sent over SBN until real GOES-R data is available after launch Simulated GOES-R derived products and real polar product dataflows are beginning very soon 12