1 City of Portland Bureau of Development Services Staff Presentation to the Design Commission Land Use Review LU 12-144988 DZ Arthouse.

Slides:



Advertisements
Similar presentations
Board of County Commissioners PUBLIC HEARING January 10, 2012.
Advertisements

Community Development Department LUPI PLAZA AUTO SERVICE CENTER Application # SP-WVR
Vineland Commercial Site Address: 7626 N. Vineland Ave. (A.P.N ) 7634 N. Vineland Ave. (A.P.N ) 7630 N. Vineland Ave. (A.P.N )
El Cajon Courtyard Excel Hotel Group July 1, 2014.
Florida Fish & Wildlife Conservation Commission ZOS Location Map Feet.
Planning & Community Development Department 245 South Los Robles Avenue Predevelopment Plan Review City Council December 8, 2014.
Blue Prints.
City of North Richland Hills TOD Code Overview. Comments from November 20 Work Session Need to ensure the preservation of key historic assets in the Smithfield.
January 29, 2008 BCC Called Public Hearing on BZA # SE , 12/6/07 APPLICANT: Ganesh Bansrupan.
PALM COAST COMMERCIAL & INDUSTRIAL CENTER – PHASE Application No. SP-MAJ
A Building Area: (sf) 32,000 sf Cost per Square Foot: $62.50/sf Construction Cost $20,000,000 Date of Substantial Completion: May 2006 Location of.
PROPOSED RESIDENTIAL SCHOOL FOR
City of New Brighton Planning Commission Meeting October 18, 2005 Agenda Item: 6A (Public Hearing) Special Use Permit for Detached Garage Exceeding 624.
Planning & Community Development Department 277 North El Molino Avenue Predevelopment Plan Review City Council Meeting May 5, 2014.
Building Plans.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
Board of County Commissioners PUBLIC HEARING Village Planned Development Code (Horizon West) April 28, 2009 Board of County Commissioners PUBLIC HEARING.
Community Development Department Special Exceptions for: Automotive parts (e.g. accessories and tires) and Automotive, Recreational Vehicle, and Boat Dealers.
Subcommittee on Heights, Massing, and Alternate Standards    Third Report – January 20, 2009 Planning & Zoning Commission.
New Brighton Planning Commission Meeting March 21, 2006 Public Hearing: Special Use Permit (06-004) for a porch addition at th Avenue NW.
22 Elevations Chapter Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Introduction to Elevations Elevation –An.
Competency: Draw exterior elevations
Public Hearing November 27, Case:CDR Project:Hunter’s Creek Planned Development/ Land Use Plan (PD/LUP) - Substantial Change Applicant:David.
Proposed LDC Amendment to Standards for Accessory Uses Planning & Land Development Regulation Board Public Hearing October 21, 2015.
Design Standards in Saint Paul Proposed Design Standards Zoning Amendments December 16, 2009 Department of Safety & Inspections / Department of Planning.
Historic Review Board Continued Public Hearing: DR – th St. October 20, 2015.
1 Item W9a (Ruffalo) Coastal Commission March 7-9, 2012 Hearing.
Lowe’s Site Plan Application No. SP-MAJ Lot 3.
June 5, 2007 BCC Public Hearing on BZA # VA , 4/5/07 Applicant/Appellant: Hazael Munoz.
Historic Review Board Public Hearing: DR – th St. September 15, 2015.
Allen Variance Application No. VR-SBK Application Request  Variance for an oversized detached garage in the Single-Family Residential (SFR-3)
HOLLYWOOD PLAZA PARKING GARAGE BZA #VA APPLICANT: JOSHUA WALLACK APPELLANT: SCOTT A. GLASS HOLLYWOOD PLAZA PARKING GARAGE BZA #VA
1 City of Portland Bureau of Development Services Staff Presentation to the Design Commission Design Advice Request #2 – 2/27/14 EA DAR Goat.
1 City of Portland Bureau of Development Services Staff Presentation to the Design Commission EA DA Front 17.
1 City of Portland Bureau of Development Services Staff Presentation to the Historic Landmarks Commission Type II Appeal of Approval LU HDZ –
Planning & Community Development Department 3202 East Foothill Boulevard (Mixed Use Project – Space Bank) City Council May 16, 2016 Predevelopment Plan.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission LU DZ Glisan Commons May 17, 2012.
Planning & Community Development Department Olivewood Village Project (530, 535 E. Union St., 95, 99, 119 N. Madison Ave. and 585 E. Colorado Blvd.) Predevelopment.
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only 1 PowerPoint Presentation Publisher The Goodheart-Willcox Co., Inc.
1 City of Portland City Council Public Hearing on an Appeal of the Land Use Hearings Officer’s Decision Presentation by BDS Staff: Mark Walhood, City Planner.
Christopher Brown, Planner II December 4th, 2014 Case No. 14ZONE1036 La Grange Road Office Louisville Metro Planning Commission Public Hearing.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission Design Recommendation LU MS Conway’s NW.
Block 37 Zoning & Design Guideline Evaluation May 15, 2014.
1 Gables Gateway. 2 1.Comprehensive Plan Text Amendment 2.Comprehensive Plan Map Amendment 3.Zoning Code Text Amendment 4.Change in Zoning 5.MXD3 Mixed.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission LU DZM The Parker Apartments July 12, 2012.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission EA DA New NE MLK & Multnomah.
Starling of Palm Coast Assisted Living Facility Tier 2 - Technical Site Plan Review PLDRB Hearing on March 16, 2016.
Staff Presentation to the Portland Design Commission June 2, 2016 CITY OF PORTLAND, OREGON 1st Design Review Hearing DZM Block 20 Residential.
1 City of Portland Bureau of Development Services Staff Presentation to the Adjustment Committee Land Use Review LU AD Adjustment.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission Design Review Hearing LU DZM AD – Grant.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission Type III Design Review LU DZ SW Yamhill,
CISD Elementary School No. 5 Elevations Discuss the site plan elevation changes to the new CISD Elementary School located at 2520 and 2530 N. White Chapel.
Planning & Community Development Interim Development Process to Implement the General Plan Land Use Element City Council July 11, 2016.
PUD Mike Awe for Sanctuary Mission. SUBJECT PROPERTY S S S S S S S M M M M C C C C C C C.
1 Villa Laguna MXD3 Site Plan Review. 2 Request: The applicant is requesting site plan review of a proposed mixed-use project pursuant to the recently.
Hillside Development Permit 09-38
253 South Los Robles Avenue Predevelopment Plan Review
CFT Gateway Center ( E. Foothill Blvd
City Council September 18, 2017
Architecture ~ Architectural Plans ~
Drawing & Building Names
Arbors at Bittersweet Woods.
DrawING exterior elevations
Competency: Draw exterior elevations
83 North Lake Avenue Predevelopment Plan Review
995 South Fair Oaks Avenue Predevelopment Plan Review
254 East Union Street Pre Development Plan Review
City Council Meeting April 29, 2019
Keystone Library Deliverables
115-Unit Mixed-Use Project (711 E
Presentation transcript:

1 City of Portland Bureau of Development Services Staff Presentation to the Design Commission Land Use Review LU DZ Arthouse

2 Summary of the Proposal New ¼ block, six-story building with 50 apartments on the six upper floors; Ground floor with four retail spaces, loading and trash/service areas, residential lobby/gallery, decked courtyard with rain garden, tenant library, and bike parking room; Type III Design Review required; No Modifications requested or necessary; and Exception to regarding Window Projections Into Public Right-of-Way

3 Zoning Map CXd, Central City Plan District/River District Subdistrict 6:1 FAR and 100’ height allowed All development standards from Zoning Code appear to be met at this time No on-site short-term bike parking (not enough room in setback from lot line for all), but the project will pay into the bike parking fund as allowed by code ($3,086 for 5 ST spaces)

4

5

6

7

8

9

10

11

12 Site Plan 13’-6” 24’-10”

13 Floors 2-6

14 Roof Plan

15 East Elevation Housekeeping: first floor is bronze metal panel Bronze metal louvers above one retail entry

16 North Elevation Housekeeping: first floor is bronze metal panel Bronze metal louvers above three retail entries

17 West Elevation Housekeeping: Staff Report error in reference to chevron panel at penthouse: it’s flat ribbed metal panel (C5 findings on p. 13, C11 findings on p. 15)

18 South Elevation Housekeeping: Life Safety was consulted 8/16 to verify 6-story construction can work (TBD, but doable as Type III and not Type V construction)

19 Wall Sections at Base

20 Detail at Canopy/Window

21 Detail at Windows/Metal Panel

22 Landscape Plan

23 Window and Door Details

24 Window and Door Details

25 Window and Door Details

26 Window Projections into Right-of-Way Maximum 4’ projection (OK) Minimum 8’ clearance from grade (OK) Minimum 30%, maximum 40% windows (OK) Maximum 40% of any one façade projecting (OK) Minimum 10% side wall windows (N/A) Maximum 12’ width for each element (North Wall 13’-6”, East Wall 24’-10” – requesting Exception to this standard) Minimum 12’ separation from elements (N/A)

27 Staff Recommendation Approval of Design Review for a new six-story mixed-use building per the approved drawings, exterior design, etc. Approval of an Exception to the Oriel Window Standards to increase length of individual projections from 12’ to 24’-10” on east projection, and from 12’ to 13’-6” on north projection. Approvals granted based on approved Exhibits C.1 through C.45 (add new louver drawing), and subject to standard ‘Design as approved, no field changes’ condition.

28 fin