D. De Gruttola SALE-01: issues with HV supply fixed SALE-01: issues with HV supply fixed QA weekly meeting 26/04/2016.

Slides:



Advertisements
Similar presentations
March 02, 2009LHCb Muon Commissioning meeting 1 First week of chambers test Alessandro Cardini, Davide Pinci, Fernando Rodrigues, Maria Luisa Porto, Rafael.
Advertisements

The RPC Closed loop Gas System. Schedule for completion - update Status Supplier: ok Mixer: ok Humidifier: ok Purifiers: installed, but not completely.
1 WP 10- High Voltage ’06 March 23 rd HV Trip studies  See previous meetings for the foreseen tests on LBC44  Started late by Clermont people when Clermont.
TRD Status Meeting Münster Clemens Adler TRD ROC Status Status Meeting Münster
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University High Voltage Requirements Commercial Solutions Custom Solutions.
MUID Status: General Detector Health In addition to two disabled HV chains there are four other chains (out of a total of 600) that are largely or totally.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
CAEN November 15, 2002 Vandelli W. 1 Test Conditions Prototype fed by CAEN Module 2527 through 100 m long cables From channels status page on generator.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
Test beam setup: status report 02/03/2009 M. Alfonsi (CERN)
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
The RPC Closed loop Gas System Slides from Bianco and Guida.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
K.WyllieElectronics meeting 29/05/061 RICH Power Supplies & Grounding Thanks to Johan Morant Paolo Baesso Xavier Le Gouard.
LHCb HCAL PMT problems initial report 1 Yu. Guz. LHCb HCAL & ECAL 2 Yu. Guz PMTs of type HAMAMATSU R are used in both HCAL and ECAL. The detector.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
Results from the CMS-RPC tests at CERN Gamma Irradiation Facility Roberto Guida CMS-RPC (Bari, Beijing, Napoli, Pavia, Sofia) Seoul, October 2005.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
M1 Central Part Cable Routing R3 FAR R2 CLOSE R2 FAR + GEM A3 B From chain GEM R2 CLOSE R2 FAR A1 20 A1 A1 A2 A CHAIN Access Front Dané.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Gamma-ray Large Area Space Telescope Tower 1 TVAC tests Bad ladders issues.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
S. Colafranceschi - Ischia CMS RPC Italia1 CMS RPC studies at ISR Stefano Colafranceschi Laboratori Nazionali Frascati Università di Roma – La Sapienza.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
PXD – DEPFET PS noise emission tests Mateo Iglesias Fernando Arteche.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Faculty of Physics, University of Belgrade Collaboration meeting, Dubna 8 th of April, ToF-LR Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
STATUS OF KLOE F. Bossi KLOE GM, ROMA Nov. 13/14.
S.Movchan Straw manufacturing and QC
The GOOFIE detector as a Ternary Mixture Monitor
LKr status R. Fantechi.
FROM UNIVERSE TO SCHOOLS, THE LONG WAY OF COSMIC RAYS.
The High Voltage problem
Acceptance test at Duke
Jean-Sebastien Graulich, Geneva
Preparation of the EEE telescope for Forbush decrease observation
Analysis and paper on chamber and telescope performance
Microcavity Multipixel Performance Report 4
RPC Barrel HV & LV system Lappeenranta University
News Reconstruction with Analyzer v 2.0 going on
2011/ 07/06 Jacqueline Yan IPBSM
Studies on TH2 chamber Michele, Maria, Givi, Joerg
TDCB status Jacopo Pinzino, Stefano Venditti
Chamber Design and Integration RE3/1 and RE4/1
SC of KM3 Vidyo meeting of Thursday, February 18
DT Infrastructure: LV, HV, Gas
NA61 PSD. Upgrade status. Institute for Nuclear Research RAS, Moscow.
“MUON” Collaboration meeting
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
Welcome to My Jumping Coin Experiment
Vienna Module Production
Han Jifeng BESIII MUON GROUP IHEP, CAS
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Status of the Crystal Ball
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
MEG DC HV supply preamplifier noise and DRS Input attenuation
RUN-4 has finished About 70 (!!!) billions of candidate tracks collected up to now About 20 (!!!) billions of candidate tracks collected in RUN-4.
CURRENT ANALYSIS, Fmax=150Hz
Hybrid & Module Testing Status
Pierluigi Paolucci & Giovanni Polese
Welcome back from holidays! …for a new year of exciting data taking
3E7_05151 wafer 11 IV curve Noise ~122e Source scans bad and
News from Technical Coordination
Wednesday 16th May 03:05 beam dump, RF fault crowbar problem on module M1B2 06:09 Another crowbar at injection. Access for RF; problem Beam Imminent Warning.
FNAL Hybrid Testing Status
Presentation transcript:

D. De Gruttola SALE-01: issues with HV supply fixed SALE-01: issues with HV supply fixed QA weekly meeting 26/04/2016

SALE-01 acquisition was stopped after replacement of freon bottle the issue was at that time ascribed to high temperature in the room after summer the problem was still there the main problem seemed to be with HV it was not possible to power on ch 2 and 3 (currents too high) a new power supply was installed (almost no difference) all the DC/DC converters were installed in another telescope and they shown to work correctly

HV issues few days ago ch 1 was ramped down  this is the current situation the main difficulty is the instability  each channel behaves in different ways at the same conditions..and it is not easy to understand what happens are the chambers problematic? They are more than 10 years old. can the problem be the DC/DC converters? status in February 2016

Acquisition with ~18 kV per chamber the rate is: some distributions in the next slides  2-5 Hz triple coincidences  ~260 Hz single (ch 2)  ~260 Hz single (ch 3)  25 kHz single (ch 1) status in February 2016

Distributions at ~4 Hz multiplicity peaked at 0 status in February 2016

SALE-01 this telescope never bubbled so well, so one possible explanation of the bad behavior was the presence of air inside the gaps the mixture flux was changed several times, but no improvement two chambers were declared bad and replacement was required before proceeding with the replacement a last attempt was done  open the chambers looking for possible damage in HV connectors  it was done last week  ch 2 was opened but no damage on HV cables was found  after closing the chamber the gas was flushed again  the situation immediately started to seem better

currents still high, but it was possible to ramp HV up acquisition was started (see next slide) Currents after chamber opening

Multiplicity ch 2 and 3 noisy (and distributions peaked at 0), but better situation wrt February February 2016 April 2016

Multiplicity ch 3 was not opened, but the gas chain was inverted (Input/Output)  the situation started to improve soon

DQM the rates were still very low, but physics quantities in DQM started to be acceptable! bad ok

Multiplicity  since few days the multiplicity is as expected

DQM all distributions are ok now usual rate

Multiplicity  some channels need to be cured (it will be done in the next days)

Conclusions the only reasonable explanation is the presence of air inside the gaps  chambers were not correctly flushed change the value of the flux does not help in this case  “shock” as inverting I/O in the chain or flushing air in the chamber seems to help SALE-01 (1 m distance between the chambers) back in acquisition SALE-02 will be soon assembled (50 cm distance between the chambers) proposal to decrease the distance between the chambers down to 50 cm in SALE-01 in order to increase the acceptance