The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.

Slides:



Advertisements
Similar presentations
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 6, 2012.
Advertisements

CDF Operations Bob Wagner, ANL May 09, 2005 All Experimenters’ Meeting.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS7: Electronics and Data Acquisition  Overview (this talk): D. Casper  Front-end.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS 7.2 & 7.3: Data Acquisition D. Casper (UC Irvine)
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
1 MICE/AFE II t Update IIT Analog Front End (AFE) Test Stand AFE Conceptual Design Report (CDR) Terry Hart, Illinois Institute of Technology, February.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Nov
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
MICE CM18 June 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM17 o Detector DAQ software o Front End Electronics o Schedule Milestones.
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
Problems with Muon System N. Bondar O.Maev
The Design and Performance of the MINER A Detector Howard Budd, University of Rochester Technology and Instrumentation in Particle Physics 2011.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
MINER A Operations Report All Experimenters’ Meeting Steve Hahn, FNAL July 1, 2013.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
MINERvA Status Report Deborah Harris, Gabe Perdue, Kevin McFarland, Jorge Morfin October 15, 2009.
Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, 2000 Level 2 Calorimeter and Level 2 Isolation Trigger Status Report Monica Tecchio University.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
1 Run IIb Event Builder upgrade Director’s Review Jan Steve TetherRon RechenmacherMarkus KluteBruce Knuteson MITFNAL/CDMITMIT RonSteve Motivation.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
Piquet report (07/Aug/ /Aug/2012) D. Pinci.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jan 25, 2016.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar 30, 2015.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 24, 2014.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
Mitglied der Helmholtz-Gemeinschaft Status of day-one experiment commissioning at COSY Huagen Xu Goa, Mar
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
BRAN at IR2 and IR8: status, commissioning and operation Enrico Bravin AB-BI Joint LHC Machine-Experiments Workshop on Very Forward Detectors 25 January.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 8, 2016.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Dec 9, 2013.
P. Paolucci G. Pugliese M.Tytgat
University of Wisconsin
LKr status R. Fantechi.
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
Injectors BLM system: PS Ring installation at EYETS
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Shift instructions August 16, 2017 Antoni Aduszkiewicz
BPMs in the new Dump Line
DAQ Architecture Design of Daya Bay Reactor Neutrino Experiment
Installation and Run Plan
University of California Los Angeles
B904 Status Report by Fred B.
Trigger issues for the CALICE beam test
19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.
Plans for the 2004 CSC Beam Test
19-April-05 CSC ME1/1 Meeting
Presentation transcript:

The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013

MINERvA Running weekday day shifts for about 5 – 8 hours –All FEB boards (front end boards) operating –Run PEDs and light Injection to determine if there has been any change in the detector. The FEBs & PMTs appear fine. –We are using the shifts to investigate a problem we are having with what appears to be one of the VME modules. Described on the next page –We are also using these shifts and the above problem to train 2 new experts to address DAQ problems should they arise. They are not DAQ experts (don’t write code) but will be able to get the DAQ running should the shifter have a problem. 2

Intermittent DAQ problems The DAQ stops running PEDs after ~ 4 hour –Software reset fixes the problem We can still run shifts with this problem The error comes from reading out a CROC module (Chain ReadOut Controller), We have narrowed the problem down to CRIM 1 of the 2 CRIM modules in 2d crate. –The CRIMs send the timing signals to the CROCs –The output of the CRIM 1 seems to cause the problem. –R eplacing the CRIM or changing the inputs to the CRIM does not seem to help. 3

Intermittent DAQ Problems The problem does not seem to occur with light injection runs –This has given us a clue as to the origin of the problem and a possible fix. 4

CROC-E Upgrade DAQ Test Stand DAQ upgrade needed for us to take data with MI Cycle Rate of 0.75 Hz, The CROC-E upgrade. New CROC-E boards have been assembled and tested by the 14 th floor, ready to be installed. –Thanks to Boris Baldin & Cristian Gingu New DAQ program has been tested with help from the Fermilab online group. 5

DAQ Test Stand New MINERvA test stand is being assembled at D0 by Geoff Savage. This stand will have a large number of FEBs, ~ 60, to test the CROC-Es. –The MINERvA hardware is assembled –Setting up the DAQ computers is next –SLF6 will run with the MINERvA DAQ 6

New DAQ Computer We will be replacing the 3 DAQ computers with 4 DAQ computers. –Of the 3 existing DAQ computer, 2 readout the data and 1 is an event builder. The plan - 1 new computer can take over the task of the 3 existing computers –One new computer reads out both VME crates and is also the event builder. –Gives the DAQ online system redundancy The MINERvA test stand will also verify the software of the computers and ensure they can readout the hardware. The DAQ computer change over will take about 3-4 days. 7

Muon Monitor 4 (MM 4) We are working on installation of the new Muon Monitor (MM) in the 4 th alcove MM 4 will look at the high energy tail of the ME beam The chamber was built at Univ of Texas, Austin The chamber was installed in May. 8

MM4 We are working on finishing the installation including installing the gas system and the electronics. –Linda Bagby ( PPD EE ) is in charge of the installation. –Mike Andrews and AD are helping. –Rochester Tech Dan Ruggiero is working on the installation –We have a MINERvA student working on the installation 9

MM 4 We are waiting on the gas monitor hardware –Gas monitor hardware exists outside the alcove. –The gas lines to the MM 4 have been run MM 1,2,3 had some electronics noise & in the installation of MM 4 we are addressing issues that we think caused noise with MM 1,2,3. –These are mostly issues associated with ground loops. 10

MM 4 The electronics rack is assembled and is ready to be brought into the tunnel – Read out with new SWIC scanner electronics, which has the same front end as the old scanner. –The readout cables that run from MM 4 to the electronics should be ready soon. –AC power has been run We think we can get all work that is needed to be done in the alcove before the beam starts. – Running and cabling the readout and HV cables. The alcove gets interlocked We will finish the work outside the alcove after beam starts. 11