MARCO control system Munich 1.03.2012 Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.

Slides:



Advertisements
Similar presentations
Welcome Herzlich Willkommen Bienvenue JUMO eTRON T data sheet
Advertisements

Variable Frequency Drives Bypass Options
CO2 progress and issues on the control system Lukasz Zwalinski – PH/DT
Graphic Symbol Location 1. DIN Terminal X52 The machine is powered by electricity using copper cable with 5 wires (3 phase wires + neutral wire +
Elec467 Power Machines & Transformers
Introduction To Programmable Logic Controllers
Engineer Training Electrical Cabinet (EC) TJ8300 / TJ8500 Electrical Cabinet (EC)
Microprogrammes control the KOMBIS TMM8003. For the reliable operation of its systems and devices there are several programs located in two controllers.
Engineer Training Electrical System Overview and Requirements.
Lukasz ZwalinskiLHCb CO 2 cooling; 1 IBL CO 2 cooling control system Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Michal Zimny,
MEASUREMENTS and CONTROL LAB
1  Module Type Overview  Construction  Characteristics  Installation principles  Details PD 600-Series.
Module 2: Hardware and Terminology
Electrical Components.  This supplies all the power to the robot. It is a single 12 V battery. They are sealed to prevent battery acid from leaking.
Engineer Training UV Electrical Cabinet (16 and above) TJ8300 / TJ8500 UV Electrical Cabinet (Machines 16 and above)
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
Lukasz ZwalinskiATLAS IBL CO 2 cooling 1 CO 2 cooling system for Insertable B Layer detector into the ATLAS experiment L. Zwalinski, C. Bortolin,
Engineer Training XL1200 Electric. Engineer Training XL1200 Electric Confidential 2 Block Diagram.
TF FLAG JOINT HIGH CURRENT TEST FIXTURE INSTALLATION TO BE IN THE NSTX TRANSITION AREA Features Assembled Components: Flag and Mating Section of TF Center.
CO2 progress and issues on the control system Lukasz Zwalinski – PH/DT
Ethernet IP solution for ATLAS IBL and CMS Pixel detectors CO 2 cooling plants Lukasz Zwalinski PH/DT/DI.
Engineer Training UV Electrical Cabinet (1-15) TJ8300 / TJ8500 UV Electrical Cabinet (Machines 1-15)
Maciej Ostręga Michal Zimny IBL CO 2 cooling progress meeting
MARCO UNICOS based control system CERN Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
Michal Zimny Cracow University of Technology Seminar - Internship programmes at CERN PH-DT-DI.
Chiller control system Lukasz Zwalinski – PH/DT.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
Prepared by: Engr. Qurban Ali Memon 11ES (SEC- 1 & 2)
CO2 progress and issues on the control system Lukasz Zwalinski – PH/DT
New product introduction:
60kW Thermosiphon control system
Thermo-siphon Control Design Lukasz Zwalinski – PH/DT Alexandre Moraux – PH/DT
Chiller + Brine + Water control system UNICOS CPC Lukasz Zwalinski – PH/DT.
PROGRAMMABLE LOGIC CONTROLLER. Control Systems Types  Programmable Logic Controllers  Distributed Control System  PC- Based Controls.
MARCO control system Munich Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
Presentation On Project Work Automatic bottle filling system using PLC
6/27/2007 Quick Reference Parts Guide Introduction This Quick Reference Parts Guide is an easy way to locate part numbers to common replacement parts.
Push Button Station and Relay
Alice TOF Production Readiness Review Gas Control Systems.
Internship final report Joanna Staniszewska Cracow University of Technology –
Lesson 1 PLC BASICS. PLC Definition  Programmable Logic Controllers are industrial computers that control machine and other applications.  PLC have.
A technical proposal for the consolidation of the LHCA cryogenic elec/control system for the HL-LHC era. 07/10/2017 Simon MARTIN Marco PEZZETTI Simon MARTIN.
Quick Reference Parts Guide Introduction
SPD II 1 for LV Power (AC/DC)
PV100&PV200 Solar Pumping VFD
Module 1: Introduction to PLC
MICE RF System Power Supplies, Control and Monitoring Status report
UNICOS: UNified Industrial COntrol System CPC (Continuous Process Control) Basic course SESSION 3: PLC basics UCPC 6 UNICOS-Continuous Process Control.
ABB i-bus® KNX Room Solutions
ProtoDUNE SP – Slow control Status
SCADA for Remote Industrial Plant
Christian Veelken last updated 11/09/06
How SCADA Systems Work?.
IBL CO2 cooling control system development status
PRESENTED BY:AMOD SHAKYA. Power Circuit –connectoin with motor using contactor Control Circuit-using switch make a holding circuit.
MAUVE CO2 cooling review
SC1R Cold Box PDR Controls
Programmable Logic Controllers
Electronic relay ER/U 1.1 contact TU/W 1.1 US/U 4.1 ER/U 1.1
Customer Presentation
Basic circuits Electrical circuits Electrical properties Ohm’s law
CO2 progress and issues on the control systems
Vacuum Control System for Monolith Vacuum
Detailed information FOR INTERNAL USE ONLY! CUBE20.
Presentation transcript:

MARCO control system Munich Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT

Presentation overview Parts delivery status Electrical assembly UNICOS specification PLC Program and PVSS MARCO hardware

Parts delivery status Orders – 100% received Electrical parts list – on 1kW workspace

Electrical assembly Components installed Ready for cabling

UNICOS specification After first generation Latest version – on 1kW workspace

PLC Program and SCADA (PVSS) PLC program – starting (?) Beginning of the creation PVSS panels

MARCO hardware - Control cabinet Front view

MARCO hardware - Control cabinet Bottom view

MARCO hardware - Control cabinet PLC rail

MARCO hardware - PLC Control based on Siemens PLC S7 family 2 - Ethernet connection 32 - Digital Input 32 - Digital Output 34 - Analog Input 20x 4-20mA 14x RTD 8 - Analog Output

MARCO hardware - Control cabinet 400V ! Main switch 230V/6A max Socket Electrical valves rail PLC 4-20mA analog input PLC Digital input PLC RTD analog input PLC Analog output 24V Schrack relays

MARCO hardware - Control cabinet PR-conditionerInput: Thermocouple „K”Thermocouple „K”Output: 4-20mA (to PLC)4-20mA (to PLC) NO relay – cut off heater powerNO relay – cut off heater power Easy to programing via display

MARCO hardware – Security/Protection 3 – Level of protection for Electric Heaters I – PLC software protection II – PR condictioner – software/hardware protection III – Thermal switch – hardware protection

MARCO hardware – Security/Protection 3 – Level of protection for Electric Heaters HEATER 230V Thermocouple STOP! Thermal switch

MARCO hardware – Relays All used relays are CERN standard Schrack 24V coil 3 contact NO/NC max 10A / 230V Easy and fast replacement

MARCO hardware – Control Cabinet High Voltage ! Power distribution High voltage terminals for heaters and pump Relays for high voltage control 24V Power supply

MARCO hardware – Control Cabinet Main contactor – switch power off if emergency the button is pressed Power distribution box (3P + N)

MARCO hardware – Control Cabinet 24V 10A Power Supply 24V 5A Power supply for PLC

MARCO hardware – Security/Protection Differential block and circuit breakers – SIEMENS All of them with feedback to PLC

MARCO hardware – Control Cabinet Pumps and heaters relays Solid State Relays for heater power control Pumps and heaters terminal block

MARCO pictures and 3D model: Kamil Cichy