BP/ARCO GeoTracker User Experiences California CUPA Form February 2002.

Slides:



Advertisements
Similar presentations
NetDMR Electronic DMR Reporting
Advertisements

Spatial Analysis in Government Lecture 4- LAMA System By Guy Thigpen, M.Phil., MUSA.
CS 551 People, Process, Product and Project. Tailored OO Application Software Reusable Software Vendor Software User Programs Client Personal Computer.
July Interface Monthly Meeting Sunflower Project Statewide Management and Reporting Tool Update July 14, 2009.
California Integrated Water Quality System (CIWQS) and Electronic Self Monitoring Reports (eSMR) Presentation to California Dischargers.
Static VS Dynamic websites. 1-What are the advantages and disadvantages? 2- Which one should you choose and why?
Section 13.1 Add a hit counter to a Web page Identify the limitations of hit counters Describe the information gathered by tracking systems Create a guest.
4th Annual CALIFORNIA CUPA CONFERENCE February 4-8, 2002 Santa Clara, California 4th Annual CALIFORNIA CUPA CONFERENCE February 4-8, 2002 Santa Clara,
SWIS Digital Inspections Project (SWIS DIP) Chris Allen, Information Management Branch California Integrated Waste Management Board November 5, 2008 The.
Implementing an Automated ACCUPLACER Score Upload System for the i3 Platform A Cooperative Effort by Testing Staff, Other Student Services Areas, and IT.
November 27, 2007Pebble Project Agency Meetings Pebble Project Data Management Data Management Responsibilities Ensure complete and accurate field and.
Ole Miss Today An integrated, campus-wide announcement system.
Nevada County Human Services Agency Web-Based Community Resource Directory.
Adem.alabama.gov Electronic Drinking Water Reports (eDWR) AWWA Alabama-Mississippi Section ADEM Regulation Update February 26, 2014 George Cox (334)
A typical issue for a business… How do I find this information?
Karen Herter (HMG) Mike Langley (DGS) April 15, 2008 Portfolio Manager for California State Buildings Meeting the Requirements of Executive Order S
California Integrated Water Quality System (CIWQS) and Electronic Self Monitoring Reports (eSMR)
Presented by Chris Allen Unified Program Technology Services Manager October 12, 2010
6 th Annual Focus Users’ Conference 6 th Annual Focus Users’ Conference Import Testing Data Presented by: Adrian Ruiz Presented by: Adrian Ruiz.
AB2886 Electronic Reporting Los Angeles Training July 16, 2001 Anne M. Happel, Ph.D. EcoInteractive, Inc California Underground.
Human Centric Computing (COMP106) Assignment 2 PROPOSAL 23.
The Business Source Databases Basic Searching Tutorial support.ebsco.com.
November 17, 2008Pebble Project Agency Meetings Pebble Project Data Management Data Management Responsibilities Ensure complete and accurate field and.
09/12/2003CCAQS Data Management System1 Central California Air Quality Studies Data Management System Status Report to the Study Agency Policy Committee.
Internet Advancement Ore-Ida Council Boy Scouts of America.
Introduction to KE EMu Unit objectives: Introduction to Windows Use the keyboard and mouse Use the desktop Open, move and resize a.
SunGuide SM Software Development Project End of the Year ITS Working Group Meeting December 7, 2005.
Electronic Submission Of Laboratory Data And Sample Information For UST Reports STL - Sacramento, September 20, 2001 Michael W. Gjerde Division of Clean.
Electronic Submission Of Laboratory Data And Sample Information For UST Reports Caltrans - September 26, 2001 Michael W. Gjerde Division of Clean Water.
Payer User Group Webinar – 7/31/2014. Agenda Welcome (5 minutes) ◦Opening Comments/ Review ◦Meeting Goals Chapter 243 Changes (25 minutes) ◦Clarification.
SWRCBSWRCBSWRCBSWRCB AB2886 Implementation Sacramento Training Sacramento Training August 13 & 14, 2001 Marilyn R. Arsenault ArsenaultLegg, Inc.
SWRCBSWRCBSWRCBSWRCB AB2886 Implementation San Jose Training San Jose Training July 30, 2001 Marilyn R. Arsenault ArsenaultLegg, Inc.
ELECTRONIC SUBMISSION OF LABORATORY DATA FOR UST REPORTS Michael W. Gjerde Division of Clean Water Programs
ELECTRONIC SUBMISSION OF LABORATORY DATA AND SAMPLE INFORMATION FOR UST REPORTS September 6, 2001 Michael W. Gjerde Division of Clean Water Programs, SWRCB.
MTA ETA. Product Description A real-time simulation system that estimates the expected time that it will take a certain bus to arrive at an end- user’s.
The Business Source Databases Basic Searching
Standard Operating Procedure
Elsevier Operative Techniques - Netter Process Flow
Immigration – Common Errors and How To Conduct An Internal I-9 Audit
Homework 1 Hints.
Making your web site accessible a11yoz.com/maximise
TCP LIMS - Introduction
Overview – SOE PatchTT November 2015.
Transition from Classic Interface Phoenix Interface to
VP PIE Planning & Resources
North Carolina’s Transition to CMDP
Division of Air AirCom DARM’s New Compliance and Enforcement Database and Field Inspection Tool.
Introduction to the New SSA OnePoint Online Website
CEOS Information Systems Survey
Facility Owners/Operators
How to complete the Searchable fields on Connected Educational Agents
Admin and MTN you need your password to login, this is how to get it…
Adding and Editing Users
Eurostat internet tools Point 17: DWG 15-16th April 2010
CMDP: NC Experience.
JavaScript Form Validation
Welcome Traceability Software Integrators
Broadvine Support Portal
DQ2 & State Reporting Updates
Chapter 8 Software Evolution.
Computer Science The 6 Programming Steps.
Overview. Overview User Profile & FAQs Summary Tab Break down of user clicks   Account Director contact information   Analysis of data accuracy,
Workflows at Austin Water Labs
WSP-ATR Submission Process 2019.
Adding a Category (Categories are the second level of your organization’s offerings hierarchy: Program > Category > Class > Session) 1.) A Category can.
Survey Results Respondents: 39 of 51 – 76%
The Business Source Databases Basic Searching
Tdw12 – user feedback survey
The Business Source Databases Basic Searching
Presentation transcript:

BP/ARCO GeoTracker User Experiences California CUPA Form February 2002

View/Add Facilities Screen

View Associated Facilities

Results of Search Associated Facilities

Example: Two Users Claim Same Site

Results of View Submittals

Effort Required >BP’s Time to claim site and release to consultant >Consultant’s time to claim sites and enter data ongoing basis >Labs time and effort to generate EDF >BP’s time to have wells resurveyed

BP’s Effort >Finding sites in GeoTracker >Many don’t list ARCO Facility Number >Can’t search by Facility Number >Sites W/wrong or different address >Sites with different name >Sites with different city >Sites missing in GeoTracker >Non-ARCO consultants claiming ARCO Sites

Consultant Effort >Find site in GeoTracker >Claim site >Upload field points >Check Laboratory EDF and upload >Check and upload survey data >Upload site maps and field data >Averaging 1 to 2 hours per submittal to find, claim, review and upload EDFs

Laboratory EDF >BP/ARCO Primary Labs: Sequoia, Del Mar, Pace, and STL >These labs all are providing EDF >Had problems with complex COELT format >Difficulties with evolving valid value list >Now moving from “Startup” to Production mode for EDF submittals

Laboratory Effort >Some Laboratories have added staff to process the volume of EDFs >Due to the dynamic nature of the process, labs find it hard to fully automate generating EDFs

BP/ARCO XYZ Data >BP/ARCO conducted new horizontal surveys to be compliant with AB2886 >New X-Y surveys completed December 2001 and are being uploaded by the site consultants >BP/ARCO is using existing Z data which is being uploaded by the site consultants >BP/ARCO offered to help the State Water Resources Control Board test the XYZ upload feature

LUST vs UST >LUST database is dynamic >UST database is static >Found plotting problems in both databases >Many sites and wells not plotted in correct location, especially in UST database >Suggest there be a section in the GeoTracker FAQ that discusses the difference in quality of LUST vs UST data

Suggested Improvements >Add a way to search for sites by Agency >Add a way to search on additional data entered in “Field Point Name” file >Provide feed back that sites not found in GeoTracker have been added so users can claim them

Summary >For the first several months the GeoTracker user interface was constantly updated as many “bugs” were being fixed >ARCO’s consultants now fluent in the GeoTracker process >All of BP/ARCO’s labs can produce EDF >Labs moving to a “production” mode for EDF from a startup mode but have a ways to go >GeoTracker is still an evolving system