23/11/05BENE meeting at CERN1 (22-25 November 2005) L. Mosca (CEA-Saclay) The MEMPHYS project MEgaton Mass PHYSics in a Large International Underground.

Slides:



Advertisements
Similar presentations
IDM2004 G. Gerbier LSM - Fréjus underground sites status and projects Gilles Gerbier CEA/Saclay - LSM.
Advertisements

J. Strait Fermilab October 21, 2005 The Neutrino Detector of the Future: A Massive Liquid Argon TPC.
NNN07 - Hamamatsu M. Russo - Switzerland Fréjus site pre-study and beyond NNN07 – HAMAMATSU Workshop on Next Generation Nucleon Decay and Neutrino.
11/05/06GDR-Neutrino à Orsay (LAL)1 GDR-Neutrino (10-11 mai 2006) L. Mosca (CEA-Saclay) The MEMPHYS project (Laboratory excavation) MEgaton Mass PHYSics.
BENE Introduction to ISS detector WG Pasquale Migliozzi INFN – Napoli.
Recent Discoveries in Neutrino Physics: Understanding Neutrino Oscillations 2-3 neutrino detectors with variable baseline 1500 ft nuclear reactor Determining.
ISS-2 25 jan KEK Alain Blondel Physics of Future Neutrino Detectors PoF-NuDet detectors and beam instrumentation time scales and cost estimates.
Michel Spiro Particle Physics at the Megawatt proton source. CERN 27 May 2004 Long-range programme in neutrino physics: superbeam, β beam, neutrino factory.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
Sinergia strategy meeting of Swiss neutrino groups Mark A. Rayner – Université de Genève 10 th July 2014, Bern Hyper-Kamiokande 1 – 2 km detector Hyper-Kamiokande.
Neutrino physics: experiments and infrastructure Anselmo Cervera Villanueva Université de Genève Orsay, 31/01/06.
Costing Meeting Ajit Kurup 13 th June Page 2 Costing Meeting 13 th June 2011 Ajit Kurup Summary of CERN costing workshop. Proposed Level 3 breakdown.
PLAN Morning Talk – Long Base Line Neutrino Oscillations – 1) Beam line & brief description of detector 2) Neutrino interaction signal Afternoon talk –
October 12th, 2006L. Mosca LAGUNA Meeting in Zurich 1 IPP- ETH Zurich October 12th, 2006 LAGUNA Meeting WG 7: Safety and Environment Report by L. Mosca.
Alain Blondel Detectors UNO (400kton Water Cherenkov) Liquid Ar TPC (~100kton)
Jacques Bouchez CEA/DAPNIA-Saclay & APC-Paris ISS meeting, detector WG KEK, Jan23 rd, 2006 MEMPHYS : A megaton WČ detector in Fréjus underground laboratory.
NEUTRINO PROPERTIES J.Bouchez CEA-Saclay Eurisol town meeting Orsay, 13/5/2003.
LENA Low Energy Neutrino Astrophysics L. Oberauer, Technische Universität München LENA Delta EL SUD Meeting.
K. Nakamura NNN05, Aussois, April Overview of Hyper-Kamiokande R&D Kenzo NAKAMURA KEK April 7-9, 2005 NNN05 Aussois, Savoie, France.
I. Giomataris NOSTOS Neutrino studies with a tritium source Neutrino Oscillations with triton neutrinos The concept of a spherical TPC Measurement of.
L. MoscaNNN07 Conf - 2 to 5 Oct NNN07 Conference at Hamamatsu 2 to 5 October 2007 Report on LAGUNA Large Apparatus for Grand Unification and Neutrino.
L. MoscaEPIPHANY Conf 6-8 Jan EPIPHANY Conference at Cracow “Physics in Underground Laboratories and its connection with LHC” - 6 to 8 January 2010.
ESSnuSB Project for Leptonic CP Violation Discovery based on the European Spallation Source Linac NOW 2014, 10/9E. Wildner, CERN 2 Elena WILDNER CERN for.
Homestake Massive Detector & Long Range Neutrino Oscillation Program 1) Introduction – Ken Lande 2) Long Base Line Neutrino Oscillations – Milind Diwan.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
LAGUNA Large Apparatus for Grand Unification and Neutrino Astrophysics Launch meeting, Heidelberg, March 2007, Lothar Oberauer, TUM.
ESS based neutrino Super Beam for CP Violation discovery Marcos DRACOS IPHC-IN2P3/CNRS Strasbourg 1 20 August 2013M. Dracos.
Long Baseline Experiments at Fermilab Maury Goodman.
-NUCLEUS INTERACTIONS OPEN QUESTIONS and FUTURE PROJECTS Cristina VOLPE Institut de Physique Nucléaire Orsay, France.
If  13 is large, then what ? Hisakazu Minakata Tokyo Metropolitan University.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
Hyper-Kamiokande project and R&D status Hyper-K project Motivation Detector Physics potential study photo-sensor development Summary Kamioka.
Deep Underground Large Water Cerenkov Detectors Two types have been proposed. 1) Horizontal cylinders ~60 m diameter by 180 m long – UNO & HyperKamiokande.
A new underground laboratory at Frejus Jacques Bouchez CEA-SACLAY NNN05-Aussois April 7, 2005 Historical overview Latest developments Outlook.
EUROn Safety 13/06/2012M. Dracos1. Safety workshop 13/06/2012M. Dracos2 A first two days safety workshop has been organized at CERN last May (
J. Bouchez CEA/DAPNIA CHIPP Neuchâtel June 21, 2004 A NEW UNDERGROUND LABORATORY AT FREJUS Motivations and prospects.
ESS based neutrino Super Beam for CP Violation discovery Marcos DRACOS IPHC-IN2P3/CNRS Strasbourg 1 10 September 2013M. Dracos.
EUROnu WP5 Detector Costing EuroNu Annual General Meeting, Strasbourg 3 June 2010 Paul Soler.
SPL, Beta beams and the Neutrino Factory. Leslie Camilleri NuSAG 20th May 2006.
A monochromatic neutrino beam for  13 and  J. Bernabeu U. de Valencia and IFIC NO-VE III International Workshop on: "NEUTRINO OSCILLATIONS IN VENICE"
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
Deep Underground Large Water Cerenkov Detectors Two types have been proposed. 1) Horizontal cylinders ~60 m diameter by 180 m long – UNO & HyperKamiokande.
Jacques Bouchez Radioactive Beams for Nuclear and Neutrino Physics Les Arcs Mars 2003.
Cristina VOLPE BETA-BEAMS The beta-beam concept The baseline scenario The physics potential Conclusions LOW ENERGY BETA-BEAMS A N D The idea Motivation.
Hiroyuki Sekiya ICHEP2012 Jul 5 The Hyper-Kamiokande Experiment -Neutrino Physics Potentials- ICHEP2012 July Hiroyuki Sekiya ICRR,
Science Requirements and Instrumentation for Future Neutrino Experiments Gina Rameika, Fermilab Instrumentation Frontier Community Planning January 9 –
1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) ALAN AULD GROUP LTD The design of a pan-European.
CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
“Megaton” Cerenkov Detector - Excavation Kenneth Lande, Univ. of Pennsylvania 4200 mwe Depth.
NNN11 Conference at Zurich 7-9 November 2011 The LSM Laboratory at the Fréjus site : present and future by L. Mosca ( LSM/CEA/CNRS)
Epiphany06 Alain Blondel A revealing comparison: A detailed comparison of the capability of observing CP violation was performed by P. Huber (+M. Mezzetto.
The XXII International Conference on Neutrino Physics and Astrophysics in Santa Fe, New Mexico, June 13-19, 2006 The T2K 2KM Water Cherenkov Detector M.
Marcos DRACOS IPHC-IN2P3/CNRS Université de Strasbourg
UK Neutrino Factory Conceptual Design
LAGUNA and beyond GDR Neutrino at Orsay-PNO October 11th, 2010
The (Past &) Future of Neutrino Physics
IPHC-IN2P3/CNRS Strasbourg
EURONu Collaboration Board,
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
Marcos DRACOS IPHC-IN2P3/CNRS Université de Strasbourg
Alain Blondel 11 October 2010 GDR NEU2012 summary
Physics with the ICARUS T1800 detector
Overview of the Jiangmen Underground Neutrino Observatory (JUNO)
Superbeams with SPL at CERN
Linear Accelerator Laboratory – Orsay – France
Precision era.
Daya Bay Neutrino Experiment
A High Intensity Neutrino Oscillation Facility in Europe
Institut de Physique Nucléaire Orsay, France
Overview of the Jiangmen Underground Neutrino Observatory (JUNO)
Presentation transcript:

23/11/05BENE meeting at CERN1 (22-25 November 2005) L. Mosca (CEA-Saclay) The MEMPHYS project MEgaton Mass PHYSics in a Large International Underground Laboratory in the Fr é jus tunnel -proton decay -supernovae explosion -solar and atmosph é ric neutrinos -neutrino super-beam and beta-beam from CERN

23/11/05BENE meeting at CERN2 The MEMPHYS project Physics Motivations The Installation - a Very Large Laboratory - a MegaTon scale Detector - the Neutrino Beams Expected physics potential Tentative schedule

23/11/05BENE meeting at CERN3 The MEMPHYS Project 65m Fréjus CERN 130km 4800mwe Excavation engineering pre-study has been done for 5 shafts Water Cerenkov modules at Fréjus CERN to Fréjus Neutrino Super-beam and Beta-beam

23/11/05BENE meeting at CERN4 Physics Motivations Nucleon Decay Super Novae Neutrinos: burst & relic Solar & Atmospheric Neutrinos Neutrinos from Accelerators Super Beam, Beta Beam –And also: –Dark Matter (WIMP) indirect detection, High energy neutrinos,…

23/11/05BENE meeting at CERN5 A Very Large Laboratory In the middle of the Fréjus tunnel at a depth of4800 m.w.e a preliminary investigation shows the feasibility to excavate up to five shafts of about 250,000 m 3 each

23/11/05BENE meeting at CERN6

23/11/05BENE meeting at CERN7 Main results of the Preliminary Study 1) the best site (rock quality) is found in the middle of the mountain, at a depth of 4800 mwe : a really good chance ! 2) of the two considered shapes : “tunnel” and “shaft”, the “shaft (= well) shape” is strongly preferred 3) Cylindrical shafts are feasible up to : a diameter  = 65 m and a full height h = 80 m (≈ m 3 ) 4) with “egg shape” or “intermediate shape” the volume of the shafts could be still increased 5) The estimated cost is ≈ 80 M€ X Nb of shafts

23/11/05BENE meeting at CERN8 Exemple of “egg shape” simulation, constrained by the rock parameter measurements made during the present tunnel and laboratory excavation. The main feasibility criterium is that the significantly perturbated region around the cavity should not exceed a thickness of about 10 m

23/11/05BENE meeting at CERN9 Two examples of scenario for Water Cerenkov detectors a) 3 shafts of m 3 each, with a fiducial mass of 450 Ktons (“UNO-like” scenario) b) 4 shafts of m 3 each, with a fiducial mass of 600 Ktons _____________________________________________________ -> In both scenarios one additional shaft would be necessary for a Liquid Argon detector of about 100 ktons total mass

23/11/05BENE meeting at CERN10 A MegaTon scale Detector 3 to 4 Water Cerenkov modules ( = 20 x Super K ≈ 500kT fiducial mass) equipped with a large number of Photodetectors (eg. 250,000 PMTs 12”) a very well proved and robust technique which provided already remarkable physical results mainly in Nucleon Decay and Neutrino Physics and Astrophysics

23/11/05BENE meeting at CERN11 Very intense 300÷400 MeV Neutrino Beams from CERN Super Beam based on a 4MW Proton Driver (eg. SPL) :   and   from pion decay Beta Beam (possibly in connection with the EURISOL project) : e  and  e from heavy ions decay

23/11/05BENE meeting at CERN12 Main Physics potential A) non accelerator physics Nucleon decay - up to ~ yrs (p→e +  0 ) - few yrs (p→  K + ) with a detection threshold below 6MeV – Neutrino bursts from Super-Novae explosion –150,000 events from SN at 10kpc –50 events from Andromeda – Relic Neutrinos from past Super-Novae explosions –250 events/10y/0.5Mt (with pure water) –2500 events/10y/0.5Mt (with Gd loaded water)

23/11/05BENE meeting at CERN13 Main Physics potential (continued) B) accelerator physics PMNS matrix parameters measurement :  13 < (  beam 2.5Mt.y) -> for 40° 3  ( at  13 = 1° and 10yrs of Beta Beam and Super Beam )

23/11/05BENE meeting at CERN14 SUPERBEAM BETABEAM  → e e →   Superbeam + beta beam together 2 ways of testing CP, T and CPT : redundancy and check of systematics 2 beams 1 detector 2yrs 8yrs 5yrs pure4 flavours + K    

23/11/05BENE meeting at CERN15 A possible schedule for a European Lab. at Frejus Year Safety tunnel Excavation Lab cavity Excavation P.S Study detector PM R&DPMT production Det.preparation InstallationOutside lab. Non-acc.physics P-decay, SN Superbeam Construction Superbeam betabeam Beta beam Construction decision for cavity digging decision for SPL construction decision for EURISOL site

23/11/05BENE meeting at CERN16 Design Study for the MEMPHYS’ Laboratory concerning the excavation of 3 to 5 “shafts” of about m 3 each in the central region of the Fréjus Tunnel, the associated equipments and the mechanics of the detector modules : a) precise “in situ” investigation of the rock quality parameters b) optimisation of the shafts shape c) optimisation (choice) of the type of local access d) definition of the required equipments : ventilation and air-conditioning, water purification “factory”, electric power supply, etc. e) definition of the best solution for the water containment and for the photo-detectors support