Presented to: REDAC By: Navneet Garg, Ph.D. Date: March 15, 2016 Date: March 15, 2016 Federal Aviation Administration Full-Scale Testing – Perpetual Pavement.

Slides:



Advertisements
Similar presentations
Oklahoma DOT Perpetual Pavement Test Sections at the NCAT Test Track
Advertisements

Presented to: 2012 FAA Airport Pavement Working Group Meeting By: Al Larkin, FAA Airport Technology R & D and Josh Davis, SRA Date: April 25, 2012 Federal.
Construction and Testing of Construction Cycle 2 (CC2) Overlay Murphy Flynn FAA Airport Technology R&D Branch, AAR-410 William J. Hughes Technical Center,
FAA Airport Pavement Working Group Meeting, April Concrete Overlay Research Shelley Stoffels, D.E., P.E. Lin Yeh, PhD FAA Airport Pavement Working.
Presented to: 2012 FAA Airport Pavement Working Group Meeting By: Al Larkin, Airport Technology, R & D Date: April 25, 2012 Federal Aviation Administration.
Design and Construction Guidelines for Thermally Insulated Concrete Pavements Lev Khazanovich, UM John Harvey, UCD Joe Mahoney, UW September 12, 2007.
1 Preserving Municipality Roadways Federal = 3% State = 20% Local = 77% 94% of paved roads have an Asphalt surface FHWA Source: Stephen R. Mueller,
O’Hare Modernization Project Reflective Cracking and Improved Performance of Grooved Asphalt July 20 th, 2006 Research Overview Hyunwook Kim, Research.
Binder Characterizations for High Tire Pressure Project 04/26/2012 Injun Song Injun Song, Ph.D., P. E. SRA International, Inc. Federal Aviation Administration.
Michigan Department of Transportation Perpetual Pavement Rep. Rick Olson’s 2012 Best Practices Conference on Road and Bridge Maintenance Curtis Bleech.
Perpetual Pavements Concept and History Iowa Open House
Full-Depth Reclamation Using a Cement Slurry Spreader Attached to a Ready Mixed Concrete Truck W. Spencer Guthrie, Ph.D., Associate Professor Charles A.
Pavement Design CE 453 Lecture 28.
Presented to: FAA Airport Pavement Working Group By: Murphy Flynn Date: April 24, 2012 Federal Aviation Administration Construction Update.
Tranlation: EASL’s Average Daily Traffic Time or Traffic Pavement Condition Index Pavement Performance Pavement Condition High Performance Intersections.
Guide for Mechanistic-Empirical Design of New and Rehabilitation Pavement Structures By Matt Mason.
1 PAVEMENT DATA ITEMS. 2 Climate_Shapes (4 LTPP zones) Soil_Shapes Metadata Estimates Section level data HPMS Pavement Data Summary level data.
In Tai Kim & Erol Tutumluer University of Illinois, Urbana-Champaign
Pavement Analysis and Design
PERMANENT DEFORMATION BEHAVIOR OF THE GRANULAR LAYERS TESTED AT THE FAA’s NATIONAL AIRPORT PAVEMENT TEST FACILITY NAVNEET GARG, Ph.D. Senior Research Engineer,
Full-scale Reflective Cracking Test Update Presented to: FAA Airport Pavement Working Group Meeting By: Hao Yin, Ph.D., P.E. Gemini Technologies, Inc.
PRACTICAL AIRPORT PAVEMENT M&R MANAGEMENT Y. Hachiya & M. Kanno Service Center of Port Engineering Tokyo, JAPAN 1 FAA Airport Pavement Working Group Meeting.
Evaluation of Subbase Compaction Characteristics Craig Kumpel Andrew Melici Stephen Rossi Colin Yurick Dr. Beena Sukumaran FAA Working Group Meetings,
Presented at: FAA Working Group Meeting Atlantic City, NJ By: Navneet Garg Date:April 24, 2012 Federal Aviation Administration High Temperature Pavement.
Interim Guidelines: The Design and Use of Foamed Bitumen Treated Bases Fenella Long Road Pavements Forum November 2001.
Presented to: 32 nd Annual Airport Conference – Hershey, PA By: Jeff Gagnon, P.E. Manager AJP-6312 Date: March 4, 2009 Federal Aviation Administration.
Perpetual Pavement Design Perpetual Pavement Open House Ashton, Iowa October 5, 2005.
TenCate TM Mirafi ® Geosynthetics Bruce A Lacina, P.E. Roadway Reinforcement Technical Manager.
PAVEMENT MAINTENANCE 1:
Research Findings from the NCAT Test Track APAI Winter Conference Indianapolis, December 14, 2010.
February 1, Analysis of Test Slab Failure Data David R. Brill FAA Airport Technology R&D Branch, AAR-410 William J. Hughes Technical Center, Atlantic.
Presented to: By: Date: Federal Aviation Administration National Airport Pavement Test Facility Update Airport Pavement Working Group Don Barbagallo April.
Perpetual Pavement Design John D’Angelo Federal Highway Administration Washington, DC Canadian User Producer Group for Asphalt Saskatoon, Saskatchewan.
APPLICATIONS OF ENERGY CONCEPTS FOR FATIGUE ANALYSIS OF AIRPORT PAVEMENTS FAA Fatigue Project Briefing October 7th, 2004 Urbana, IL Samuel H. Carpenter,
Status of the first experiment at the PaveLab Fabricio Leiva-Villacorta, PhD Jose Aguiar-Moya, PhD Luis Loria-Salazar, PhD August 31 st, 2015.
Evaluation of Subbase using the Superpave Gyratory Compactor
Laval University’s experience with the wide-base single tires
3/26/08 Field Testing and Modelling of the Italian Smart Runway Instrumentations Silvia Portas Imad L. Al-Qadi Mauro Coni Hao Wang Jongeun Baek Italian.
HIGH TIRE PRESSURE AND TEMPERATURE EFFECTS ON HOT MIX ASPHALT CONCRETE PERMANENT DEFORMATION USING CUSTOMIZED ASPHALT PAVEMENT ANALYZER April 22, 2010.
Presented to: 2010 FAA Worldwide Airport Technology Transfer Conference By: Gordon Hayhoe, FAA AJP-6312, WJHTC Date: April 20, 2010 Federal Aviation Administration.
DISSIPATED ENERGY STUDY OF FATIGUE IN AIRPORT PAVEMENTS PHD Candidate: Shihui Shen Advisor: Prof. S. H. Carpenter FAA Project Review Nov. 9, 2005.
AAR-410 February 2, Alpha Factor Determination for 6-Wheel Gears u Gordon Hayhoe, AAR-410, FAA William J. Hughes Technical Center, Atlantic City,
Presented to: FAA Airport Pavement Working Group Meeting By: David R. Brill, P.E., Ph.D. Date: April 24, 2012 Federal Aviation Administration Update on.
Presented to: 2010 FAA Worldwide Technology Transfer Conference By: James Zargan and Al Larkin Date: April 2010 Federal Aviation Administration FAA Pavement.
Presented to: By: Date: Federal Aviation Administration RPD 151 (RPA S5.1) Evaluation of In-Pavement Light Fixture Designs and Performance REDAC Subcommittee.
Presented to: By: Date: Federal Aviation Administration Pavement Projects and Plans ANG-E262 REDAC Jeff Gagnon March 15, 2016.
Asphalt Technology Course
At Auburn University National Center for Asphalt Technology Accelerated Pavement Testing Facilities “APT”
Presented to: By: Date: Federal Aviation Administration Full-Scale Testing Overload Update REDAC Subcommittee on Airports David R. Brill, P.E., Ph.D. March.
Presented to: REDAC By: Navneet Garg, Ph.D. Date: March 15, 2016 Federal Aviation Administration RPA P2: National Airport Pavement & Materials Research.
APT IA - FAA UPDATE.
Rongzong Wu, David Jones and John T. Harvey
Barriers to Implementation of In-Place Recycling
Update on PaveLab-LanammeUCR
Phase I Experiment 4 Different pavement structures, 8 sections Compare
Presenters: Sumon Roy1 and Badrul Ahsan1
Update on the current APT Project in Texas
Center of Excellence for Airport Technology, CEAT
Introduction to Pavement Design
Erol Tutumluer & In Tai Kim University of Illinois, Urbana-Champaign
HVS Testing at ERDC – Last Five Years
Dr. Randy West, P.E. Director / Research Professor
AASHTOWare Pavement-ME Design Software: Materials Library
Deterioration and Failure Mechanisms
Colorado State University
Pavement Structural Analysis
Pavement Structural Analysis
Pavement Structural Analysis
Louisiana Accelerated Pavement Research Facility
NRRA Pavement Workshop 2019
Presentation transcript:

Presented to: REDAC By: Navneet Garg, Ph.D. Date: March 15, 2016 Date: March 15, 2016 Federal Aviation Administration Full-Scale Testing – Perpetual Pavement Update

2 Federal Aviation Administration Full-Scale Testing – Perpetual Pavement Update March 15, 2016 Construction Cycle at NAPTF

3 Federal Aviation Administration Full-Scale Testing – Perpetual Pavement Update March 15, 2016 CONSTRUCTION CYCLE – 7 (CC-7) PRIMARY OBJECTIVES –Develop Perpetual Pavements Design criterion for airport pavements. –Vertical strain threshold in the intermediate HMA layer to limit rutting. –Horizontal strain threshold in the HMA base layer to prevent bottom-up fatigue cracking. –Relationship between laboratory fatigue strain threshold and measured field HMA strains. –Study strain distribution in the HMA layer.

4 Federal Aviation Administration Full-Scale Testing – Perpetual Pavement Update March 15, 2016 Perpetual Pavement is “an asphalt pavement designed and built to last longer than 50 years without requiring major structural rehabilitation or reconstruction, and needing only periodic surface renewal in response to distresses confined to the top of the pavement.” [Perpetual Asphalt Pavements – A Synthesis, Asphalt Pavement Alliance] PERPETUAL PAVEMENT

5 Federal Aviation Administration Full-Scale Testing – Perpetual Pavement Update March 15, 2016 CONSTRUCTION CYCLE – 7 (CC-7) PRIMARY OBJECTIVES –Verify/Refine/Modify fatigue model based on the ratio of dissipated energy change (RDEC) –Overload (South Side Pavements) Determine allowable aircraft overload criteria for flexible pavement.

6 Federal Aviation Administration Full-Scale Testing – Perpetual Pavement Update March 15, 2016 PERPETUAL PAVEMENT

7 Federal Aviation Administration Full-Scale Testing – Perpetual Pavement Update March 15, 2016 CC7 – PERPETUAL PAVEMENTS

8 Federal Aviation Administration Full-Scale Testing – Perpetual Pavement Update March 15, 2016 Pavement Cross Sections

9 Federal Aviation Administration Full-Scale Testing – Perpetual Pavement Update March 15, 2016 Pavement Instrumentation H-Bar Strain Gages (ASG)H-Bar Strain Gages (ASG) Multiple Depth Deflectometers (MDD)Multiple Depth Deflectometers (MDD) Fiber Optic Strain PlatesFiber Optic Strain Plates

10 Federal Aviation Administration Full-Scale Testing – Perpetual Pavement Update March 15, 2016 Traffic Tests: Standard NAPTF wander pattern.Standard NAPTF wander pattern. 55 kips wheel load, 6-wheel gear.55 kips wheel load, 6-wheel gear. Pavement MonitoringPavement Monitoring –Straight Edge Rut Depth Measurements –Surface profiles –Crack maps

11 Federal Aviation Administration Full-Scale Testing – Perpetual Pavement Update March 15, 2016

12 Federal Aviation Administration Full-Scale Testing – Perpetual Pavement Update March 15, 2016

13 Federal Aviation Administration Full-Scale Testing – Perpetual Pavement Update March 15, 2016

14 Federal Aviation Administration Full-Scale Testing – Perpetual Pavement Update March 15, 2016

15 Federal Aviation Administration Full-Scale Testing – Perpetual Pavement Update March 15, 2016

16 Federal Aviation Administration Full-Scale Testing – Perpetual Pavement Update March 15, 2016

17 Federal Aviation Administration Full-Scale Testing – Perpetual Pavement Update March 15, 2016 Summary: Severe cracking in LFC4-N, LFP5-N, & LFS6-N.Severe cracking in LFC4-N, LFP5-N, & LFS6-N. LFP-4N has comparatively less cracking/rutting compared to LFC-5N.LFP-4N has comparatively less cracking/rutting compared to LFC-5N. Minor cracking in LFP3-N, cracks extending from LFP4-N.Minor cracking in LFP3-N, cracks extending from LFP4-N. No cracks in LFP-1N and LFP-2N.No cracks in LFP-1N and LFP-2N. Traffic tests to continue in Spring’2016.Traffic tests to continue in Spring’2016.

18 Federal Aviation Administration Full-Scale Testing – Perpetual Pavement Update March 15, Thank you!