1 By: Prof. Y. Peter Chiu 9 / 1 / 2012 9 / 1 / 2012 Chapter 2 -A Forecasting.

Slides:



Advertisements
Similar presentations
Forecasting OPS 370.
Advertisements

Operations Management Forecasting Chapter 4
T T18-03 Exponential Smoothing Forecast Purpose Allows the analyst to create and analyze the "Exponential Smoothing Average" forecast. The MAD.
Forecasting 5 June Introduction What: Forecasting Techniques Where: Determine Trends Why: Make better decisions.
Forecasting Ross L. Fink.
Chapter 12 - Forecasting Forecasting is important in the business decision-making process in which a current choice or decision has future implications:
Forecasting.
CHAPTER 3 Forecasting.
Lecture 3 Forecasting CT – Chapter 3.
Chapter 13 Forecasting.
Principles of Supply Chain Management: A Balanced Approach
Operations Management Forecasting Chapter 4
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Operations Management Forecasting Chapter 4.
FORECASTING Operations Management Dr. Ron Lembke.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 3 Forecasting.
Slides 13b: Time-Series Models; Measuring Forecast Error
Chapter 5 DEMAND FORECASTING Prepared by Mark A. Jacobs, PhD
MS Production and Service Systems Operations Forecasting
Chapter 2 Chapter 2 Forecasting McGraw-Hill/Irwin Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
LSS Black Belt Training Forecasting. Forecasting Models Forecasting Techniques Qualitative Models Delphi Method Jury of Executive Opinion Sales Force.
Chapter 4 Forecasting Mike Dohan BUSI Forecasting What is forecasting? Why is it important? In what areas can forecasting be applied?
Sales Management Sales Forecasting Topic 13. Sales Forecasting What is it? Why do it? Qualitative vs Quantitative Goal = Accuracy Commonly Done by Marketing.
The Importance of Forecasting in POM
CHAPTER 3 FORECASTING.
Production and Operation Managements Forecasting Professor JIANG Zhibin Dr. GENG Na Department of Industrial Engineering.
Forecasting OPS 370.
Forecasting.
3-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Operations Management
3-1Forecasting William J. Stevenson Operations Management 8 th edition.
3-1Forecasting. 3-2Forecasting FORECAST:  A statement about the future value of a variable of interest such as demand.  Forecasts affect decisions and.
DSc 3120 Generalized Modeling Techniques with Applications Part II. Forecasting.
Forecasting February 26, Laws of Forecasting Three Laws of Forecasting –Forecasts are always wrong! –Detailed forecasts are worse than aggregate.
Forecasting. 預測 (Forecasting) A Basis of Forecasting In business, forecasts are the basis for budgeting and planning for capacity, sales, production and.
Forecasting Chapter 9. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall Define Forecast.
Maintenance Workload Forecasting
McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. 3 Forecasting.
Business Processes Sales Order Management Aggregate Planning Master Scheduling Production Activity Control Quality Control Distribution Mngt. © 2001 Victor.
Welcome to MM305 Unit 5 Seminar Prof Greg Forecasting.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 3 Forecasting.
15-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Forecasting Chapter 15.
Forecasting.
FORECASTING Kusdhianto Setiawan Gadjah Mada University.
MGS3100_03.ppt/Feb 11, 2016/Page 1 Georgia State University - Confidential MGS 3100 Business Analysis Time Series Forecasting Feb 11, 2016.
DEPARTMENT OF MECHANICAL ENGINEERING VII-SEMESTER PRODUCTION TECHNOLOGY-II 1 CHAPTER NO.4 FORECASTING.
CHAPTER 12 FORECASTING. THE CONCEPTS A prediction of future events used for planning purpose Supply chain success, resources planning, scheduling, capacity.
3-1Forecasting CHAPTER 3 Forecasting McGraw-Hill/Irwin Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill.
Forecasting Chapter 5 OPS 370
3-1Forecasting William J. Stevenson Operations Management 8 th edition.
13 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Forecasting 13 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Forecasting Production and Operations Management 3-1.
Demand Forecasting Production and Operations Management Judit Uzonyi-Kecskés Ph.D. Student Department of Management and Corporate Economics Budapest University.
Demand Forecasting Production and Operations Management Judit Uzonyi-Kecskés Ph.D. Student Department of Management and Corporate Economics Budapest University.
T T18-02 Weighted Moving Average Forecast Purpose Allows the analyst to create and analyze the "Weighted Moving Average" forecast for up to 5.
Demand Forecasting Production and Operations Management Judit Uzonyi-Kecskés Ph.D. Student Department of Management and Corporate Economics Budapest University.
Welcome to MM305 Unit 5 Seminar Dr. Bob Forecasting.
Welcome to MM305 Unit 5 Seminar Forecasting. What is forecasting? An attempt to predict the future using data. Generally an 8-step process 1.Why are you.
Short-Term Forecasting
Forecasting Operations Analysis and Improvement 2017 Spring
Forecasts.
Operations Management Contemporary Concepts and Cases
Mechanical Engineering Haldia Institute of Technology
Demand Forecasting Production and Operations Management
Demand Forecasting Production and Operations Management
Forecasting Chapter 11.
Welcome to MM305 Business Statistics with Quantitative Analysis
Principles of Supply Chain Management: A Balanced Approach
Forecasting Elements of good forecast Accurate Timely Reliable
Forecasting is an Integral Part of Business Planning
Prepared by Lee Revere and John Large
Presentation transcript:

1 By: Prof. Y. Peter Chiu 9 / 1 / / 1 / 2012 Chapter 2 -A Forecasting

2 §. F1: Introduction (1) “ My concern is with the future since I plan to spend the rest of my life there ” Charles F. Kettering (2) Forecasting is the process of predicting the future. (3) All business planning is based to some extent on a forecast

3 (4) Most use of forecasting in 2 functional areas : (a) Marketing (b) Production In some cases the forecasts prepared by marketing may not meet the needs of production. (5) Can all events be accurately forecasted ? ~ NO ~ §. F1: Introduction

4 (7) Demand is likely to be random in most circumstances, Can forecasting methods provide any value ? In most cases, the answer is “YES” (6) In POM, we are primarily interested in forecasting “product demand” §. F1: Introduction

5 (8) Forecast Horizons in Operation Planning :(see Fig.2-1)  Short Term: ~ day-to-day planning or weeks  Intermediate Term: ~ weeks or months  Long Term: ~ months or years, ~ overall firm’s manufacturing strategy ~ capacity needs §. F1: Introduction

6 §. F2: Characteristics of Forecasts (1) They are usually WRONG (2) A good forecast is more than a single number (3) Aggregate forecasts are more accurate

7 (4) The longer the forecast horizon, the less accurate the forecast will be (5) Forecasts should not be used to the exclusion of known information §. F2: Characteristics of Forecasts

8 §. F3: Subjective Forecasting Methods Methods (1) Sales force composites (2) Customer surveys (3) Jury of executive opinion (4) The Delphi method

9 §. F4: Objective Forecasting Methods Time series (1) Time series : only past data, a “naive methods”  In time series analysis we attempt to isolate the patterns that arise most often, including  Trend ~ linear or nonlinear  Seasonality  Cycles ~ varies in length or magnitude  Randomness

10 Fig.2-2 p.60

11 (2) Causal models (2) Causal models : using other related data  is used to predict economic phenomena, e.g. GNP, GDP Causal models : Y= f (X 1, X 2,…, X n ) Phenomenon Variables we believe We wish to forecast to be related to Y Example: Y=α 0 +α 1 x 1 +α 2 x 2 +…+α n x n Econometric models Y ~ linear (X i )

12 §. F4.1: Class Problems Discussion Chapter 2 : ( # 1, 2, 4, 6, 8, 9 ) p Preparation Time : 15 ~ 20 minutes Discussion : 10 ~ 15 minutes Discussion : 10 ~ 15 minutes

13 Notation Conventions : D 1, D 2, …, D t, as the observed values of demand periods 1, 2,…t, ● Time series methods use the past values to predict the future values, for most methods we can write a 0, a 1,…are weights where may be 1, 2, 3,… For one-step-ahead forecasts. i.e. : forecast made in period t for period

14 §. F5: Measures of Forecast Error (1) Mean Absolute Deviation ~ MAD (2) Mean Squared Error ~ MSE (3) Mean Absolute Percentage Error ~ MAPE

15 §. F6: MAD (mean absolute deviation) [ 6.1] e i : errors over n periods. When forecast errors are Normally distributed, as is generally assumed, an estimate of the standard deviation of the forecast error,  e  1.25(MAD) §. F7: MSE (mean squared error) [ 7.1]

16 §. F8: MAPE ( mean absolute percentage error ) [8.1] where for one-step-ahead forecasts

17 Example 2.1 Example 2.1 p.62 Artel, a manufacturer of SRAMs (static random access memories), has production plants in Austin, Texas, and Sacramento, California. The managers of these plants are asked to forecast production yields (measured in percent) one week ahead for their plants. Based on six weekly forecasts, the firm’s management wishes to determine which manager is more successful at predicting his plant’s yields. The results of their predictions and actual yield rates are given in the following table. ◇

18 Example 2.1 / solution ◇

19 §. F 8.1 : Class Problems Discussion Chapter 2 : ( # 12, 13 ) Chapter 2 : ( # 12, 13 ) pp Preparation Time : 25 ~ 35 minutes Discussion : 15 ~ 20 minutes Discussion : 15 ~ 20 minutes

20 §. F9: Forecasting Methods for stationary time series (1) Moving average (1) Moving average of order N F t = (1/N) (D t-1 + D t D t-N ) [ 9.1] (2) Exponential Smoothing F t =  D t-1 + (1 -  ) F t-1 [9.2a] or F t = F t-1 -  ( F t-1 - D t-1 ) [9.2b]

21 Example 2.2 p. 64 QuarterEng.MA(3)MA(6) Failures §. F10: MOVING AVERAGE MA(N) §. F10: MOVING AVERAGE MA(N) : N-Period moving average A B A B ◇

22 (A) one-step-ahead: (B) multiple-step-ahead: (C) [10.1] Example 2.2 / solution ◇

23 Example 10.2: t=4 N=3 ∴ t+1=5 (D) MA lags behind the trend. [See Fig.2-4]

24 Fig.2-4 p.66

25 §. F11: Class Problems Discussion Chapter 2 : ( 16,17,18,19, 21) p.67 Preparation Time : 25 ~ 35 minutes Discussion : 15 ~ 20 minutes Discussion : 15 ~ 20 minutes

26 §. F12: Exponential Smoothing New Forecast =  (current demand) + (1-  ) (last Forecast) F t =  D t-1 + (1-  ) (F t-1 ) [12.1] = F t-1 -  (F t-1 - D t-1 ) = F t-1 -  . e t- 1 [12.2] 0 ≦  ≦ 1 the forecast in any period (t) is the forecast in period (t-1) minus some fraction of the observed forecast error in period (t-1)  

27 [12.3] where a 0 =  ; a 1 =  (1 -  ) ; a 2 =  (1 -  ) 2 ; … ∴ a 0 > a 1 > a 2 > …, a i =  (1-  ) i  §. F12: Exponential Smoothing ∵ F t -1 =  D t-2 + (1-  ) F t-2 F t =  D t-1 + (1-  ) F t-1 =  D t-1 +  (1-  ) D t-2 + (1-  ) 2 F t-2 ∵ F t -2 =  D t-3 + (1-  ) F t-3 F t =  D t-1 +  (1-  ) D t-2 +  (1-  ) 2 D t-3 + (1-  ) 3 F t-3

28 From  F t =  D t-1 + (1 -  ) F t-1 if  is large ~ variation form period to period if  is small ~ more stable In production application, stable forecasts are very desirable normally set  = 0.1 or 0.2 ( p lines ) §. F12: Exponential Smoothing

29 Example 2.3 Example 2.3 p.69 (F 2 ) (F 3 ) (F 4 ) ◇ Using [12.1] ∴ F 2 =  D t-1 + (1-  ) F t-1 = (0.1) (200) + (0.9) (200) =200 F 3 =  D t-1 + (1-  ) F t-1 = (0.1) D 2 + (0.9) F 2 = (0.1) (250) + (0.9) (200) = 205 F 4 = (0.1) D 3 + (0.9) F 3 = (0.1) (175) + (0.9) (205) = 202 The forecast are quite “STABLE”. See Fig.4 * INITIAL Value. Says=240. Then what-? F 2 = 236

30 Fig.2-6 p.70

31 §. F13: MA(3) v.s. ES(0.1) Example 13.1 (A) why N=3 for MA(3) why α=0.1 for ES(0.1) IF NOT N=3 or α≠0.1 … How to compare them? MAD=57.6 MSE= MAD=49.2 MSE=3458.4

32 (B) AVERAGE “AGE” OF DATA [13.1] → to have the same distribution of forecast errors. eg. α=0.1 N=19 α=0.5 N=3

33 §. F14: Moving average v.s. exponential smoothing (1) stationary demand  constant +  (2) a single parameter, i.e. MA ~ N ES~  (3) lag behind a trend (4)  = 2 / (N+1) MA  ES in terms of the same level of accuracy (A) Similarities:

34 (1) ES is a weighted average of all past data; MA ~ only the last N periods of data, outlier is washed out after N periods (advantage) (2) Using MA must save all N past data points; ES ~ needs to save only the last forecast F t-1 & D t-1 (advantage) (B) Difference:

35 §. F15 : Class Problems Discussion Chapter 2 : ( # ) Chapter 2 : ( # 22, 24 ) p ( 2-25 (a)(b) ; 2-27 ) Preparation Time : 20 ~ 25 minutes Discussion : 10 ~ 15 minutes

36 THE END THE END