HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.

Slides:



Advertisements
Similar presentations
MuTr Shielding & Grounding Preliminary 10/6/99 (G. Hart) Additions 1/4/01 (REM)
Advertisements

1 Designing for DVI General Applications Considerations.
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
HCAL RBX PRR Overview Jim Freeman RBX PRR March 1-2, 2001.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
HCAL-Fermilab7 Feb 2003Hazen / Machado HF Electronics PMT Readout Update E. Hazen, J. Rohlf, E. Machado Boston University.
Ionization Profile Monitor Front End (IFE) System Presenter: Kwame Bowie PPD/EED Phone: (630)
HF Video MeetingDec 2002E. Hazen HF Electronics PMT Readout Update E. Hazen, J. Rohlf, E. Machado Boston University.
E. Hazen, Boston University BU Meeting, Apr. 6, 2001 Front-end Readout of the CMS Hadronic Forward Calorimeter (HF) Conceptual Design (Summary) by Eric.
INJECTORS BLM BI-TB on Proton Injector start-up. Summary of actions 2 BLM SystemComments LINAC2 8 movable detectors.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Marc Baarmand Total of 8 Calibration Boxes (CBOX) for HF  CBOX contains Small blue scintillator (UV → blue) 1×9 Splitter (each CBOX serves 9 PMT RO Boxes)
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
HF Cabling Upgrade Options T. Shaw 30-OCT HF 2012 Upgrade Meeting 30-OCT-10 T. Shaw.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
1 Prototype Calibration System for Forward Hadron Calorimeter L. Almeida, M. Baarmand, L. Caraway, M. Hohlmann, T. Qureshi, I. Vodopianov FLORIDA TECH.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
BKLM RPC Signal & Ground Schematic Gerard Visser, Indiana University (for the barrel KLM team) 10th B2GM, 11/2011 magnet structure GND 7mm FOAM 3mm GLASS.
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
1/12/2010 R. CIARANFI 1 NEW NINO BOARD FOR RICH OLD AND NEW LOGISTIC NEW BOARD DESCRIPTION NEW MODULARITY 32 CH NEW FORM FACTOR FRONT END AREA AND DAQ.
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
Specifications Asic description Constraints Interface with PDM board Schedule Summary.
C. Lu, K.T. McDonald RPC Connections October 27, RPC Module Signal and HV Connections (October 27, 2008) Changguo Lu, Kirk T. McDonald Princeton.
CSC ME1/1 Patch Panel Interconnect Board (PPIB) Mikhail Matveev Rice University February 27, 2013.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
Current Knowledge on CKM Front-end Electronics M. Bowden, K. Bowie, M. Campbell, P. Cooper, S. Hansen, B. Haynes, A.Inyakin, M. Kozlovsky, K. Nelson,
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
1 H C A L HF Cable Plant Options HF Cable Plant Options December 22, 2010 T. Shaw.
1 (Gerard Visser – STAR Integration Meeting 5/16/2008) STAR Forward GEM Tracker Readout/DAQ Integration G. Visser Indiana University Cyclotron Facility.
CDMS II Shielding To Installation To Construction From Design.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
ESR December, H C A L HCAL Front-end Electronics ESR HCAL Front-end Electronics Report December, 2002 Theresa Shaw.
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
Specifications Asic description Constraints Interface with PDM board Planning Summary.
Belle-II bKLM RPC Readout Power & Ground Discussion 12 th Belle II General Meeting Gerard Visser Indiana University CEEM 7/24/2012.
HCAL Fall meeting, Nov 11-13,`04 HCAL digital optic link and trigger mapping Ianos Schmidt The university of Iowa.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
Update on Electronics Activities
HF “Slice test box” installation
LKr status R. Fantechi.
Calorimeter Mu2e Development electronics Front-end Review
HF Test station at P5 A.Mestvirishvili.
HF “Slice test box” fabrication and installation
T1 Electronic status Conclusions Electronics Cards:
Meeting on Services and Power Supplies
Mini-drawers, FE-ASIC , Integrator
ROBOX modification plans
Front-end electronic system for large area photomultipliers readout
Conceptual design of TOF and beam test results
Pierluigi Paolucci - I.N.F.N. Naples
Overview of T1 detector T1 is composed by 2 arms
BESIII EMC electronics
Development of hybrid photomultiplier for Hyper-Kamiokande
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
RPC Electronics Overall system diagram Current status At detector
TOF & BB FEE Safety Review
Presentation transcript:

HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards and Crates ● System Performance – Noise Levels, 1pe signal, crosstalk – Tests remaining – Grounding optimization – EMC ● Current Status, Production Plans

HF ROBOX PRR3 Apr 2003E. Hazen HF Electronics Overview HF Readout Boxes 24 PMTs each Cable Route ~5m through shielding Electronics Housed in standard racks (3U card cages)

HF ROBOX PRR3 Apr 2003E. Hazen PMT to QIE connection PMT Anode 50Ω coax Coax shield ground at each PMT base Overall shield connected to QIE ground Separate Ground for each PMT QIE Signal Input QIE Reference Input PMT Box Two pairs per PMT channel Multi-pin shielded (MDR-36) connectors Skew-Clear ~50  single-ended to ground Patch Panel

HF ROBOX PRR3 Apr 2003E. Hazen PMT Base PCB Base Supports 8 PMTs with HV distribution Rear detail showing dual coax (signal plus reference) for each PMT

HF ROBOX PRR3 Apr 2003E. Hazen ROBOX Patch Panel MDR-36 Signal Connectors HV Connector Calibration Fiber Connector N2 Gas Connector Rear view (area to be potted)

HF ROBOX PRR3 Apr 2003E. Hazen MDR Connector SignalRef Signal ReturnRef Return Shield 12-pair Skew-Clear cable handles 6 QIE channels Each channel has: Pair 1: Signal, Signal Return, Shield Pair 2: Reference, Reference Return, Shield Overall Shield connected to metal connector backshell

HF ROBOX PRR3 Apr 2003E. Hazen HF PMT Signal Path Octal PMT Boards 16 (short) coax 12-pair Skew-Clear Readout Crate Patch Panel ROBOX (24 PMTs) 6-Channel QIE Boards Fiber to Readout

HF ROBOX PRR3 Apr 2003E. Hazen PMT Base PCB K Dy1 Dy2 Dy7 Dy8 V1 V2 GND V3 Filter/Divider for 8 PMTs K Dy1 Dy2 Dy7 Dy8 Last 2 dynodes individually powered R/C Filter per PMT Main GNDPMT GND (Individual)

HF ROBOX PRR3 Apr 2003E. Hazen Amphenol Skew-Clear TM Cable ● High-performance, compact ● Available in zero-halogen version (ATLAS, CMS) ● Terminates to convenient Mini-D connectors with overall metal shell

HF ROBOX PRR3 Apr 2003E. Hazen Skew-Clear Cable Drawing Will supply zero-halogen version on request

HF ROBOX PRR3 Apr 2003E. Hazen Front-End Board Input from 6 PMTs Honeywell VCSELs QIE DigitizersChannel Control ASICs CERN GOL (Gigabit Optical Link) Transmitters

HF ROBOX PRR3 Apr 2003E. Hazen HF QIE Crate Layout QIE Board 6 Channels 4 Boards= 1 ROBOX Clock and Control Module (3 boards; 4 slots) Standard 3U subrack (custom backplane) Calibration Module (5 slots) Total Power ~85W per crate

HF ROBOX PRR3 Apr 2003E. Hazen Grounding – Overview HV PS Safety GND Detector Frame Safety GND FE Electronics Diff Amp PMT Ground must float (but is cap-coupled to detector) HV Ground must float (Series R at ROBOX) QIE ground = local PMT ground QIE differential input (reference) returned to PMT to cancel CM signal

HF ROBOX PRR3 Apr 2003E. Hazen Grounding... some details How to interconnect PMT grounds, ROBOX case, and PMT shields for minimum noise? Under study...

HF ROBOX PRR3 Apr 2003E. Hazen Some Test Results ● Test setup: – Robox with prototype patch panel – Skew-clear cable with MDR-36 connectors – “Production prototype” QIE boards ● Results Presented – Scope trace of pulses showing speed – Noise measurement (pedestal) – 1pe peak (LED pulser attenuated to << 1pe level)

HF ROBOX PRR3 Apr 2003E. Hazen Average, Typical LED Pulses

HF ROBOX PRR3 Apr 2003E. Hazen PMT Gain vs HV 3 planned voltages corresponding to different eta regions 1700V: 5E5 (81 fC) 1400V: 2E5 (32 fC) 1100V: 5E4 (8.1 fC)

HF ROBOX PRR3 Apr 2003E. Hazen System Noise Performance (1pe Levels 1100V: 8.1 fC 1300V: 32 fC 1500V: 81 fC) Rms= 2.3 fC 2.1 fC 2.2 fC2.7 fC2.1 fC

HF ROBOX PRR3 Apr 2003E. Hazen 1500 V 1pe measurement

HF ROBOX PRR3 Apr 2003E. Hazen 1pe peak vs HV 1100 V1200 V1100 V 1500 V1600 V 1700 V 1300 V1400 V

HF ROBOX PRR3 Apr 2003E. Hazen Status and Plans ● All components have been prototyped ● Lab testing of full system underway ● ROBOX performance meets requirements but beam test is required to confirm total system performance. ● Production of electronics chain outside ROBOX will begin after testbeam experience.