35 Ton Membrane Cryostat Temperature Profiler Proposal Hans Jostlein Fermilab 7/13/2016 35 ton Temperature Profiler Hans Jostlein, Fermilab 1.

Slides:



Advertisements
Similar presentations
Design of the T962 Cryostat L. Bartoszek BARTOSZEK ENGINEERING 5/10/07.
Advertisements

TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
LBNE 35 ton prototype Phase 1 summary Terry Tope Fermi National Accelerator Laboratory All Experimenters’ Meeting – Fermilab – May 19, 2014.
Cooling Channel Count Recap Cooling channel components # Engineering? Absorber: temperature 8*3 yes pressure 2*3 yes He temp 2*3 level 8*3 yes length (optical)
LAr1-ND Conceptual Design Review of Status June 25 Craig Thorn.
Resistive Plate Chambers for CMS (Pre-assembly Jobs done at BARC) Archana Sharma, Suman B.Beri P.U, Chandigarh & L.M.Pant BARC, Mumbai.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Observations on possible factors affecting LAr purity on the 50kton TPC from the viewpoint of the internal walls Alejandro S. Díaz Chemical Engineering.
Majorana collaboration meeting, Seattle, Aug.7 - Aug. 9 Béla MajorovitsGERDA detector mounting 1 GERDA Detector Mounting The Detector Holders Detector.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
ZEPLIN II Status & ZEPLIN IV Muzaffer Atac David Cline Youngho Seo Franco Sergiampietri Hanguo Wang ULCA ZonEd Proportional scintillation in LIquid Noble.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
LQS01 Test Preparation and Test Plan LARP Collaboration Meeting 12 LBNL - April 8-10, 2009.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1.
TPC Design Concept: From MicroBooNE to LAr20
Some naïf ideas on cryostats , BNL-LBNF meeting D.Mladenov, M.Nessi.
Poster Design & Printing by Genigraphics ® Neutrino Interactions Studying the properties of neutrinos will shed light on the origin of the.
11/30/20151Robin Lafever The existing 300 K Flange This is certainly an older version but is useful to illustrate The proposed modifications.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
Long Bo FT and Flanges April 12, 2012 talk Hans Jostlein 12/19/2015Long Bo FT and Flanges1.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
January 5, 2006 at Fermilab1 LAr TPC Wire Experiments B. Hansen.
LAr1 Plans at FNAL Bruce Baller - Fermilab. Outline LAGUNA Meeting - Mar  LBNE LAr detector overview  Prototyping plan  1 kton prototype.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Neutrino Cryogenics Requirements Meeting 25/09/2014 Day 1 review.
February 2010Hans Jostlein1 Cellular Design for a Large Liquid Argon TPC Detector - Design goal -Cellular Design -Additional Possibility: -Light Detection.
Fork and Pallet Design Hans Jostlein March 13, 2007.
Concept Design for LBNF Far detector (LAr single phase)
Installation of the T600 at Fermilab CSN2, September 22,
Ions in LAPD Can we Observe Them in Long Bo ? 3/6/2016 Ions in LAPD Sarah Lockwitz and Hans Jostlein, Fermilab 1 Sarah Lockwitz and Hans Jostlein Fermilab.
Cryogenics Fabrication Plans & Constraints David Montanari (on behalf of the CERN Neutrino Cryogenic Group) ProtoDUNEs Meeting Feb 23, 2016.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
Wire and Cathode Planes - Current Concept (work in progress) PPD Internal Review – 2 nd Part April 19 th, 2005 Rafael Silva FLARE Fermilab Liquid Argon.
35ton and LAPD cryostats and future DUNE detector development.
1 PST Heater Panel Design The PST heater panels are internally redundant resistive circuits printed onto a Kapton sheet with an aluminum backing. They.
35 Ton LAr Impurity Distribution Measurements and CFD simulation Erik Voirin – Fermilab – Thermal and Fluids Engineering Group / Engineering.
Recent Changes to the FD TPC Design Bo Yu Oct. 20, 2015.
1 Cary Kendziora Fermi National Laboratory Cary Kendziora Fermi National Laboratory CEC-ICMC 2013 Anchorage Alaska – June, 2012.
Installation of the T600 at Fermilab Fermilab, February 15,
MicroBooNE High Voltage System and Feedthrough MicroBooNE Collaboration Meeting Hans Jostlein, December 3,
ProtoDUNE Single Phase (NP-04) P&ID David Montanari (on behalf of Mark A, Johan B, Michel C, Joaquim C, Kevin H) CERN Neutrino Platform General Meeting.
SBND Cryostat Requirements David Montanari, Michael Geynisman, Dimitar Mladenov, Joe Howell 14 October 2015.
Plans for this meeting Analysis of DNA setup data + improvements of setup Look into charge readout options of gas detectors (AGET/DREAM chips) Test new.
Installation of the T600 at Fermilab
Ti/SS transitions A.Basti INFN-PISA*
Service channels between Tracker and PP1
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Proximity Cryogenics P&IDs meeting
Instrumentation Used in LAPD and 35T Runs (Dune DocDB 1759)
Services – First Considerations Sigi Wenig / Nicolas Massol ATLAS Tracker Upgrade Workshop Valencia December 2007 Existing services (in cryostat.
Performance of an Automated Water Based Cooling System for CBM MuCh
Summary of activities of the pellet target development
First tests on the roll-formed field cage.
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Warm structure requirements :
First of all we will remind some numbers:
TPC Support and Constraint TPC Support
Test box for ProtoDUNE SP – Integration Test
EILERSEN The Weighing experts.
Wiring the Light and Relay
SNS PPU Cryomodule Instrumentation
Bunker Wall Design Wall ESS
SCITEQ End closure series
SNS PPU Cryomodule Instrumentation
ICARUS Internal Cryogenic Sensors
Presentation transcript:

35 Ton Membrane Cryostat Temperature Profiler Proposal Hans Jostlein Fermilab 7/13/ ton Temperature Profiler Hans Jostlein, Fermilab 1

Phase I Goals 1.Construct a membrane style cryostat – done 2.Install a cryo system 3.Purify the cryostat volume without evacuation 4.Cool the pure Argon gas 5.Fill the cryostat with liquid Argon (Lar) 6.Purify and cool the LAr I will only discuss Item #4 here 7/13/ ton Temperature Profiler Hans Jostlein, Fermilab 2

Cool the Pure Argon Gas Requirements: The gas needs to be cooled quickly while not exceeding the maximum allowed cooling rates for cryostat walls and detector elements Monitoring: We propose here a system to monitor continuously the vetrical temperature profile in two locations. The rate of rise can be examined for each sensor point. Sensors will be located every six inches from top to bottom. 7/13/ ton Temperature Profiler Hans Jostlein, Fermilab 3

Phase I Configuration In Phase I the cryostsat is empty, With no Chambers installed. The proposed system can readily be adapted and used during Phase II, when detectors will be in the cryostat. 7/13/ ton Temperature Profiler Hans Jostlein, Fermilab 4

7/13/ ton Temperature Profiler Hans Jostlein, Fermilab 5

RTD Bars 7/13/ ton Temperature Profiler Hans Jostlein, Fermilab 6

7/13/ ton Temperature Profiler Hans Jostlein, Fermilab 7

Schematic Layout The two vertical black lines are channels holding RTD sensors every six inches. Each channel is connected with a flat Teflon cable to a feedthrough on plate B. An external flat cable takes the connection to an existing Keithly 2700 Scanner/ DVM system (used previously for the sniffer setup) 7/13/ ton Temperature Profiler Hans Jostlein, Fermilab 8

7/13/ ton Temperature Profiler Hans Jostlein, Fermilab 9

Temperature profiler during Phase II The RTD channels hang from the ceiling, a Plate B feature, or an arm attached to the Phase II TPC system. Thus the cooling of detector elements can be studied in great detail. Hans Jostlein Fermilab 7/13/ ton Temperature Profiler Hans Jostlein, Fermilab 10

7/13/ ton Temperature Profiler Hans Jostlein, Fermilab 11

RTD Design The RTD’s are class B3 Platinum coils inside 1/16” diameter x ½” long ceramic shells. They will connect with a 3-wire readout system and would be calibrated to better than 1 K and can be cross-calibrated in situ even better. They will be mounted inside a SS Unistrut channel. Hans Jostlein Fermilab 7/13/ ton Temperature Profiler Hans Jostlein, Fermilab 12

RTD Sensors The sensor will be spring-pressed against the inside wall of the SS channel, to measure the cool-down of such items as TPC frames and cryostat walls. Some of the sensors may be installed behind openings in the channel wall for direct exposure to Argon gas or liquid, to be decided based on group advice 7/13/ ton Temperature Profiler Hans Jostlein, Fermilab 13

RTD Channels The SS channels are simply hung by their top end. This makes it easy to adapt to a variety of locations. The channels are installed during cryostat access. Their Teflon connecting flat cable is threaded though a 1 ½” nozzle ending in a 2 ¾” CF flange after the channels have been mounted. An existing 2x50 pin, D-connector, 6”CF, feed-through is all ceramic and welded, and mounts on the 2/ ¾” flange via an adapter section. 7/13/ ton Temperature Profiler Hans Jostlein, Fermilab 14

Signal Feedthrough An existing 2x50 pin, D-connector, 6”CF, feed-through is all ceramic and welded, and mounts on the 2/ ¾” flange via an adapter section. 7/13/ ton Temperature Profiler Hans Jostlein, Fermilab 15

Data Acquisistion We plan to use the same Keithley 2700 DVM scanner, including two Keithley 7702 scanner cards, that was used for the LAPD sniffer system. If it is to be used again for that purpose, that can be done, since the two measurement periods do not overlap in time. 7/13/ ton Temperature Profiler Hans Jostlein, Fermilab 16

Keithley 2700 scanner / DVM The system is programmed, as before, by an Excel add-in called Excelinx, which is provided by Keithley. The dwell time per scan step is easily programmed. Data are stored in a standard Excel sheet for further processing. We do not plan any direct connection to any other system at this time. 7/13/ ton Temperature Profiler Hans Jostlein, Fermilab 17

Data Appearance Data appears as an Excel sheet, with one column for each sensor. Thus the data can be easily plotted, manipulated, e.g. for calibration, subtraction, or time differentiation. 7/13/ ton Temperature Profiler Hans Jostlein, Fermilab 18

First Guess at Cost Some items we know of, or can guess: 7/13/ ton Temperature Profiler Hans Jostlein, Fermilab 19 ItemNumberUnitCost eachCost total RTD sensors40each$16$640 6" CF flange1each$ /4" CF flange1each$50 Pipe reducer 1 1/2 to 4"1each$150 Welding2hr$70$140 Teflon flat cable50ft$6$ pin submin D, ICD connectors6each$35$210 PVC flat cable40ft$1$40 IDC 50-pin connectors4each$10$40 Unistrut P7000 SS710' lengths$30$210 Lab 8 G10 cutting4hr$70$280 My labor160hrs$50$8,000 (I'll do most of the design and mechanical work, hence no engineering or drafting costs) "Free" effort by my scientific colleagues Total Cost (no contingency)$10,180