ECAL electronics schedule JFMAMJJASONDJFMAM Prototype 2 boards Design Layout Fabrication and assembly Testing, including VFE prototype tests Production.

Slides:



Advertisements
Similar presentations
6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
Advertisements

ESODAC Study for a new ESO Detector Array Controller.
28 February 2003Paul Dauncey - HCAL Readout1 HCAL Readout and DAQ using the ECAL Readout Boards Paul Dauncey Imperial College London, UK.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
Calice ECAL Readout Hardware Status report Adam Baird ECAL Meeting 26 Sept 2003 LLR-Ecole Polytechnique.
Uli Schäfer 1 JEM Test Strategies Current plan: no JTAG tests at R&S  initial tests done at MZ Power-up / currents Connectivity tests (JTAG) per (daughter)
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
LCWS Apr 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For the CALICE-UK electronics group: A. Baird, D. Bowerman,
29 January 2004Paul Dauncey - CALICE DAQ1 UK ECAL Hardware Status David Ward (for Paul Dauncey)
10 th November 2004Daniel Bowerman1 Dan Bowerman Imperial College Calice Meeting - UCL 10 th November 2004 Electronics Status For the Imperial, Manchester,
2 April 2003Paul Dauncey - CALICE DAQ1 First Ideas For CALICE Beam Test DAQ Paul Dauncey Imperial College London, UK for IC, Manchester, RAL, UCL.
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
TID and TS J. William Gu Data Acquisition 1.Trigger distribution scheme 2.TID development 3.TID in test setup 4.TS development.
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
21 January 2003Paul Dauncey - UK Electronics1 UK Electronics Status and Issues Paul Dauncey Imperial College London.
F.F. - 18/07/ User Guide of the Input Trigger Multiplexer unit with input signal rate counters.
AIDA FEE64 development report August 2010 Progress after Texas CAD work Manufacturing 25th August
June 3, 2005H Themann SUSB Physics & Astronomy 1 Phenix Silicon Pixel FEM S. Abeytunge C. Pancake E. Shafto H. Themann.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
11 October 2002Matthew Warren - Trigger Board CDR1 Trigger Board CDR Matthew Warren University College London 11 October 2002.
ECFA Sep 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
Bernardo Mota (CERN PH/ED) 17/05/04ALICE TPC Meeting Progress on the RCU Prototyping Bernardo Mota CERN PH/ED Overview Architecture Trigger and Clock Distribution.
8/9/2000T.Matsumoto RICH Front End RICH FEE Overview PMT to FEE signal connection Trigger Tile Summation of Current RICH LVL-1 Trigger Module1,2 What is.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixtures FEE64 commissioning A few of the remaining tasks 16th July 2009.
FED Overview VME-FPGA TTCrx BE-FPGA Event Builder Buffers FPGA Configuration Compact Flash Power DC-DC DAQ Interface 12 Front-End Modules x 8 Double-sided.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
Final FED 1 Testing Set Up Testing idea and current status Preliminary results Future development Summary M. Noy
1 October 2003Paul Dauncey1 Mechanics components will be complete by end of year To assemble ECAL, they need the VFE boards VFE boards require VFE chips.
CSC Muon Sorter M. Matveev Rice University January 7, 2003.
LCWS Apr 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For CALICE-UK electronics group: A. Baird, D. Bowerman, P. Dauncey,
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
26/11/02CROP meeting-Nicolas Dumont Dayot 1 CROP (Crate Read Out Processor)  Specifications.  Topology.  Error detection-correction.  Treatment (ECAL/HCAL.
FEE Electronics progress Mezzanine layout progress FEE64 progress FEE64 initial testing Test mezzanine. A few of the remaining tasks 2nd October 2009.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory30 July 2001 CMS Tracker FED CMS Tracker System.
4 November 2002Paul Dauncey - Electronics1 UK Electronics Status Paul Dauncey Imperial College London.
ATLAS SCT/Pixel TIM FDR/PRR28 June 2004 TIM Requirements - John Lane1 ATLAS SCT/Pixel TIM FDR/PRR 28 June 2004 Physics & Astronomy HEP Electronics John.
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixture for software 9th June 2009.
X SuperB Workshop - SLAC Oct 06 to Oct 09, 2009 A.Cotta Ramusino, INFN Ferrara 1 SuperB IFR: outline of the IFR prototype electronics A.C.R
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
Analog Trigger for CTA MST CTA MST Trigger & Integration Meeting Berlin, 7 November 2011 Luis A. Tejedor on behalf of GAE-UCM, IFAE & CIEMAT groups 1.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Dariusz Makowski, Technical University of Łódź, DMCS ATCA LLRF project review, DESY, 3-4.
CALICE Readout Board Front End FPGA
Initial check-out of Pulsar prototypes
14-BIT Custom ADC Board Rev. B
Iwaki System Readout Board User’s Guide
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
CDR Project Summary and Issues
Fernando J. Barbosa F1TDC Status Update Hall D Collaboration Meeting Indiana University – Bloomington, IN May 20-22, 2004 Fernando J.
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
PRODUCTION BOARDS TESTING
UK ECAL Hardware Status
ECAL electronics schedule
CALICE Readout Front End FPGA Development
CMX Status and News - post PRR -
UK CMS Oversight Committee Mtg
PRODUCTION BOARDS TESTING
FEE Electronics progress
BUCKEYE has internal shift register which controls calibration
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
Presentation transcript:

ECAL electronics schedule JFMAMJJASONDJFMAM Prototype 2 boards Design Layout Fabrication and assembly Testing, including VFE prototype tests Production 9 boards Redesign Layout Fabrication and assembly Testing

ECAL prototype detailed schedule Week VME testsImperial Readout board VME definition Manchester Readout board J0/J2 pin definition RAL/UCL Crate check and backplane wireup RAL JTAG testsRAL Readout board VME tests RAL Readout board VME tests Imperial VFE prototype testsParis Aug Sep Oct Nov

Prototype readout board s/w tests Read/write all registers (and 8MByte memory?) Check trigger and clock inputs from J0 Run FE trigger sequence; observe signals on FPGA legs and outputs on front panel Check configurable parameters change timing sequence Capture data and read out; measure pedestals and noise Measure ADC dynamic range and response to sin wave Ramp DAC and measure response vs. DAC setting Read out in all three modes; unbuffered, semi-buffered and fully buffered. Connect to VFE PCBs and check functionality of system Qu: when do we need front panel cable(s)? How many?

Prototype trigger tests Read/write all registers Check trigger inputs/outputs on J0 and J2 Playback trigger sequences through logic Check configurable parameters change trigger logic Read out trigger data Input external trigger signals and check logic Measure trigger latency and jitter Connect to NIM/LVDS module and check functionality Qu: when do we need NIM/LVDS module and backplane cable?