Naming conventions Sub-committee Meeting.

Slides:



Advertisements
Similar presentations
FOTO 24/11/2011 PS FWS RELIABILITY 1 IMPROVING THE PS FWS RELIABILITY.
Advertisements

02/06/20141 WHAT ITEM IS COMPOSED OF ? INTEGRATION MODEL DETAIL MODEL SKELETON 3D ENVELOP PART 1 PART 2 PART XXX… EQUIPMENT ITEM INTEGRATION OFFICE RESPONSIBILITY.
Zornitsa Zaharieva BE-CO-DA, CERN 15 November 2013 Asset and Maintenance Management Workshop November 2013.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
Graphic Materials and Techniques
By Danella Aguayo. DEFINITION SKETCH noun 1. A simply or hastily executed drawing or painting, especially a preliminary one, giving the essential features.
Loss maps of RHIC Guillaume Robert-Demolaize, BNL CERN-GSI Meeting on Collective Effects, 2-3 October 2007 Beam losses, halo generation, and Collimation.
Production Cycle Objectives:  Identifying key phases for building up website  Understanding the major goals and activities of each production process,
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
07-JUL-2003LEADE / JW1 Satellite bunches in the LHC Satellite “definition” Satellite luminosity Satellite detection & tolerances J. Wenninger AB/OP.
Subcommittee 3D DATA SETS FOR LIBRARIES. SC 3D Experience report for implementing IEC – Conventions and guidelines Cape Town, (Cape.
B eam-line O perational S pares S trategy BI equipment status. 27/05/2014 Javier SIMÓN1.
Margarita Saifoulina BE/RF/SR. Outline Data Management EDMS & MTF for RF structures Future prospects for EDMS/MTF solution Data Management EDMS & MTF.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
MTF - Travellers 28/2/2001 S. Mallon + P. Martel EDMS Doc Id Contents Problem and scope Timing of MTF usage Definition of a standard MTF Creation.
Unconditionally Secure Chaffing-and-Winnowing for Multiple Use Wataru Kitada 1, Goichiro Hanaoka 2, Kanta Matsuura 1, Hideki Imai 2 1. IIS, the University.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
Chapter 3 Class Diagrams. 2 Outline Class Basics Class Basics Classes Classes Association Association Multiplicity Multiplicity Inheritance Inheritance.
G. Ferioli, R. Jung - LHC-BI Review Workshop November 19&20 LHC Screen Profile Monitors G. Ferioli, R. Jung Introduction BTV LHC layout Monitor set-up.
Application of a CAMMS to CERN’s cryogenic installation park G. Perinić and S. Knoops, CERN.
Types of Drawing. Introduction One of the best ways to communicate one's ideas is through some form of picture or drawing. This is especially true for.
Group : Lê Minh Hi ế u Phan Th ị Thanh Th ả o Ph ạ m Hoàng Long Nguy ễ n Huy Hùng 1 BIG DATA – NoSQL Topic 1.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
European Organization For Nuclear Research PS2 Naming Conventions: the Options Ronny Billen 15 June 2009 Accelerators and Beams Department Controls Group.
Review of the processes released in the framework of the MMP Goran Perinić.
ELENA Documentation and Data Management Items, Assets, Functional Positions T. Birtwistle EN-ACE-CL With input from T. Krastev EN-ACE-EDM.
TE-ABT Naming Issues R. Noulibos EDMS Doc. 13/01/ Part I: Current Situation a) Overview of TE-ABT Systems & equipment b) Naming conventions used.
STATIC AND MODAL BEHAVIOUR OF THE CLIC MAIN BEAM BPM SUPPORT M. Esposito, EN-MME The research leading to these results has received funding from the European.
Storage Areas 865, 879, 954 and 955 G. Schneider J. Simon N. Sharmazanashvili G. Schneider BE-BI BI Beamline Operational Spares Strategy 2 (BOSS.
1 Quality Assurance Working Group Membership and functioning described in the document LHC-PM-QA "Quality Assurance Policy and Project Organization”.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
GIF++ The new Gamma Irradiation Facility at CERN Physics Department Detector Technology Group 22/08/12 Project #5R. Fortin PH-DT-DI1 Status of procurement:
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
ELENA Layout Naming Convention F. Butin / ELENA collaboration.
Cold mass procurement, status and plan, QA-QC H. Prin With contribution from S. Becle, O. Housiaux, R. Principe, J.-L. Rudeiros Fernandez, F. Savary 3.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Project Codes/Coding Pierre Bonnal Project Codes/Coding — P. Bonnal2 Three to tango Agenda “as-is” “should-be” “to-be”
Informative Writing. Informative = Expository An informative essay, also known as an expository essay, gives the reader detailed information about a specific.
LHC Collimation Working Group Monday, 21 March 2016 Analysis of collimator BPMs in the 2015 run A.Valloni, G. Valentino with input from R. Bruce, A. Mereghetti,
LBNF CAD models, Drawings and Component list
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
Wire Scanner / A.Demougeot
Naming convention and layout database for the East Area
The HL-LHC Circuits: Global View and Open Questions
Radio Frequency Identification (RFID)
Configuration Management and Layout Database ELENA Project
Layout Drawings and Mechanical Assembly Drawings
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
The MTF adjusted system to meet Vacuum Group needs
the challenges in study skills 2
AMMS-WG BE-BI and PPE 9/12/2018.
Project Title Present information clearly Draw the eye
The 11T cryo-assembly: summary of design and integration aspects
CNGS Proton Beam: Introduction
Project Title Present information clearly Draw the eye
11/14/2018 Innovation Cup.
Chemical Process Diagrams
دانشگاه شهیدرجایی تهران
تعهدات مشتری در کنوانسیون بیع بین المللی
2/5/2019 Innovation Cup.
Parabolas Objective: Be able to identify the vertex, focus and directrix of a parabola and create an equation for a parabola. Thinking Skill: Explicitly.
Status of energy deposition studies IR7
E. Manola-Poggioli 05 December 2001 EDMS doc
Installation of New Officers
University of Warith AL-Anbiya’a
Title of Presentation (your names).
METHOD OF SECTIONS & INTRODUCTION TO MACHINE DRAWING
Dependency Inversion principle
University of Warith AL-Anbiya’a
Assembly drawings Flóra Hajdu B406
Presentation transcript:

Naming conventions Sub-committee Meeting. 27/05/2014 Naming conventions Sub-committee Meeting. Equipment codes and functional positions. Javier SIMÓN

Contents The initial problem. The idea. Quality assurance definition. 27/05/2014 Contents The initial problem. The idea. Quality assurance definition. Advantages splitting type/function. LHC layout examples. Conclusion. Javier SIMÓN

27/05/2014 The initial problem. Great amount of supports with functional position difficult to distinguish from his general assembly. Javier SIMÓN

27/05/2014 The initial problem. Cheeking the types we se that the LHC LDB contains a big amount of parts. Changes from what we have seen in PSX, SPS. Javier SIMÓN

27/05/2014 The idea. Could be possible to name all BPM positions as HBPM, keeping the same instrument type code as shown in the drawings? Not foreseen in the LHC naming conventions. Javier SIMÓN

Quality Assurance Definition 27/05/2014 Quality Assurance Definition PS complex BPUNO <> PR.BPM80 LHC-PM-QA-204 rev 3.2 BQKV <> BQKV.6L4.B1 Javier SIMÓN

Quality Assurance Definition 27/05/2014 Quality Assurance Definition EQUIPMENT CODE The abbreviated name denoting a type of collider component is called an equipment code and is made of up to five letters. The equipment code is also a part of the identifier used for manufactured physical components Javier SIMÓN

Quality Assurance Definition 27/05/2014 Quality Assurance Definition Javier SIMÓN

Quality Assurance Definition 27/05/2014 Quality Assurance Definition Only LHCBQKH drawings has ben draw and manufactured, but they have an horizontal and vertical function depending of the installation. Javier SIMÓN

Quality Assurance Definition 27/05/2014 Quality Assurance Definition MTF HCBQKV_001-CR000005 MTF HCBQKH_001-CR000001 Only BQKH_0015 exist Javier SIMÓN

Advantages Type BQKAA. Functional position BQKH or BQKV. 27/05/2014 Advantages Type BQKAA. Al the elements share the same equipment, from manufacturing to spare management. We need les codes to be created. Asset is not “condemned” to a function. Functional position BQKH or BQKV. Operation can distinguish the function, and we know how to install each position. Javier SIMÓN

27/05/2014 Warm BPM examples. BPMWA BPMWB BPMWC BPTX Javier SIMÓN

27/05/2014 Warm BPM examples. BPMWC.6R3.B1 BPMWC.6R3.B2 Javier SIMÓN

Warm BPM examples. BPMWC.6R3 > Super-assembly (LBPM) 27/05/2014 Warm BPM examples. BPMWC.6R3 > Super-assembly (LBPM) BPMWA.6R3.B1 > Pickup (BPM) BPMWA.6R3.B2 > Pickup (BPM) BPMHW.6R3 > Support (HBPM) Javier SIMÓN

BPM collimator example 27/05/2014 BPM collimator example We can consider the BPT code as merely functional, there is no drawing or equipment with this name. Type Type Description Functional Position BPTDH Embedded Downstream BPM in a Horizontal Collimator BPTDH.A4L1.B1 BPTDV Embedded Downstream BPM in a Vertical Collimator BPTDV.A4L1.B1 BPTUH Embedded Upstream BPM in a Horizontal Collimator BPTUH.A4L1.B1 BPTUV Embedded Upstream BPM in a Vertical Collimator BPTUV.A4L1.B1 Javier SIMÓN

Conclusion. Present naming convention can maybe be to restrictive. 27/05/2014 Conclusion. Present naming convention can maybe be to restrictive. Manufacturing , operation and Layout can have different requirements for the code that maybe don’t feet in just 5 characters. The type and function is already splitting in some cases. Javier SIMÓN

END Thanks for your attention. ¿Questions? ATA codes talk proposal. 27/05/2014 Thanks for your attention. ¿Questions? ATA codes talk proposal. END Javier SIMÓN