David Johnson, Todd Johnson, John Sobolewski, Kevin Duel, Peter Prieto, Andrea Saewert 13rd mini-Workshop on Laser Stripping.

Slides:



Advertisements
Similar presentations
ISIS Accelerator Division
Advertisements

C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
Project X Injector Experiment (PXIE) Steve Holmes Fermilab Proton Accelerators for Science and Innovation: Second Annual Meeting Rutherford Appleton Laboratory.
Masahito TOMIZAWA and Satoshi MIHARA Accelerator and proton beam.
Ion Accelerator Complex for MEIC January 28, 2010.
Linac Laser Notcher David Johnson, Todd Johnson, Matt Gardner, Kevin Duel April PMG Meeting April 2, 2015.
SLAC XFEL Short Bunch Measurement and Timing Workshop 1 Current status of the FERMI project (slides provided by Rene Bakker) Photoinjector laser system.
Linac Laser Notcher Status David Johnson Todd Johnson, Vic Scarpine, Andrea Saewert, John Sobolewski PIP Meeting March 6, 2013 Beams Doc 4306.
Laser Notcher Status Dave Johnson, Todd Johnson, John Sobolewski, Kevin Duel, Andrea Saewert September 11,2013.
David Johnson, Todd Johnson, John Sobolewski, Fred Mach, Kevin Duel, Andrea Saewert February 11, 2014 Accelerator Physics and Technology Seminar.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
David Johnson –APC -.  The Proton Improvement Plan is tasked with Booster upgrades which will increase the Booster throughput required for future operation.
Linac Laser Notcher Status David Johnson and Todd Johnson PIP Meeting October 10, 2012 Beams doc 4237.
Laser Notcher Pulse Energy Requirements & Demonstration Experiment David Johnson, Todd Johnson, Vic Scarpine.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Laser Notcher Status Dave Johnson PIP Meeting April 29, 2014.
The ILC Laser-wire system Sudhir Dixit The John Adams Institute University of Oxford.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
PIP Linac Laser Notcher Overview & Plans David Johnson Todd Johnson, Kevin Duel, Fred Mach August 5, 2014 PIP Linac Laser Notcher System Installation Readiness.
KICKER LNF David Alesini LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Laser Notching Demonstration Experiment (Preliminary Results) David Johnson, Todd Johnson, Matt Gardner, Vic Scarpine, Rick Tesarek.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Accelerator and Detector R&D, August Diagnostics Related to the Unwanted Beam Pavel Evtushenko, Jlab FEL.
Simultaneous Delivery of Parallel Proton Beams with the EURISOL Driver
Low Emittance RF Gun Developments for PAL-XFEL
F Project X Overview Dave McGinnis October 12, 2007.
FAST KICKER STATUS Fabio Marcellini On behalf of LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
ATF1/2 laser-wires Stewart T. Boogert on behalf of UK Extraction line laserwire collaboration A. Aryshev, G. Blair, S. Boogert, A. Bosco, L. Corner, L.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
FLASH II. The results from FLASH II tests Sven Ackermann FEL seminar Hamburg, April 23 th, 2013.
Advancement in photo-injector laser: Second Amplifier & Harmonic Generation M. Petrarca CERN M. Martyanov, G. Luchinin, V. Lozhkarev Institute of Applied.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
Fiber Amp 2 MDC Bias Control DA12000 AWG RF Amp Seed Modulator Fiber Pre-Amp Fiber Amp 1 Ext. clock sync to RFQ Pump VDRIVE Fiber Port REA Amp RBA Amp.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
PIP Linac Laser Notcher Overview & Plans David Johnson Todd Johnson, Kevin Duel, Fred Mach August 5, 2014 PIP Linac Laser Notcher System Installation Readiness.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Brian Sheehy Laser and Timing.
Fermilab Proton Driver and Muons David Johnson Fermilab Neutrino Factory Muon Collider Collaboration Meeting March 14, 2006.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
Laser system for ILC diagnostics Sudhir Dixit: The John Adams Institute (Oxford)
Christoph Gabor, ASTeC HIPPI—Meeting (WP 5) 26 th – 28 th September 2007 Non—destructive transverse emittance measurement device The Front End Test Stand.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
David Johnson Jinhao Ruan, Jamie Santucci, Vic Scarpine, Ray Tomlin Presentation to PIP November 16, 2011.
D.E. Johnson, T.R. Johnson, K.L. Duel, M. Gardner, V. Scarpine, R.J. Tesarek Motivation Notching process in the Booster creates about 30-35% of the total.
Laser Notcher Status Dave Johnson PIP Meeting June 26,2012.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
Booster Losses Keith Gollwitzer PIP and MI 700 kW review January 2015.
Electron Sources for ERLs – Requirements and First Ideas Andrew Burrill FLS 2012 “The workshop is intended to discuss technologies appropriate for a next.
The Next Generation Light Source Test Facility at Daresbury Jim Clarke ASTeC, STFC Daresbury Laboratory Ultra Bright Electron Sources Workshop, Daresbury,
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
Awake electron beam requirements ParameterBaseline Phase 2Range to check Beam Energy16 MeV MeV Energy spread (  ) 0.5 %< 0.5 % ? Bunch Length (
J. Corlett. June 16, 2006 A Future Light Source for LBNL Facility Vision and R&D plan John Corlett ALS Scientific Advisory Committee Meeting June 16, 2006.
1 Junji Urakawa (KEK, Japan) at PosiPol2012, Under development of Quantum Beam Technology Program(QBTP) supported by MEXT from to
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
September 12-13, 2013 BNL Laser Profile, Energy and Space Charge Potential Monitor Deepak Raparia September 26, 2013.
F Sergei Nagaitsev (FNAL) Webex meeting Oct ICD-2 chopper requirements and proposal #1.
Recycler Injection with Carbon Foils Dave Johnson, Alexandr Drozhdin, Leonid Vorobiev September 8, 2010 Project X Collaboration Meeting.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
ILC/ATF-2 Laser System Sudhir Dixit (JAI, Oxford)
MIT Compact X-ray Source
Compton effect and ThomX What possible future?
TW FEL “Death-Ray“ Studies
Advanced Research Electron Accelerator Laboratory
Jim Clarke ASTeC Daresbury Laboratory March 2006
LCLS Injector Laser System Paul R. Bolton, SLAC April 24, 2002
小型X線源の性能確認実験計画 高輝度・RF電子銃研究会 広島大学 高エネルギー加速器研究機構 浦川順治
Presentation transcript:

David Johnson, Todd Johnson, John Sobolewski, Kevin Duel, Peter Prieto, Andrea Saewert 13rd mini-Workshop on Laser Stripping

Background Booster utilizes multi-turn injection of H- ions where the Linac pulse length is determined by N*  REV. A “notch” must be created in continuous Booster bunch structure to allow for the rise time of the extraction kicker. Current technique is to use fast kickers in the Booster to remove a section of the Booster beam (50-60 ns out of ~2.2  s) at an energy of 400 to 700 MeV and deposit it in a shielded absorber in the ring. To minimize activation, it is advantageous to create the “notches” in the Booster beam at the lowest energy possible. Even better to create notches outside the Booster tunnel at an energy below to coulomb barrier potential (i.e. 750 keV, the energy of the Linac RFQ) 23rd mini-Workshop on Laser Stripping

Laser Notching Experiment In 2001, Ray Tomlin reported on a successful experiment to create notches in the CW linac beam in the H- 750 keV beam and have this notch survive at Booster injection. He created a 25 ns notch utilizing a 200 mJ 5 ns laser pulse. 33rd mini-Workshop on Laser Stripping

Linac Bunch Structure Choice: laser with 60 ns pulse at 450 kHz with burst at 15Hz or laser with 1.5 ns pulse at MHz for 10 pulses and burst at 450 kHz and 15 Hz 3rd mini-Workshop on Laser Stripping us (~ 11 Booster turns) 2.2 us 67 ms ~22-25 us 5 ns (bunch spacing) ~1-1.5 ns bunch length MHz bunch spacing kHz “notch” spacing (Booster rev. freq.) 15 Hz macro pulse rep rate MACRO MINI (11 turns) MICRO 2.2 us 10-12*5ns = ns

Photoneutralization (1) The fraction of electrons that are detached from the moving H- ions is: The photon flux (generated by the laser) in the lab frame [photons/cm 2 /sec] The photon flux in the lab frame is transformed into the rest frame of moving ion as: The interaction (crossing) time is just the ion path length/ ion velocity The neutralization factor for an ion crossing on axis of the laser beam may be written in terms of lab frame parameters For  ~ 90 o term -> ~  53rd mini-Workshop on Laser Stripping

Photoneutralization (2) Rest frame energy 1.16 eV for 1064 nm laser Cross section 3.66x cm 2 To maximize the neutralization probability->maximize the product fixed 63rd mini-Workshop on Laser Stripping To maximize  increase pulse energy -> minimize  reduce pulse length -> bunch length  reduce laser spot size -> ion size To maximize  for a given H- ion energy  increase horizontal laser beam size or  increase the number of laser interactions with the ion bunch mJ Assume: Laser size 0.6x6mm ~1J

Reduction of Pulse Energy To reduce the required pulse energy we can effectively increase the interaction time by utilizing an optical cavity such that the laser interacts with the ion beam multiple times. 3rd mini-Workshop on Laser Stripping7 H- Linear cavity (zig-zag)  Laser follows ion to interact many times (increase  )  Cavity length proportional to number of interactions  Laser pulse length = notch length  Cavity dimensions determined by ion velocity and bunch spacing  Reduces required laser pulse energy by ~ number of interactions R. Shafer, 1998 BIW 2 mJ for 99.92%

Expected Beam Dimensions Phase space simulation at end of RFQ (figure 4.40 of 750 KeV Upgrade Plan) Trace 3D back calculation of beam size at exit of RFQ based upon emittance measurement at 178 kW power August 9, 2012 CY Tan. Laser beam vertical profile (1/e 2 ) ~ 5 mm. Initial design assumed that the vertical laser beam dimension of 1 cm. Beam measurements indicate vertical laser size could be reduced to 6 mm This is a variable parameter in the beam shaping optics.

Location of Notcher 3rd mini-Workshop on Laser Stripping9 RFQ MEBT

Laser system (1) Laser system is a MOPA design Major components of system CW Seed source (100 mW Lumics) Mach-Zander 10 GHz EOM modulator (Photline) Arbitrary Waveform Generator Two stages of fiber pre-amplifiers (10 nJ/360 nJ) (PriTel) PCF based Fiber Amplifier (10 uJ) (Optical Engines) on order Free Space DPSS amplifier (>2 mJ) (Northrop Grumman CEO) FY14 Beam shaping optics (current R&D effort) Beam delivery (FY14) Vacuum interface and optical cavity (in final design) Laser diagnostics (conceptual design) (FY14) Timing/controls system (conceptual design) (FY14) We have set up the first three components and demonstrated the generation of temporally uniform optical pulses 3rd mini-Workshop on Laser Stripping10 In hand OPG

Burst mode seed pulses to Fiber Amplifier followed by Free Space Amp 1 =1064nm 120 mW CW SW=0.1 nm 10 GHz Mach-Zehnder Modulator Pulse Generator Amplifier, Timing PM Fiber L ins ~5dB L i ~1.8dB 15 Hz Pockels cell Updated 10/3/2012 Generate 24 us burst at 15 hz TRANSPORT BEAM SHAPING OPTICS & OPTICAL CAVITY Fiber Pre-Amp Fiber Amp 1 Fiber Amp 2 Free Space Amp Output modulator/Input fiber pre-amp: MHz pulses (1.25 ns pulse), 458kHz burst Clean up filter Isolator Line filter Free Space Grumman CEO DPSS OEM Diode + TC controlled *Notch 12 bunches -> 60 ns 10 notches/linac pulse Measurement point DEJ PIP Status Report Beams Doc 4306 Not needed with a pulsed Fiber Amp 2 Laser System (2)

OPG test results kHz burst of 201 MHz pulses One set of MHz pulses Individual MHz temporally uniform pulses Pre-distortion of EOM pulses Yellow- AWG Purple- RF Amp out Green – signal form 1.2 GHz (free-space)PD  laser pulses out of fiber pre-amplifier AWG: Chase Scientific DA12000 & CG6000 module

Beam Shaping We would like to demonstrate > 99% neutralization efficiency for all ions in the bunch, therefore we would like all ions to “see” the same photon flux regardless of their transverse amplitude. (i.e roof-top laser profile) The vertical size of the laser beam should be ~> 6  of the ion bunch Squeezing the horizontal laser beam size increases the flux but also reduces the interaction time of the ions passing through (not a big effect due to multiple interactions) also, necessary for optical cavity geometry 3rd mini-Workshop on Laser Stripping13 Todd Johnson

Beam shaping (2) An elliptical laser profile with major/minor axis of roughly 6mm by 1 mm is created from the Gaussian output of the DPSS by a cylindrical matching telescope. (For testing purpose we use 532 nm diode) Currently, this elliptical profile is matched into a refractive optical system (Galilean) which transforms a TEM00 profile into a collimated flattop (top-hat or uniform) profile through phase profile manipulations. The device is called a  Shaper (from AdlOprica GmbH) 3rd mini-Workshop on Laser Stripping14 Input Output

Beam Shaping (3) the layout 3rd mini-Workshop on Laser Stripping15 Input  Shaper Output  Shaper Output Anamorphic prism

Beam Shaping (4) transport Optical cavity ~ 40 cm from optical box Optical path length in cavity ~ 35 cm Clearly have issues propagating roof-top profile We are investigating other techniques to resolve this issue 3rd mini-Workshop on Laser Stripping16 5 cm after the prism 50 cm after the prism Camera scale ~5 x 7 mm (HxV) Todd Johnson

Optical Cavity 3rd mini-Workshop on Laser Stripping17 Attach to RFQ Interface with MEBT Laser IN Laser OUT Mirrors at o wrt H- beam showing 21 interactions John Sobolewski H- 2”

Optical Cavity (2) We printed a 3D model to test design 3rd mini-Workshop on Laser Stripping18 This was very useful as it pointed out several improvements/modifications to the design.

Other Applications Broad band laser chopper (see next slide) Emittance carving Laser-controlled proton beam for medical imaging* (DOE/URA patent (U.S. PATENT NO. 5,760,395) Carol Johnstone Employ a laser to perform selective extraction of a proton beam from a larger, parent H- beam through the photodetachment of the outer electron.  raster the laser across a larger transverse uniform H- beam. Uses: proton radiography, proton cardiography, proton irradiation, and similar medical applications for the diagnosis and treatment of tumors H- beam extraction technique using Nd:YAG laser Proposed for JPARC Experimental Transmutation facility Clean up of bunch longitudinal tails Other ???? 3rd mini-Workshop on Laser Stripping19

Laser Chopper (Example) Could be for macro pulse or bunch-by bunch chopping Project X /PXIE requires a wide band chopper to create a flexible bunch pattern for distribution of beam to rings and experimental areas. 3rd mini-Workshop on Laser Stripping20 Current design of MEBT and choppers

Chopping System Example Estimate laser system required for previous chopping example: Laser wavelength: 1 micron Laser pulse length <~ 1 ns Laser pulse energy: micro-Joules Number of reflections: 200 This is pretty long. Depending on laser design, maybe install multiple sequential systems Zig-zag cavity insertion length: ~ 24 cm Neutralization fraction: 99.96% Average power at MHz (CW): ~40 kW 3rd mini-Workshop on Laser Stripping21

Summary We have proposed to develop a Laser Notching system for the Fermilab Linac-Booster system. This project is funded through the Proton Improvement Plan We have a design for the laser system, beam shaping, and optical cavity that will neutralize > 99% of selected linac bunches. We have the front-end laser system with the final fiber amplifier on order and are in the process of R&D on beam shaping and working on the final design of the optical cavity The current plan is to install the system in Q2 of Fy15 This could be utilized as a demonstration or prototype for laser chopping…. 3rd mini-Workshop on Laser Stripping22