Update on Work Package 12 Beam Transport Modules (LWUs) - UK-A-6 Dr Paul Aden, STFC Daresbury Laboratory ESS Beam Diagnostics Forum, Lund, 11 th February.

Slides:



Advertisements
Similar presentations
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
Advertisements

Rodd Pope, SLAC Undulator System April 16-17, 2007 FAC Meeting 1 Undulator System Assembly, Installation, and Integration.
Superconducting Undulator Workshop Rutherford Appleton Laboratory 28 th & 29 th April 2014 Jim Clarke STFC Daresbury Laboratory.
Cryogenic Technology from STFC Cryox Ltd was formed in 2007 to provide a commercial face for cryogenic technology from the three main.
Marion M. White Undulator System 07 April 2005 LCLSLCLSLCLSLCLS Undulator System Tests Marion M. White ANL-ASD-LCLS.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
Compressor status AWAKE Technical Board meeting 19 May 2015.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
ALIGNMENT DESIGN AND STATUS OF TAIWAN PHOTON SOURCE WEI-YANG LAI October,
CTC, Two-beam module program (WP CTC-004) CLIC Modules (boundary conditions, technical system design and integration) CDR modules Prototypes.
Argonne National Laboratory is managed by The University of Chicago for the U.S. Department of Energy LCLS Girder Support Concept Design Sushil Sharma.
Marion M. White Undulator System 27 October FAC LCLSLCLSLCLSLCLS Progress on the Undulator Module System Test Marion M.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Matthew Cox VSSLS Workshop Barcelona Sept SLIDE 1 1 Diamond Light Source Vacuum Systems Matthew Cox
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
Perspective from STFC as a Funding Agency Charlotte Jamieson Head of Enabling Themes.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
ESS WP 12 Project Management & Capabilities Overview Neil Bliss Projects & Mechanical Engineering Group Leader ESS PDR, Lund, 10 th November 2015.
UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
Update on Work Package 12 Beam Transport Modules (LWUs) - UK-A-6 Dr Paul Aden STFC Daresbury Laboratory ESS TAC, Lund, 15 th October 2015.
C.MADEC - TTC meeting E-XFEL cryomodule assembly : prototyping phase at Saclay.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
ESS DTL: Prototyping M.Comunian - F. Grespan – P. Mereu Lund– 10/04/2013F.Grespan.
Shrikant_Pattalwar ICEC 26, March 7-11, 2016, Delhi 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
Vacuum experiences on XFEL Beam Position Quadrupole Units (BQU) preparation Marco Schalwat TTC Topical Workshop on SRF Cryomodule Clean Room Assembly CEA.
RAMI Paul Aden. RAMI Analysis Reliability Visual inspection during each shutdown Service schedule for necessary components Majority of components to have.
Project Management Paul Aden. UK Time Line Initial discussions in September 2013, IVC in Paris UK IKC Funding announced in 2014 Vacuum Test Facilities.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Developing the Collaboration P McIntosh STFC Daresbury Laboratory.
LWU Design Overview Paul Aden. BTM WP Scope To design, procurement and assemble; –2 Prototypes –3 Test Chambers –75 Linac Warm Units –52 Beam pipe modules.
Beam Transport Modules Preliminary Design Review (WP12) Dr Paul Aden Project Manager ESS PDR, Lund, 10 th November 2015.
Vacuum Processes for Beam Transport Modules (LWU’s) of ESS Keith Middleman STFC Daresbury Laboratory ESS PDR, Lund, 10 th November 2015.
Philippe Goudket ASTeC, STFC Daresbury Laboratory TTC –TOPICAL WORKSHOP SRF CLEANROOM ASSEMBLY.
ELENA installation progress F. Butin / ELENA collaboration.
Cleanrooms Keith Middleman. Particulates and Clean rooms What is a particulate? Small discrete mass of solid or liquid. Human hair is microns in.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
Capabilities and Programmes of STFC’s Accelerator Science & Technology Centre (ASTeC)
WP High Beta Cavities Delivery
Muon Ionisation Cooling Experiment Overview
CBETA Technical Review
Just some of our partners
at STFC Daresbury laboratory
Mark Pendleton – STFC Daresbury Laboratory
Challenges of vacuum chambers with adjustable gap for SC undulators
Mathieu, Gabriel, Max, Spyros, Guillaume
HL-LHC-UK: UK contribution to HL-LHC Crab Cavities and evolution
List of changes and improvements for the next generation CLIC module
EHN1 Neutrino Installation Plans
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
Installation plan for LAB modules
UK RFD Pre-Series cryomodule
WP 3 coordination meeting Saclay May 2008
Undulator System Installation
IMP Cryomodule Assembly and Alignment
XFEL Bunch Compressor BC1 and BC2 Vacuum Issues
Daresbury ESS In-Kind Contributions
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
UK-A-1 ESS RF Distribution System Dr Paul Aden, Dr Rob Edgecock
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
Extraction Michael Bevins May 17, 2007
Fixed Support Design & Testing
Undulator Alignment Plan
General Overview of WP 12 ESS Vacuum System
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

Update on Work Package 12 Beam Transport Modules (LWUs) - UK-A-6 Dr Paul Aden, STFC Daresbury Laboratory ESS Beam Diagnostics Forum, Lund, 11 th February 2016

STFC UK Astronomy Technology Centre Edinburgh, Scotland Polaris House Swindon, Wiltshire Chilbolton Observatory Stockbridge, Hampshire Daresbury Laboratory Sci-Tech Daresbury Warrington, Cheshire Rutherford Appleton Laboratory Harwell Didcot, Oxfordshire Boulby Underground Laboratory North Yorkshire

STFC, Daresbury Laboratory

3 Onsite Accelerators EMMA ALICE VELA

CLARA - under construction

BTM WP Scope To design, procurement and assemble; –2 Prototypes –3 Test Chambers –75 LWUs –52 Beam pipe modules –2 Differential pumping systems –2 mobile installation cleanrooms Particle control only on 52/75 LWUs BPM work package –Only electrical centre measurement –BPMs are to be supplied by DESY

BTM Assembly Schedule BP Assembly Prototypes LWU Assembly Differential Pumping System 2 Installation Cleanrooms Differential Pumping System 1 PDR Nov 15 CDR June 16

Design Progress

Latest Design Work Aluminium slotted girder BPM on entrance or exit Semi–kinematic girder adjustment Pedestal s Quadrupole Magnets Fiducials, laser tracker alignment -50µm Accuracy Built in lifting points ‘Particle Free’ Chamber - ISO 5 or better

Design Based on many years experience developing accelerator modules Slotted girders allows for versatility Optimised for ground vibrations Fiducial mounts for survey and alignment –±50µm alignment to local girder network Girder adjustment ± 25mm Magnet/Chamber adjustment ± 25mm, ± 5mm due to other items Large space between pedestals for access/egress

Space is tight - Elliptical

10mm 8mm 12mm

Example

Space requirements?

Example

Need to know ASAP Dimensions will be fixed in March Dimensions needed by end of March Changes after this point will possibly impact delivery Changes after June WILL impact delivery

Differential Pumping Sections Design work not yet started on HEDP Pumping ratio to be 100:1 (1 x mbar on cryo side) Early concepts;

Mobile Installation Cleanrooms

Design Vacuum Requirements: –1 x mbar –UHV Cleanliness –Particle free to ISO 5 or better Vacuum requirements within STFC Vacuum Specs & inc. –Cleaning –Baking –RGA Scanning –Particle counting STFC Vacuum Specs: ASTEC-VAC-QCD-SPC

Assembly locations & Facilities Engineering technology centre

ETC Build Area Soft wall cleanrooms & Assembly Area

Cleaning vacuum components to UHV standards with aqueous and solvent base systems Pre clean with Auto Wash (industrial dish washer) Solvent cleaning with HFE 72 DE capability 0.3 m cube, 3 m long chambers possible. Vacuum Laboratory A demin water plant > 2 x Auto washers, Alkali degrease bath, Power wash bay. 3 x Solvent cleaning HFE72DE Slurry blaster, Drying cabinet, Cranes.

Vacuum Laboratory 4 x ovens to 250 o C vacuum furnace to 1100 o C Air oven to 150 o C Leak detection & test facilities.

Change area 6m 2 - ISO 7 Outer area 80m 2 - ISO 6 Inner area 12m 2 - ISO 3 (at rest) Cleanrooms

Low particulate experience on ALICE ALICE Cathode in ISO 4 Cleanroom

Temperature Range °C Stability ± 1°C over the full area of the room A fixed 3D survey network Capacity to align 6 BTM modules in the room 4 x Steel Survey Pillars Filled with Sand Daresbury 11 x Floor mounted nests Survey & Alignment Room New Temperature Controlled Survey Alignment Room

On-going Similar builds at Daresbury Extreme Light Infrastructure – Nuclear Physics Facility Delivery to Romania – over 18months period from 04/16 21 Modules 21 Racks ELI - NP

Need to know ASAP Dimensions will be fixed in March Dimensions needed by end of March Changes after this point will possibly impact delivery Changes after June WILL impact delivery

Thank You ESS BI Forum, Dr Paul Aden,

Elliptical LWU

ETC Floor Plan Electrical Lab. Vacuum Laboratory Precision Machining Centre CMM CAM Meeting Room Reception Magnet Test ISO 3,4,5 Cleanrooms Survey & Alignment UHV Cleaning Ovens 23 m 30 m 40 m 15 m 21 m 92 m 30 Tonne Crane coverage Large Systems Assembly Area ISO 4 Soft wall Clean Room

Vacuum Test Facilities Delivered to ESS July 2015

Vacuum Test Facilities Delivered to ESS July 2015

Overview In/Out In –Girder design & procurement –Chamber design (within given parameters) & procurement –Vacuum design & procurement –Survey & Alignment –Particulate Control Out –BPM Procurement & Design –BCM Design –Bolt in diagnostics –Magnet Design & Procurement –Installation & Onsite testing Full excluded / included list in stfc document tdl-1224-meng-spec-0005

Schedule Prototype –FDR 10/11/15 –Build to start 10/2/16 –Delivery July 16 Production Units –PDR 10/11/15 –Beam pipe build to start 8/8/16 –LWU Build to Start 1/2/17