Gas Regional Initiative North West Region - Short Term Capacity RCC Meeting Den Haag – 21 September 2010.

Slides:



Advertisements
Similar presentations
Gas Regional Initiative North West Region - Short Term Capacity GRI NW SG Meeting Brussels – 26 November 2010.
Advertisements

The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
GRI North West – RCC Meeting on 28 August Day Ahead – status and legal issues Background Day Ahead pilot project was launched within the ERGEG.
Gas Regional Initiative – North West Region Bonn 28 April 2009 Fiete Wulff Capacity Project C1 Short-Term Capacity (STC) Operators’ Group Update.
PILOT PROJECT ON CAM 17 th SG meeting Madrid 27 th September 2012.
Gas Regional Initiative - Region North / North-West Stakeholders Group Meeting The Hague, October 9th, 2006.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
Gas Regional Initiative – North West Region London 14 November 2008 Chair: Joachim Gewehr Capacity Project C1 Short-Term Capacity (STC) Initial findings.
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project (I1) Update The Manual for near term investment procedures for (cross-
1 Dublin 23/24 April 2007Autor Jacques Guldenmundt EFET, input for discussion on ‘day-ahead-auctions’, Dublin, 23/24 April 2007.
Gas Regional Initiative North-West Transmission System Operators Page 1 Investment work stream GRI North-West Operators‘ Group Investment Work Stream SG.
CMP PROPOSAL FOR HARMONISATION 16 th IG meeting Madrid 6 th May 2011.
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
GRI NW Investment - Update on project Common effort on making regional investment happen 21 September 2010.
Gas Regional Initiative North West Region - Short Term Capacity 7th Stakeholder Group Meeting The Hague – 6 and 7 May 2010.
Bonn Workshops 8 and 9 Feb Balancing workstream.
Gas Regional Initiative – North West Region London 13 and 14 November 2008 Project manager: Erik Rakhou Investment project – I1 (in co-operation with I2)
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
Directie Toezicht Energie 1 Gas Regional Initiative North West Maya van der Steenhoven Programme Office 28 April, 2009 Bonn.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
BALTIC ELECTRICITY MARKET MINIFORA Vilnius 23 November 2006 Tasks of the summary of the IG discussion paper on the Baltic ITC mechanism Dace Bite Public.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Gas Regional Initiative Impact of the 3rd package & creation of RIG Benoît Esnault (CRE), GRI TF co-chair NW GRI – RCC and ministerial meeting Paris, 8.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
1 1 Brussels, 31 st March 2009 Presentation by Peter Hohaus Senior Manager Legal & Regulatory Affairs ERGEG North West Gas Regional Energy Market Transparency.
Gas Regional Initiative – North West Region Stakeholders Group meeting - London 14 November, 2008 Capacity Workshop Coordinated Open Seasons Marie-Claire.
European Transparency Requirements - update Transmission Workstream 1 st May 2008.
Gas Regional Initiative South South-East
Congestion Management
Public Consultation : main conclusions (1/2)
Conclusions STC Core Group 8 September 2009 The Hague
19th GRI Coordination Group meeting
The 3rd package for the internal energy market
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
New transparency guidelines
Strategic rationale According to Roadmap project shall focus on short-tem capacity issues: maximising use of existing capacity including reserve capacity.
ERGEG Gas Regional Initiative NW 5th Stakeholder Group Meeting
Update on GRI NW Transparency Project
Gas Regional Initiative South South-East CAM Implementation Group
2009 TSO Transparency Gas Regional Initiative North-West
Background and Process
EUROPEAN ENERGY MARKET SUMMIT 30 January 2007
ERGEG GRI – N/NW Region Stakeholder Group Meeting
GRI NW European Energy Work Plan 2011 – 2014
ACER’s view on the future role of the Gas Regional Initiative
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
26th February 2015 Teleconference
Synchronous Area Framework Agreement for RG CE
EWRC-RAE MUTUAL PROJECTS
European Transparency Requirements
Gas Regional Initiative Update on progress and latest developments
26th February 2015 Teleconference
GRI NW European Energy Work Plan 2011 – 2014
Transmission Workgroup June 7th 2012
Gas Regional Initiative South South-East
EWRC-RAE MUTUAL PROJECTS
Review Group /09/2007.
EWRC-RAE MUTUAL PROJECTS
Entry Overrun Calculation
Gas Regional Initiative South South-East CAM Implementation Group
Ofgem presentation to Gas Transmission Workstream
ERGEG comment to KEMA study on Art. 3 and 7
ACER’s view on the future role of the Gas Regional Initiative
EUROGAS LNG TASK FORCE Bilbao, 13 March 2009 Presentation by
Gas Regional Initiative South South-East
Presentation transcript:

Gas Regional Initiative North West Region - Short Term Capacity RCC Meeting Den Haag – 21 September 2010

2 RCC Meeting Den Haag – 21 September 2010  According to Roadmap project shall focus on short-tem capacity issues: -maximising use of existing capacity including reserve capacity through examination of how unused capacity could be released day-ahead and -investigating into how TSOs could be incentivised  Aim: make available firm primary capacity on day-ahead market Strategic rationale

3 RCC Meeting Den Haag – 21 September 2010 Day-Ahead Oversubscription  TSO has good knowledge on how much capacity will be used  TSO slightly oversubscribes the system‘s capacity  In (rare) cases where flows exceed the system‘s capability TSO buys back the usage rights from shippers Short-Term Calculation  TSOs calculate available firm capacity based on long term assumptions and scenarios  In the period running up to real time TSOs have more certainty about network conditions, e.g.  Can release additional firm capacity to the market day-ahead Discussed Models

4 RCC Meeting Den Haag – 21 September 2010 Incentivisation  TSOs: Incentive mechanism that compensates the additional financial risks coming along with providing additional capacity is needed  TSOs sees incentive mechanism as prerequisite for further steps  The German case: Regulatory framework did not foresee the possibility of compensating additional financial risks through incentivisation  Other frameworks have in this regard more flexibility  Little progress was achieved, but:  How does Link4Hubs fit in this argumentation?

5 RCC Meeting Den Haag – 21 September 2010  Relevant ordinance “Access to gas transmission networks” has been amended  New ordinance came into force recently  Gives the german regulator possibility of incentivisation  From regulators point of view this issue is solved Amendment of german framework

6 RCC Meeting Den Haag – 21 September 2010  They welcome new ordinance  Lack of possibility of compensating additional risks has been successfully removed  Incentivisation issue is not perceived as an obstacle anymore, but other concerns were raised:  How is the technical available capacity approved by NRA?  Interference with national determination process  Interference with bilateral initiatives Reaction by German TSOs

7 RCC Meeting Den Haag – 21 September 2010  Regular working group meeting  Three proposed dates  ?  ?  ?  Aims of meeting  Agreement of a concrete IP  Timetable until SG Meeting  Determination and commitment by TSOs is key to achieve progress Proposed Way Forward

8 RCC Meeting Den Haag – 21 September 2010 Thank You!