General Overview of the Romanian Nuclear Utility NUCLEARELECTRICA Dumitru Dina Head of Nuclear Safety Department 1WASHINGTON DC, USTDA - 2010, September.

Slides:



Advertisements
Similar presentations
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
Advertisements

Licensing of Nuclear Power Plants in Pakistan
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
MODULE “STRATEGY DEVELOPMENT”
SOCIETATEA NATIONALA “NUCLEARELECTRICA” SA FINANCING EXPERIENCE FOR FINALISATION OF NEW NUCLEAR UNITS IN ROMANIA Dr. IOAN ROTARU Technical Meeting on Milestones.
1 MAIN ASSUMPTIONS  Federal Law “ON USE OF THE ATOMIC ENERGY”  Federal Law “ON RADIATION SAFETY OF THE POPULATION”  Law of Russian Federation “ON CONSERVATION.
Thailand NUCLEAR POWER PROGRAM INFRASTRUCTURE AND STATUS OF IMPLEMENTATION: Regulatory Body Prof. Dr. Chaivat TOSKULKAO Secretary General Office of Atoms.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Technical Due Diligence Renewable Energy We build with Passion!
1 “Lessons Learned - Construction of the National Enrichment Facility” Stephen Cowne Director, Quality & Regulatory Affairs Louisiana Energy Services (LES)
THE NUCLEAR POWER IN ROMANIA F. Glodeanu, G. Andrei New Cooperation Strategies in the Geopolitical and Economic European Space – UE 27 Thessaloniki, June.
Pg 1 CANDIAN TECHNOLOGY TRANSFER CERNAVODA CANDU PROJECT The International Nuclear Energy Congress, Istanbul, Turkey, April 11-12, 2007 Dr. Sardar Alikhan,
Tom MAZOUR IAEA, Division of Nuclear Power
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
Regulation of SLOWPOKE Research Reactor Facilities in Canada
Energy Forum 2011, Changing the Energy Paradigm and Outlook for South-Eastern EU Energy Forum 2011 Nuclear Safety Regulation in Romania Recent Developments.
MODULE “PROJECT MANAGEMENT AND CONTROL” ORGANIZATION AND ADMINISTRATIVE CONTROL SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
Group Presentation to 27 th - 29 th May 2009 International Nuclear Forum BULGARIAN NUCLEAR ENERGY – NATIONAL, REGIONAL AND WORLD ENERGY SAFETY.
JRC Information Day – May 11, 2006, Bucharest 1 Valică GOREA President of Nuclear Agency GOVERNMENT of ROMANIA Romanian Nuclear Programme Medium and Long.
1 ESTABLISHMENT OF REQUIREMENTS Module “National legislation and licensing” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
Energy for the Future Belene Nuclear Power Plant Project Status.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
Thailand’s Preparation for Starting a Nuclear Power Program Mr. Pricha Karasuddhi Technical Advisor Nuclear Power Program Development Office(NPPDO) Ministry.
Current Practices of NPP Spent Nuclear Fuel Management in Romania
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
1 ESTABLISHMENT OF REQUIREMENTS Module “ Development of regulatory framework for oversight of decommissioning Project BG/04/B/F/PP , Program “Leonardo.
Secondary legislation on renewable today and tomorrow Nicolae Opris Vicepresident, ANRE ANRE ROMANIAN ENERGY REGULATORY AUTHORITY.
LEGAL and REGULATORY FRAMEWORK for NUCLEAR and RADIATION SAFETY in BULGARIA General overview Dr. M. Mateeva – Chief Inspector R. Markova-Mihaylova – Chief.
ROMANIAN EXPERIENCE IN TRAINING AND QUALIFICATION OF THE NPP OWNER/OPERATOR FOR UNIT 1 OF CERNAVODA NPP Dr. Ioan Rotaru TM/WS on Topical Issues on Infrastructure.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 2: Project Management 1.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
RECOMMENDATIONS ON IMPROVEMENT OF PUBLIC PROCUREMENT SYSTEM Experts: Bazakeeva Jyldyz Jamanchaevna Abdymomunona Saina Ryskeldievna Recommendations were.
Oil Sands & Nuclear Energy: Our Integrated Energy Vision Presentation for: Energy Roundtable, Calgary Presentation by Wayne Henuset, Director September.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
Leading State Inspector Ivan Rovkach Department of Nuclear and Radiation Safety Ministry of Emergency Situations of the Republic of Belarus(GOSATOMNADZOR)
Jussi helske1 Workshop on the learning of EC approaches and experience in Licensing of New NPP’s Existing in European Union countries procedures.
Renewable energy support schemes in the Republic of Moldova
VIETNAM Training and Tutoring Feedback
DDG Nuclear Energy: Mr Zizamele Mbambo
Who Is Southern Power? Stephen Gowland Business Development Manager
STATE LAW OFFICE AND DEPARTMENT OF JUSTICE
János Krutzler Hungarian Atomic Energy Authority
THAILAND Training and Tutoring Feedback
SESSION 3 Policy Framework
SESSION 3 Policy Framework
Janet R. Schlueter Senior Director, Radiation and Materials Safety
PROJECT MANAGEMENT (ARCH 484) DEPARTMENT OF ARCHITECTURE & BUILDING SCIENCE.
Flooding Walkdown Guidance
Developing and Issuing the RFP
ChE 473K Plant Design R. Bruce Eldridge.
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Regulatory Control Training Workshop
Nuclear Power in Jordan
Joint WG on Guidance for an Integrated Transport and Storage Safety Case for Dual Purpose Casks TM TM to Produce Consolidated Drafts of the IAEA’s.
Regulatory Cooperation Forum (RCF) - Plenary 2018
USNRC IRRS TRAINING Lecture18
National Radioactive Waste Management Agency Bill
Legal and Regulatory Framework for Nuclear Installations in IRAN
Controlling Project Cost and Schedule
Mostafa El-Asiry Nuclear Power Plants Authority (NPPA), Cairo, Egypt
CANDIAN TECHNOLOGY TRANSFER CERNAVODA CANDU PROJECT
REGULATORY ASPECTS OF RADIOACTIVE WASTE MANAGEMENT IN TURKEY Dr
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Presentation transcript:

General Overview of the Romanian Nuclear Utility NUCLEARELECTRICA Dumitru Dina Head of Nuclear Safety Department 1WASHINGTON DC, USTDA , September

2 1. Introduction; 2. Nuclearelectrica’s structure; 3. Mission and strategic objectives; 4. Units technical design characteristics; 5. Nuclear spent Fuel storage; 6. Romania’s energy structure; 7. Cernavoda NPP performance; 8. Cernavoda Units 3&4 Project; Content:Content: WASHINGTON DC, USTDA , September

3 Romania chose to develop the nuclear program based on Canadian, American and Italian technology, recognized as Western safe design. The first Nuclear Power Plant in Romania was designed to operate with 5 units, CANDU-6 type, with a Generated Power of MW(e) each. The site was chosen in SE of Romania, on Danube River, close to Cernavoda town, about 180 km far away east from Bucharest. 1. Introduction WASHINGTON DC, USTDA , September

4 1. Introduction (cont’) WASHINGTON DC, USTDA , September

Shareholders: - Romanian State – 90.28% - Property Fund – 9.72% Main Activity: Electrical Power and Heat Production, NPP Construction and Commissioning and Nuclear Fuel Fabrication SNN S.A. Cernavoda NPP – Units 1&2Nuclear Fuel Plant Pitesti Safe & Efficient operation of Units 1&2 – CANDU-6: 700 MWe Nuclear fuel fabrication for two units 2. Nuclearelectrica’s Structure 5WASHINGTON DC, USTDA , September

Mission To produce electrical and thermal energy using nuclear fission, to develop the nuclear industry and fuel manufacturing, in full compliance with the highest nuclear safety standards, economic efficiency and protection of people and environment – 2015 SNN Strategic Objectives General Objective: maintain it’s identity as a nuclear electricity producer, increase profitability and continuously improve the technical-economic indicators; Target-indicators associated with the Strategic Objective 1. Gross Capacity Factor: 93% for each unit; 2. Personnel Indicator: 1man / installed MW for Units 1 and 2 Cernavoda NPP operation; 3. Operation Cost: increase over period - capped to 30%; 4. Annual Profit Margin: 4-6% of the annual turnover; 5. Installed capacity increase: by 50% through completing Units 3&4 (51% Romanian quota share) 3. Mission and Strategic Objectives 6WASHINGTON DC, USTDA , September

4. Units technical design characteristics 7WASHINGTON DC, USTDA , September

8 Nuclear Spent Fuel Storage (AECL Canada) – first module 2003; the second 2006; the third 2007; fourth 2010 Final profile: 4 small-sized modules (MACSTORE 200) and 34 large-sized modules (MACSTORE 400) – covering 40 years of operation for 4 Units ; 5. Nuclear Spent Fuel Storage WASHINGTON DC, USTDA , September

6. Romania’s Energy Structure (2008) 9WASHINGTON DC, USTDA , September

6. Romania’s Energy Structure (2009) – (cont’) 10WASHINGTON DC, USTDA , September

7. Cernavoda NPP’s Performance – (cont’) Gross Capacity Factor for Units 1&2 7. Cernavoda NPP’s Performance – (cont’) Gross Capacity Factor for Units 1&2 11WASHINGTON DC, USTDA , September

7. Cernavoda NPP’s Performance – (cont’) CANDU reactors performance-Quarter Cernavoda NPP’s Performance – (cont’) CANDU reactors performance-Quarter WASHINGTON DC, USTDA , September

13 INVESTORS NUCLEARELECTRICA 8. Cernavoda Units 3 & 4 Project WASHINGTON DC, USTDA , September

14 MAIN CHARACTERISTICS: Reactor Type:CANDU 6 Installed Output:2 x 720 Mwe Delivered Power:2 x 5,239 TWh/year Completion Cost: aprox. 4 bl. Euro (preliminary) Schedule: 77 months per unit (preliminary) Unit Life: 30 years, possible Cernavoda Units 3 & 4 Project (cont’) WASHINGTON DC, USTDA , September

15 Milestones (preliminary) Construction 77 Months Construction 8. Cernavoda Units 3 & 4 Project (cont’) WASHINGTON DC, USTDA , September

Why CANDU? Existing Cernavoda site –licensed by Romanian Regulatory Body Take advantage of the advanced status of site civil works:52% Unit 3 and 30% Unit 4 started on CANDU 6 technology Excellent operating records at Cernavoda Units 1&2 Proven technology: CANDU Units in operation are among top ranked plants worldwide Existing local qualified expertise for CANDU plants in: design and R&D manufacturing fuel and heavy water construction, commissioning, operation & maintenance Licensing process initiated: Licensing Basis Document : approved Environmental Permit: in final stage Other main licenses activities: in progress 8. Cernavoda Units 3 & 4 Project (cont’) 16WASHINGTON DC, USTDA , September

Notification to EURATOM on the basis of art. 41  Art. 41 of the EURATOM Treaty “The individuals and industrial sectors described in Appendix II (nuclear power reactors of all types and for all usage purposes) have the obligation to notify the Commission the investment projects regarding new installations, as well as replacements and transformations in conformity to the criteria regarding the nature and the importance defined by the Council and established at the proposal of the Commission”  EnergoNuclear has notified the European Commission in accordance with art.41 of EURATOM treaty in June 2009  Currently, the European Commission is analyzing the project from the point of view of compliance with the provisions of the EURATOM Treaty and will send the Romanian authorities the official opinion. The favorable opinion of the European Commission represents a condition to start construction works on the two nuclear units and also for a possible EURATOM credit request by the Romanian Government. 8. Cernavoda Units 3 & 4 Project (cont’) 17WASHINGTON DC, USTDA , September

EnergoNuclear develops the Project, according to the Investor Agreement endorsed by GD 1565/2008, in two phases: Phase 1: The Pre-Project Phase 1. To arrive at final Project definition and cost and to perform the work required to achieve FID (Final Investment Decision) Inspection and evaluation of the existing assets Selection of main contractor Review of the feasibility study Negotiation and conclusion of main contracts and agreements (O&M, electricity off-take, decommissioning and waste disposal, etc.) Obtaining necessary approvals and licenses Financial agreement 8. Cernavoda Units 3 & 4 Project (cont’) 18WASHINGTON DC, USTDA , September

2. To perform technical/commercial work required to meet the project schedule post-FID Tech Specs for long term delivery equipment Initial plan for recruiting key operational staff 3. The Pre-Project Phase shall have as a result the Final Investors Decision by FIDD (September 30th 2010) Remarks Only activities necessary to obtain the construction license and to meet project schedule requirements will be undertaken No construction work will take place during Pre-Project phase 8. Cernavoda Units 3 & 4 Project (cont’) 19WASHINGTON DC, USTDA , September

Phase 2: The Project Phase Implementation of the Project by the Main Contractor. Main activities to be delivered: detail design and licensing equipment procurement construction and installation commissioning and testing starting commercial operation 8. Cernavoda Units 3 & 4 Project (cont’) 20WASHINGTON DC, USTDA , September

21 THANK YOU! WASHINGTON DC, USTDA , September