© CISST ERC, 2011 Integration of LARS and Snake Robots (LARSnake) & System Development Checkpoint Presentation April 26, 2011 600.446 – Computer Integrated.

Slides:



Advertisements
Similar presentations
Kinematic Synthesis of Robotic Manipulators from Task Descriptions June 2003 By: Tarek Sobh, Daniel Toundykov.
Advertisements

Modeling the Process and Life Cycle CSCI 411 Advanced Database and Project Management Monday, February 2, 2015.
The Pied Pipers Alyssa Visitacion Ken Shum Joanne Flores.
A Comparative Study of Network Protocols & Interconnect for Cluster Computing Performance Evaluation of Fast Ethernet, Gigabit Ethernet and Myrinet.
KaZaA: Behind the Scenes Shreeram Sahasrabudhe Lehigh University
IMPLEMENTATION ISSUES REGARDING A 3D ROBOT – BASED LASER SCANNING SYSTEM Theodor Borangiu, Anamaria Dogar, Alexandru Dumitrache University Politehnica.
‘Tis not folly to dream: Using Molecular Dynamics to Solve Problems in Chemistry Christopher Adam Hixson and Ralph A. Wheeler Dept. of Chemistry and Biochemistry,
ECE 477 Final Presentation Team 16 − Spring 2013 Scott Stack Neil Kumar Jon Roose John Hubberts.
Graph Data Management Lab, School of Computer Science Add title here: Large graph processing
Outline 3  PWA overview Computational challenges in Partial Wave Analysis Comparison of new and old PWA software design - performance issues Maciej Swat.
COBXXXX EXPERIMENTAL FRAMEWORK FOR EVALUATION OF GUIDANCE AND CONTROL ALGORITHMS FOR UAVS Sérgio Ronaldo Barros dos Santos,
University of Southern California Center for Systems and Software Engineering Barry Boehm, USC CS 510 Software Planning Guidelines.
5 May 98 1 Jürgen Knobloch Computing Planning for ATLAS ATLAS Software Week 5 May 1998 Jürgen Knobloch Slides also on:
AMIPS: The Anywhere, Multipurpose Image Projection System Nicholas Lord Budirijanto Purnomo Paul Alan Roberts Johns Hopkins University Department of Computer.
Industrial Project: Winter A License Management Application Supervised By : Nir Orlev, BMC Software Done By : Afik Avnon, Dmitriy Rudnik.
10 Aug 2010 ECE/BENG-492 SENIOR ADVANCED DESIGN PROJECT Meeting #7.
T Iteration demo T Iteration Demo Team Balboa I1 - Iteration
Final Year Project 1 (FYP 1)
ROBOT VISION LABORATORY 김 형 석 Robot Applications-B
Milestone 1 Pablo Canseco Domenick Albanese Ronald­-Dean Allado Command and Control Subsystem for Regolith Mining Robot.
Underwater Network Localization Patrick Lazar, Tausif Shaikh, Johanna Thomas, Kaleel Mahmood University of Connecticut Department of Electrical Engineering.
ECE 4006 Final Presentation Group Members – John Sellers - Doug Messick - Kelvin Bunn - Sean James Group Name: Altera NIOS Robot Group School of Electrical.
Modeling and control of a Stewart Platform (Hexapod Mount) 1 Frank Janse van Vuuren Supervisor: Dr Y. Kim.
Status Report #4 LYRA The Remote Accessible Automated Camera Stand Developed by: Juan Cuellar, Nathan Dye, Timothy Hawley, & Matthew Hect October 8, 2012.
1 Reforming Software Delivery Using P2P Technology Purvi Shah Advisor: Jehan-François Pâris Department of Computer Science University of Houston Jeffrey.
Video Overlay Advanced Computer Integrated Surgery ( ) Jeff Hsin, Cyrus Moon, Anand Viswanathan Final Presentation.
ATLAS Database Access Library Local Area LCG3D Meeting Fermilab, Batavia, USA October 21, 2004 Alexandre Vaniachine (ANL)
ME 4451: Robotics Patrick Chang Ryan Stewart Julia Barry Alex Choi
IAEA International Atomic Energy Agency Development of the Basis Document for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
© CISST ERC, 2012 An Improved GUI and Vision- based Guidance for the Robo-ELF Team Members: Jon Kriss Collaborators: Renata Smith Mentors: Kevin Olds,
© CISST ERC, 2011 Integration of LARS and Snake Robots & System Development Project Plan February 15, – Computer Integrated Surgery II H.
IPad Mobile Surgical Console Hanlin Wan Jonathan Satria Mentors: Balázs P Vágvölgyi, Dr. Russell Taylor.
The Robotic ENT Microsurgery System (REMS): Calibration and IRB Study, and Tool Holder Design Checkpoint Presentation CIS II Spring 2015: Brian Gu, Barbara.
© CISST ERC, 2011 Integration of LARS and Snake Robots (LARSnake) & System Development Project Update and Paper Presentation March 10, – Computer.
Fermilab Scientific Computing Division Fermi National Accelerator Laboratory, Batavia, Illinois, USA. Off-the-Shelf Hardware and Software DAQ Performance.
Visual Annotation of Clinically Important Anatomical Landmarks for VitreoRetinal Surgery Project Update Vincent Ng.
Chapter 11 Project Management.
T Project Review X-tremeIT I1 Iteration
SaralTA Batch-07 Software Testing Presented By - Chittaranjan M.
Dynamic force modeling for robot-assisted percutaneous
Integration of LARS and Snake Robots H. Tutkun Sen Mentors: Prof
The Vertically-Integrated Projects (VIP) Program: Integrating Undergraduate Education and Graduate Research Bloom, B. S. (Ed.). (1956). Taxonomy of educational.
Robotic Programming NASA Swarmathon Competition
Software Configuration Management
Software Planning Guidelines
Software Support Framework
Implementation of GPU based CCN Router
iPad Mobile Surgical Console
IoT Network Monitor.
Project Management Software Application PRM 705
ECE 4006 Mid-Term Presentation
Request for Proposal (RFP)
Seq(uence) An(alysis) in KNIME
Serial Data Hub (Proj Dec13-13).
CS 179 Project Intro.
Bowei Tang, Tianyu Chen, and Christopher Atkeson
FACIAL EXPRESSION RECOGNITION USING SWARMS
MGT 605: CH 04 Defining the Project.
Information session SCIENTIFIC & TECHNICAL NEGOTIATIONS Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including climate change)" Brussels 24/06/2013.
IOF Event Overview Tool – status Feb 2018
PERT & WBS from Criticaltools
Pink Elephant Showcase
Status update and testing
Status Report #5 LYRA The Remote Accessible Automated Camera Stand
Pink Elephant Showcase
WT CALL – 31/01/
Approximated Volumetric Reconstruction from Projected Images
Port Back Data Collection & Transition
Progress Report 11/05.
Key Activities/ Milestones
Presentation transcript:

© CISST ERC, 2011 Integration of LARS and Snake Robots (LARSnake) & System Development Checkpoint Presentation April 26, – Computer Integrated Surgery II H. Tutkun Şen Mentor: Paul Thienphrapa

© CISST ERC, 2011 Motivation & Significance A Minimally Invasive Surgical Approach Minimally Invasive Surgery – Helps avoid open surgery/CPB – But more challenging to perform Integrate 3D transesophageal echocardiography (TEE) to aid: – Localization of foreign body – Tracking – Robot guidance Focus on heart for establishing system performance requirements

© CISST ERC, 2011 Experimental Setup SnakeProbe Workstation Computer(s) Water Tank Ultrasound System LARS + Snake Robot TCP/IP C-arm Trigger(s)? ? Linux RTAI FireWireTCP/IP Main Focus

© CISST ERC, 2011 Approach Followed LARS has 7 DOF Snake has 4 DOF Jacobian 6x7Jacobian 6x4 LARSnake has 11 DOF Jacobian 6x11 Kinematically Redundant System For moving it optimization algorithm is needed

© CISST ERC, 2011 Class Hierarchy

© CISST ERC, 2011 Project Timeline 1 We are Here 2 Task 14-Feb21-Feb28-Feb7-Mar14-Mar21-Mar 28- Mar 4-Apr11-Apr18-Apr25-Apr2-May Project Proposal Presentation DONE SPRING BREAK Come Speed with CISST Library DONE Come Speed Snake and LARS Robot Control DONE Devise Schemes of Integration DONE Kinematics Analysis of the Overall System DONE Software Integration DONE DONE DONE System Debugging DONE Medica School Experiments Documentation Final Presentation

© CISST ERC, 2011 Milestones and Progress  Milestone name : Working demo with current approach Planned Date: 04/22/2011 Expected Date: 04/22/2011  Milestone name : Working demo with partially updated snake code Planned Date: 05/06/2011 Expected Date: 05/06/2011

© CISST ERC, 2011 Goals & Deliverables  Minimum Working robot with separate snake computer as a "black box", so one can set the joints over the network but doesn't need to know what version of CISST it is using.  Expected Working robot with “some” updated snake code.  Maximum Working robot with full updated snake code.

© CISST ERC, 2011 Current Status Come Speed with CISST Library Come Speed Snake and LARS Robot Control Devise Schemes of Integration LARS Code is updated (Although this was not in the plan) Kinematic and Software Integration of the Overall System Communication between the computers is established Joint values of the snake robot is obtained via UDP Kinematic equations of both systems examined Combining the Jacobians Sending the calculated joint values to Snake Robot  System Debugging  Snake Code Update

© CISST ERC, 2011 THANK YOU FOR LISTENING QUESTIONS??