1 Presented by : José F. Salt Cairols UAM (Madrid), 5 th and 6th June 2012 XIII Presential Meeting of the Spanish ATLAS TIER-2.

Slides:



Advertisements
Similar presentations
Nick Brook University of Bristol The LHC Experiments & Lattice EB News Brief overview of the expts  ATLAS  CMS  LHCb  Lattice.
Advertisements

Business Planning and Strategy Alignment Planning Process
ALICE Electronic Logbook MEST-CT Vasco Barroso PH/AID.
Ian Bird LHCC Referee meeting 23 rd September 2014.
WLCG Collaboration Workshop, “Gotham City”, May 2012 Introduction WLCG Collaboration Workshop, “Gotham City”, May 2012 Introduction.
Detailed Plans on Production Service Operations in Spain Andreu Pacheco (IFAE/PIC) GDB Meeting
Status of 2015 pledges 2016 requests RRB Report Concezio Bozzi INFN Ferrara LHCb NCB, November 3 rd 2014.
ATLAS in LHCC report from ATLAS –ATLAS Distributed Computing has been working at large scale Thanks to great efforts from shifters.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Ian Bird GDB; CERN, 8 th May 2013 March 6, 2013
11 November 2010 Natascha Hörmann Computing at HEPHY Evaluation 2010.
Future computing strategy Some considerations Ian Bird WLCG Overview Board CERN, 28 th September 2012.
Report of the Technical Subcommittee Mario Bergeron, Technical Subcommittee Chair/NGEC Vice Chair.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Magnoni Luca Early Stage Researcher WP5 - ATLAS.
Ian Bird Overview Board; CERN, 8 th March 2013 March 6, 2013
Distributed Physics Analysis Past, Present, and Future Kaushik De University of Texas at Arlington (ATLAS & D0 Collaborations) ICHEP’06, Moscow July 29,
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Response of the ATLAS Spanish Tier2 for.
WLCG Status Report Ian Bird Austrian Tier 2 Workshop 22 nd June, 2010.
1 Studies for setting up an Analysis Facility for ATLAS Data Analysis at CNRST and its application to Top Physics Acuerdo Bilateral CSIC-CNRST: 2007MA0057.
1 ATLAS-VALENCIA COORDINATION MEETING 9th May 2008 José SALT TIER2 Report 1.- Present Status of the ES-ATLAS-T2 2.- Computing-Analysis issues Overview.
Update on CHEP from the Computing Speaker Committee G. Carlino (INFN Napoli) on behalf of the CSC ICB, October
ATLAS Computing: Experience from first data processing and analysis Workshop TYL’10.
LHCbComputing Update of LHC experiments Computing & Software Models Selection of slides from last week’s GDB
HEPiX IPv6 Working Group David Kelsey (STFC-RAL) GridPP33 Ambleside 22 Aug 2014.
Hall D Computing Facilities Ian Bird 16 March 2001.
Operations Coordination Team Maria Girone, CERN IT-ES GDB, 11 July 2012.
LHC collisions rate: Hz New PHYSICS rate: Hz Event selection: 1 in 10,000,000,000,000 Signal/Noise: Raw Data volumes produced.
Presented by: Santiago González de la Hoz IFIC – Valencia (Spain) Experience running a distributed Tier-2 and an Analysis.
Ian Bird, CERN WLCG Project Leader Amsterdam, 24 th January 2012.
ATLAS – statements of interest (1) A degree of hierarchy between the different computing facilities, with distinct roles at each level –Event filter Online.
Evolution of storage and data management
CEPC software & computing study group report
Gene Oleynik, Head of Data Storage and Caching,
BENCH-CAN Internal evaluation 2nd semester
Status of WLCG FCPPL project
WLCG Workshop 2017 [Manchester] Operations Session Summary
Status: ATLAS Grid Computing
WLCG Tier-2 Asia Workshop TIFR, Mumbai 1-3 December 2006
WLCG Network Discussion
Ian Bird WLCG Workshop San Francisco, 8th October 2016
Regional SDGs Indicator Framework Development
LCG Service Challenge: Planning and Milestones
Virtualization and Clouds ATLAS position
Report from WLCG Workshop 2017: WLCG Network Requirements GDB - CERN 12th of July 2017
Grid site as a tool for data processing and data analysis
GCOS IP and Update on CEOS Response
ATLAS Distributed Analysis tests in the Spanish Cloud
Added value of new features of the ATLAS computing model and a shared Tier-2 and Tier-3 facilities from the community point of view Gabriel Amorós on behalf.
Data Challenge with the Grid in ATLAS
Western Analysis Facility
(UNSD introduction followed by open discussion)
LCG-France activities
Update on Plan for KISTI-GSDC
Status and Prospects of The LHC Experiments Computing
Dagmar Adamova, NPI AS CR Prague/Rez
CHAIN WP5 Meeting, Lyon 20 September 2011
Introduction to the Workshop
John Gordon, STFC GDB October 12th 2011
System performance and cost model working group
Cloud Computing R&D Proposal
Connecting the European Grid Infrastructure to Research Communities
The latest developments in preparations of the LHC community for the computing challenges of the High Luminosity LHC Dagmar Adamova (NPI AS CR Prague/Rez)
New strategies of the LHC experiments to meet
Input on Sustainability
US ATLAS Physics & Computing
Status and Plans of the Spanish ATLAS
ATLAS Distributed Analysis tests in the Spanish Cloud
A reflection on Enabling Connected Mobility
2003 Annual NSDL PI Survey A Collaborative Formative Evaluation
Report of the Technical Subcommittee
Presentation transcript:

1 Presented by : José F. Salt Cairols UAM (Madrid), 5 th and 6th June 2012 XIII Presential Meeting of the Spanish ATLAS TIER-2

2 Overview 1.- LHC Running conditions and LHC Computing GRID 2.- Resources pledges 3.- ES-ATLAS-T2 Reliability/Availability 4.- Present Project Issues 5.- Publications & Talks 6.- Conclusions and Perspectives

3 1.- LHC Running Conditions and the LHC Computing GRID –NOW: –LHC is running at 8 TeV –Pic : 5’5 4 x 10 ^33 cm -2 s -1 –Integrated Luminosity –Data taking evolving very well –Programme: – : Long Shutdown 1 (LS1) consolidate for 6’5/7 TeV – : 6’5/7 TeV –2018: LS2 to prepare for ‘ultimate LHC’ parameter set – : Physics with ‘Ultimate LHC’ –Comments: –WLCG New York –Evolution of the Tier-0 –New Tier-0 in Budapest

Timeline November 2011: –Last Presential meeting: XII workshop 15 th -16th November 2011 March 2012 –Final report of FPA2007 project sent –Annual report of FPA2010 project sent –Computing & Software Week (12-15 March) April 2012: –Pledges 2012 –21st Meeting of the LHC Computing RRB (24th April) May 2012 –CHEP2012 (NY) –WLCG Collaboration Meeting (NY) June 2012 –XIII Presential Meeting (5th-6th June, UAM) –Computing & Software Week (11-15 June) July 2012: September 2012 November/December 2012: Ibergrid 2012 (Lisbon) November 2012: – Spanish GRID Computing meeting to discuss about the new projects (to be fixed) – XIV Presential Meeting 4

WLCG Collaboration Meeting Finalisation of Technical Evolution (TEG) reports Exciting new development in ‘Feasibility Study on Common Analysis Framework 5

Pledges of 2012 have been met Pledges of 2013: new inputs froms CRSG (C-RRB, April 2012) Resource pledges

7 Evolution of ALL ATLAS T-2 including the pledged already delivered plus the Estimated resources since 2011 onwards (numbers are cumulative): Spanish ATLAS T-2 assuming a contribution of a 5% to the whole effort: Año CPU(HS 06) Disk (TB) Año CPU(HS06) Disk (TB) Present Project 2011: Pledges Met in April Pledges : Pledges Met !

8 Deployed Equipment (May 2012) Universidad Autónoma de Madrid (Madrid) Instituto de Física de Altas Energías (Barcelona) Instituto de Física Corpuscular (Valencia) –The Spanish ATLAS Tier-2 is integrated in the WLCG Project (Worldwide LHC Computing GRID) and follows the ATLAS Computing Model 50% 25% UAM IFAE IFICTIER-2 CPU (HS (3.325) (3.325) (6.650) ( ) Disk (TB) 432 (588) 775 (588) (1.176) (2.352) Details given at the MB Meeting of 14 February (collected by Gonzalo for the 3 experiments)

5 Tier-2 Operations Meting and cloud meeting every 2 weeks Review of the status of sites and cloud coordination Tier-2 Reliability has suffered some inestabilities 3.- ES-ATLAS-T2 Reliability/Availability Reliability/ Availability

Status in May

Present Project Issues a) Monte Carlo Production

12

13 PVSS (José del Peso’s talk) –SCADA System (Supervisory Control and Data Acquisition T2 are becoming more important in the Mesh Computing Model T2 directely (T2D) Adaptation plans: convergence of the different systems chosen in the sites Last news about Tier-2 connectivity To evaluate this tool in order to Decide its implementation in our T2 b) Implementation of an Expert System in the ES-ATLAS-T2 It seems to be good and we need to continue doing the effort c) Present Role of our Tier-2 d) Tier-2 Connectivity

14 M & O effort Class 3 shifts Coordination e) Involvement of ES-ATLAS-T2 in Core Computing Tasks To get more visibility in ATLAS Collaboration

Publications & Talks Developments and progress of the LHC GRID Computing obtained in the framework of the Tier-2 Project have been presented in different conferences, workshops, etc: –IS GRID de Taiwan. Presentación de Alvaro Fernández –CHEP2012: 3 posters The more relevant outcomes have been published in specialized reviews: Proceedings of conferences/workshops/ets Main objective: to publish in indexed reviews

‘ Harvest’ of FPA2007 project Scientific-technical publications: 9 Difusion of results:29 PhD thesis: 2 Other contributions: 8 Comments: 16 Very good publication rate Improvement in the ranking of the contributions….. But try to publish in scientific reviews with a higher impact factor

17 CHEP contributions (verificar) 1- The evolving role of Tier2s in ATLAS with the new computing and Data Model S. González de la Hoz 2.- ‘Model of shared ATLAS Tier-2 and Tier-3 facilities in EGI/gLite GRID Flavour’ S. González de la Hoz 3.- ‘ATLAS Tier-3 in IFIC-Valencia Analysis Facility’ Miguel Villaplana

18 We are doing reasonably well… … but we face many issues to be ‘up & running’, to maintain the commitments… –We loose experts: Carlos Borrego, Juanjo Pardo, Alex Lamas,… Problem : to maintain a good quality of service at the sites –Tier-2 are becoming more important in the new Computing Model –Challenging issues –More initiatives, visibility and influence are needed (in HEP community). For the next Presential Meeting (Barcelona ?) in November: –Santi will replace me as IFIC IP –To prepare the issues for the joint Spanish LHC Computing Grid meeting (with Paco del Aguila) 7.- Conclusiones & Perspectives (2012)

19 “New trends”: Cloud Computing & Virtualization: –Cloud Computing: In the last 3 years a considerable effort has been devoted in using the Cloud Computing in LHC framework –HELIX NEBULA GRID and Cloud computing can been seen as complementary in some way –Virtualization