LBDS YETS activity report Viliam Senaj MKD meeting, 19/01/2016.

Slides:



Advertisements
Similar presentations
Inspection & Preventive maintenance of breakers
Advertisements

Solar Cell Efficiency Flight Readiness Review Teddy Bounds Angela Dunn Joel Sasser.
Target Update – Mico Meeting Monday 21 st April 2008 General Expect to obtain new coils for stators anytime New Shafts at RAL for metrology. Will be back.
LHC Beam Dumping system
1 MKBH Erratic Jan Uythoven On behalf of the ABT team (Viliam, Nicolas M., Etienne, Laurent, Francesco etc…..) MPP meeting 8/5/2015.
 Solar power is a form of energy that uses the worlds biggest energy source…the sun!
FHCT SEB cross-section measurements at H4IRRAD and with cosmic rays and its influence to LHC abort system reliability Viliam Senaj RadWG meeting 04/10/2011.
MKD stack upgrade MKD generator meeting Viliam Senaj 23/06/2015.
LBDS commissioning – MKD tests Viliam Senaj, 11/12/2013.
How Does Electricity Flow? Electricity & Magnetism Science Instructor: Miss Aartman.
High Density Cooling Air conditioning for high density applications
Learning, our way Examples of bad installation. CONTENT Installation related examples Installation related examples Application related examples Application.
INTRODUCTION Definition:
Proposed LHC beam dumping kicker generator modifications for LS2 TE-TM Meeting Viliam Senaj 07/07/2015.
Batteries The purpose of the battery is to act as a reservoir for storing electricity.
The DUCTZ Experience. A Brief Overview of how DUCTZ Cleans a Heating and Cooling System.
Healthy Work Practices. Selected Examples Lead Safe Work Practices Spray Foam Worker Protections Bath Fan Installation Dryer Vent Installation Air Sealing.
A NEW ROBBINS PARK CABIN Kelly Lorenzi, Kaileigh Degon, Sydney Smith.
LIBD on LBDSmeeting Viliam Senaj 04/02/2014. MKB test MKB vacuum level satisfactory for beginning of HV test: – B1: between 3.1x10 -7 and 5.7x10 -7 (new.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
INSTALLATION & COMMISSIONING. 5WSS Installation Hanging the Unit Hanging the Unit Location Considerations Location Considerations Refrigerant Piping Refrigerant.
1 LBDS Testing Before Operation Jan Uythoven (AB/BT) Based on the work of many people in the KSL, EC and TL sections.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
1 Beam Dumping System MPP review 12/06/2015 Jan Uythoven for the ABT team.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
MKD Reliability run Viliam Senaj TCM meeting 18/11/2014.
MKD dust related actions Viliam Senaj Technical Coordination Meeting 27/01/2015.
LHC Beam Dumping System Experience from reliability run and Re-commissioning procedures MPP Nicolas Magnin – TE/ABT/EC.
1 ABTEF - 16/05/2014 Maintenance of safety-critical systems : LBDS - MKD / MKB on LHC.
YETS LHC 2015/16 - ABT Group TCM Francesco castronuovo.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
YETS status report TCM Francesco castronuovo.
Technology Department 2 April 2015A.Adraktas1 MKD 3D field calculations A. Adraktas Acknowledgments: V. Senaj MKD meeting, 2 April 2015.
YETS status report TCM Francesco castronuovo.
FHCT SEB cross-section measurements at H4IRRAD and consequences for MKD reliability Viliam Senaj LIBD meeting 24/01/2012.
PHYSICS – Electrical quantities (1)
AUSTRALIAN NATIONAL UNIVERSITY NUCLEAR PHYSICS DEPARTMENT  14 UD McSNICS ION SOURCE EARTH SAFETY  GASNICS CORONA DISCHARGING ISSUES Gareth Crook.
Static Electricity What are the fundamental particles and how do they interact?
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
ARÇELİK TİCARİ KLİMA EĞİTİM DÖKÜMANI APPENDIX.
David BAILLEUX On behalf of the Caltech group Issues for the Laser Monitoring System M&O - US CMS ECAL IB meeting 19 March Chilled water supply.
ELECTRICAL ENERGY BASED PROCESSES
The New C55* CPVSd 10-20hp People. Passion. Performance.
Thermo-electric refrigeration.
TE-MSC-SCD EYETS th September, 2017.
Quality Control Chamber Production
Proposition of MKD & MKBH modification with the goal to reduce maximum voltage (and risk of erratic) Viliam Senaj, 05/05/2017.
Helsinki T2 status Risto Orava/ on behalf of Kari Kurvinen
New Line 5000 Dryers Dryer T5290 – T5550 – T5675
AdaptaPAK The sustainable, energy-efficient outdoor refrigeration solution.
LHC Beam Dumping System Reliability Run Summary
MKD/MKB Review Meeting Scope and Definition
Consequences of warming-up a sector above 80 K
Viliam Senaj MKD meeting 23/05/2017
RF operation of REX-ISOLDE
Overview of LBDS related tasks
STATIC ELECTRICTY.
Electrostatics in our everyday lives
Static electricity.
Effect of Using 2 TE units on Same Heat Sink
CHAPTER 45 Engine Lubrication.
EVLA LO/IF Racks/Bin/Modules
AL-HUSSAINI AND AL-YAHYA (HUYA) INSULATION FACTORY, DAMMAM
L 25 Electricity & Magnetism [2]
Electrostatics in our everyday lives
The DUCTZ Experience 1.
The DUCTZ Experience 1.
IOT operation in the SPS Long term experience TWC 800 MHz
PHYSICS – Electrical quantities (1). LEARNING OBJECTIVES Core State that there are positive and negative charges State that unlike charges attract and.
Technologies Teacher Answers to Practical Activities 1-3
Presentation transcript:

LBDS YETS activity report Viliam Senaj MKD meeting, 19/01/2016

Maintenance activities on MKD’s Replacement of perforated side panels by non-perforated ones (to reduce dust penetration into the dust sensitive top compartment with capacitors): B1+B2 - done Adding an insulation foam between top and bottom compartment: B1+B2 - done Swap of GTO stacks in order to reduce peak current difference between 2 branches - done MKD E/B1 st.A with MKD E/B2 st.A (both Westcode) MKD M/B1 st.A with MKD A/B2 st.A (both ABB) Cleaning of MKD generators: B1+B2 – done Endoscopic inspection after cleaning – B1 done: some dust and fibers observed but also 4 major problems found: Metal stripe in a sensitive region of GTO stack in MKD M/B1 st.A (swapped during YETS) Incorrect position of cooling fan frame on several generators Important quantity of fibbers/dust on the capacitors interconnecting brass bar of MKD I/B1 – dry cleaning? Missing washer between GTO stack and copper bar MKD E/B1 st.A (swapped during YETS) Endoscopic inspection of filtering capacitors - small leak found (less than on MKB)

Metallic piece in sensitive region – MKD M/B1 st.A

Non-correct position of cooling fan frame MKD N/B1MKD L/B1 MKD E/B1 Increases risk of electrostatic charging (by air flow) of plexiglas insulators of stack A return rods and thus increases risk of erratic

Dust and fibbers on interconnecting brass bar MKD I/B1

MKD E/B1 st.A – washer between stack and copper bar not installed back after intervention

Maintenance activities MKB’s Replacement of 3 stacks GTO due to sw_ratio evolution: MKBH A, B, D/B1; by mistake the stacks were first replaced on B2 (confusion of FSU with MKD/B1 which is in UA 63 while MKBH/B1 is in UA67) Endoscopic inspection of MKBH/MKBV B2 (UA63): – brown traces (oil drops?) on main capacitor HV insulator found; not easy to clean with alcohol… More efficient solution to be find in lab (demineralised water?, acetone?...) and to be cleaned … Measurements of electrical parameters of filtering capacitors (important traces of leak (?) found last year): – no variation found compared to values measured during TS – compared 3 MKBH, 2 MKBV and 1 MKD filtering capacitors Increased clearance of filtering capacitor from conductive surfaces – added washers and changed connection layout

Traces on MKBH HV capacitor, filtering capacitors leak(?)

Conclusion from inspection (MKD/B1+MKB/B2) More rigorous inspection of intervention team to be done (preferably to include Stephane H. into a team) Full body protection clothe (like for a clean room) to be used by intervenants to avoid pollution of generator by clothes fibres Dry cleaning to be avoided Still some (small) holes on top aluminium plate of generators to be blinded (self adhesive tape?)

Inspection team in action

LBDS tests after YETS Generators with GTO stack replaced/swapped during YETS: slow control (soft) + HV test + sparking test: MKD: A + E + M/B1; A + D + E/B2 MKBH A + B + D/B1 + B2 > 2 ES up to 7.1 TeV prior to reliability run (comparison data) “Short cycle test” ~ 4 days: 400 GeV – 30 min ramp up to Emax – Emax – 30 min ramp down; initial “conditioning”: 1 day Emax=6 TeV, 1 day Emax = 6.5 TeV, 1 day Emax = 7 TeV; 1 day Emax = 7.1 TeV “Long cycle test” ~ 4 days: 400 GeV – 30 min ramp up – TeV – 30 min ramp down DC test > 2 days at 7.1 TeV 2ES with update of settings/limits if necessary Cooling conditions during “reliability test” have to be ensured: UA’s ambient temp < 24 deg