ICAO-AFPP Quality Assurance for Instrument Flight Procedure Implementation. (Nairobi, Kenya, 3-6 Nov, 2015) By Chinyama, P. 1.

Slides:



Advertisements
Similar presentations
Presentation for the INCOSE Symposium 2011 Denver, CO USA1 Validation: Losing its Differentiation Jim Armstrong.
Advertisements

1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
1 Welcome Safety Regulatory Function Handbook April 2006.
Chapter 6 Sub-Group ICAO Headquarters, November 2013
ADQ Implementation Support Cell
Identifying the Achilles Heels of Instrument Flight Procedures International Flight Inspection Symposium Oklahoma City, OK USA June 2008 Ivan Ferencz CAA.
Software Quality Assurance Plan
Enhancing Data Quality of Distributive Trade Statistics Workshop for African countries on the Implementation of International Recommendations for Distributive.
Flight Validation and Pilot Training
APAC PBN Seminar F.LECAT (ICAO)
Module: 2 What is eTOD & Why is it so Important?
Objective ITY-ADQ ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
Presented to: Federal Architects By: Kim W. Barnette, Ph.D. Aeronautical Information Management Federal Aviation Administration Date: April 11, 2007 Federal.
International Civil Aviation Organization FAOSD Programme Administrative and Programme Participation Terms & Conditions Roles and Responsibilities.
4. Quality Management System (QMS)
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Understanding (and Untangling) Verification and Validation Requirements ISO 9001 vs. CMMI-Dev 1.2.
Introduction to ISO New and modified requirements.
Introduction to Software Quality Assurance (SQA)
Software Engineering Term Paper
ICAO Aerodrome Safety Workshop Almaty, Kazakhstan – 18 to 22 November 2002  AERODROME MANUAL.
Definitions, Goals and Objectives
Introduction to PBN Seminar ICAO PBN Implementation 1.
International Civil Aviation Organization and ISO/TC 211 ISO/TC 211 Seminar Berlin, 29 October 2003 ISO/TC 211 Seminar Berlin, 29 October 2003.
ICAO APIRG/17, Ouagadougou, Burkina Faso, 2-8 August 2010
ICAO Requirements on Certification of Aerodromes Module - 2
AIS AIM SG 8 Presented by: by: Charity Muthoni ICAO Headquarters: 4 th -8 th November Draft PANS-AIM Chapter 4 Sub group.
Exercise 1 Tor Stålhane IDI / NTNU. Intro The strength of ISO 9001 and many other standards is that they focus on “What shall be done” and leave “How.
LECTURE 4: ICAO CHART requirements
The global voice of ATM The Global Voice of ATM CANSO AIM WG Activities Agenda Item - 5: Global strategy/roadmap ICAO AIS-AIM SG3, Montreal, November.
At what level do I trust the outcomes of the model? Verification Calibration Validation Exploration of the model structure. the activity of adjusting the.
Briefer: John Charles Angermayer Briefer: John Charles AngermayerESC/GA Electronic Systems Center Hanscom AFB, MA Date: 5 Oct 2004 Date: 5 Oct 2004 Briefer:
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
Definitions, Goals and Objectives Embry-Riddle Aeronautical University Chapter 3.
Workshop on Accreditation of Bodies Certifying Medical Devices Kiev, November 2014.
Good Laboratory Practice
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision  Aeronautical Information Services Provider.
AIS-AIMSG/12 Briefing to ANC 23 October 2015
RATIFICATION OF THE 1991 FAL AMENDMENTS TO THE CONVENTION ON THE INTERNATIONAL MARITIME ORGANIZATION, 1948 A PRESENTATION TO THE PORTFOLIO COMMITTEE OF.
CANSO AIM WG Activities
PBN Performance Based Navigation
Product Validation Adapted from the NASA Systems Engineering Handbook for CSULB EE 400D by Alia Bonetti.
Допълнение 7 на PANS-ATM (ICAO Doc 4444)
African Flight Procedure Programme Assistance (AFPP)
(Nairobi, Kenya, 3-6 Nov, 2015) By Chinyama, P.
Draft PANS-AIM Chapter 4
Towards more flexibility in responding to users’ needs
WORKSHOP INTRODUCTION
Objective ITY-ADQ ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR
AERODROME MANUAL.
FAOSD Programme Administrative and Programme Participation Terms & Conditions Roles and Responsibilities.
Draft PANS-AIM Chapter 4 ICAO Headquarters: 4th-8th November
Regional Preparatory Workshop for the ITU WRC-2015
Chapter 6 Sub-Group ICAO Headquarters, November 2013
Workshop on preparations for ANConf/12 − ASBU methodology
Project Management.
Designing a Research Project
This teaching material has been made freely available by the KEMRI-Wellcome Trust (Kilifi, Kenya). You can freely download,
Workshop on preparations for ANConf/12 − ASBU methodology
Presented by Eduard Porosnicu, EUROCONTROL
Amendment 40 to ANNEX 15 Air Navigation Procedures for AIM Seminar
Emulsion Task Force Meeting
AIM Global Strategy Air Navigation Procedures for AIM Seminar
AIS Manual (Doc 8126) Air Navigation Procedures for AIM Seminar
WRC-15 Agenda Item 1.5 Fixed Satellite Service spectrum to support the safe operation of Unmanned Aircraft Systems Aeronautical Spectrum Workshop Preparation.
Management of Allegations Against Adults who work with Children Linda Evans (Head of Quality Assurance for Safeguarding) and Majella O’Hagan (Local Authority.
PANS-AIM (Doc 10066) Air Navigation Procedures for AIM Seminar
23 May 2012 AIS-AIM SG #6.
1 Ranjan Senaratne. After studying this session, you will be able to: Explain the responsibilities of the AIS. Identify the users of Aeronautical Information.
Aerodrome Certification Workshop
Presentation transcript:

ICAO-AFPP Quality Assurance for Instrument Flight Procedure Implementation. (Nairobi, Kenya, 3-6 Nov, 2015) By Chinyama, P. 1

COLLECTION AND VALIDATION OF DATA FOR PROCEDURE DESIGNING: References: 1.Doc 9906, VOL 1. 2.Doc 9674, WGS84 3.Annex 15 and 4.Annex 11 2

OBJECTIVES: General:  Share practical experience on how to collect and validate the data required for procedure design. 3

Outline: Introduction, Categories of Data/information for procedure design(PD), Collection of procedure design DATA/Information, Validation of data for accuracy, resolution and integrity. 4

INTRODUCTION: Major key essentials for procedure designing 1.The use of appropriate design criteria together with 2.data/information which meet the quality requirements. “ Quality requirements are addressed in-terms of Accuracy, resolution and the integrity of the data ” 5

Definitions:  ACCURACY: A degree of conformance between the estimated or measured value and the true value.  INTEGRITY: A degree of assurance that an aeronautical data and its value has not been lost or altered since the data origination or authorized amendments.  VALIDATION: Confirmation, through the provision of objective evidence, that the requirements for a specific intended use or application have been fulfilled.  VERIFICATION: Confirmation, through the provision of objective evidence, that specified requirements have been fulfilled. 6

CATEGORIES OF PD DATA: ATS STACKHOLDERS REQUIREMENTS AERODROME DATA TERRAIN AND OBSTACLE DATA AERONAUTICAL AND NAV-AIDS DATA 7

PROCEDURE DESIGN DATA: ATC USERS (OPERATORS) AIRSPACE DESIGN- CONSTRAINTS ENVIRONMENT CONSTRAINTS OTHER DEEMED NECESSARY ATS REQUIREMENTS From AIP- ARP, THR e.tc. MET- Weather statistics Magnetic variation and rate of change AERONDROME DATA 8

PROCEDURE DESIGN DATA: Airspace structure/classification Airways/routes, Transition altitudes/Flight level Other Flight procedures NAV-AIDS Coordinates, elevation frequency, coverage e.t.c. AERONAUTICAL and NAV-AIDS DATA Terrain: DTM or Paper cartographic maps Obstacle: Man- made and natural TERRAIN AND OBSTACLE DATA 9

COLLECTION OF PD DATA:  Should be collected from recognized sources  Positional data must be in WGS84,  All aeronautical data must meet the minimum quality requirements.  It is also important to know when the data were originated. 10

Obstacle survey (Tanzania): SETUP OF PANS-OPS SECTION:  TCAA Flight Procedure Design Unit  It is in ANS-ATM section  Works in Close coordination/ collaboration with AIS/AIM (Cartography-AIM - responsible unit for obstacle survey)  Expected stand alone Section (Designer and Cartographers)  TCAA Procedure design Facilities  GeoTITAN Software for designing,  Global mapper for processing/analysing DTM  ArcGIS for Charting, 11

Obstacle Survey (Tanzania): Under AIS/AIM section, Survey is Conducted by private companies, TOR is provided to the surveyor with detailed data quality requirements in accordance with TCAA order (TCAA/QSP/SR/O/AGA-03) derived from afore- mentioned DOCs. Procedure designers must participate during survey, Coordinates in WGS 84. If there is a need, Verification is done by Cartographers (Procedure designers are involved). 12

Aeronautical data quality requirements: 13

Aeronautical data quality requirements: Latitude and longitudes Conts: 14

Aeronautical data quality requirements: 15

Aeronautical data quality requirements: Elevation/altitude/heights conts: 16

Data verification: No need for an additional Data verification if they meet quality requirements, Verification is required when the Data quality requirements is unknown or below the stated requirements based on the procedure to be designed. Data validated when they fulfill the requirements for the intended use. 17

Data verification: Methods:  Analyze the data against other trusted data,  After procedure designing we use a certain tool to overlay a procedure over the google earth (Tanzania).  Flight validation/check. Mitigation:  Additional of appropriate buffers,  Determination of negligible effects on the procedure. 18

Importance of quality characteristics of the DATA in procedure design: Helps to ensure proper horizontal and vertical safety margins required by procedure design criteria. E.g. The declared vertical accuracy of data must be included in the MOC. 19

THANKS FOR YOUR ATTENTION 20