The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Dec 9, 2013.

Slides:



Advertisements
Similar presentations
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 6, 2012.
Advertisements

Measuring Cosmic Ray Flux with a trigger and CAMAC readout - Page 1 Connect the Fluke 415 HV supply output to the input of the voltage distribution box.
LI Gain Curves Peter Litchfield Calibration Workshop, 6 th September 2005  Beginning to understand the LI system  Beginning to understand the software.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Feb, 13, 2008.
Far Detector Data Quality Andy Blake Cambridge University.
The Design of MINER  A Howard Budd University of Rochester August, 2004.
MICE Tracker Readout Increased Data Readout Rate VLSB Development 16 AFE II t boards 8 Visible Light Photon Counter (VLPC) cassettes 4 cryostats.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 20, 2011.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Nov
MUID Status: General Detector Health In addition to two disabled HV chains there are four other chains (out of a total of 600) that are largely or totally.
ACORDE REPORT Pedro Podesta UAS Mexico. Geometry ( No changes) Alignment (No changes) QA (No changes ) Shuttle (In progress) To do Outline.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
Satoshi Mihara ICEPP, Univ. of Tokyo Feb MEG Review Meeting 1 CEX beam test at piE1 Satoshi Mihara.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
Analysis of Endstation A setup Josef Uher. Quartz bar Start counter.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
The Design and Performance of the MINER A Detector Howard Budd, University of Rochester Technology and Instrumentation in Particle Physics 2011.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep 26, 2011.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 17, 2011.
DAQ Status for cosmic-ray test in RAL Hideyuki Sakamoto MICE Phone meeting 12 th July 2007 Contents Status Setup for cosmic-ray test bench Schedule.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Ckov status David Lange, Doug Wright LLNL May 4, 2004.
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
MINER A Operations Report All Experimenters’ Meeting Steve Hahn, FNAL July 1, 2013.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Xenon Detector Installation schedule Satoshi MIHARA.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Development of a pad interpolation algorithm using charge-sharing.
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jan 25, 2016.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar 30, 2015.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 24, 2014.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
Proposal for the after-pulse effect suppression  Observation of pulses and after-pulses  Shape measurement  Algorithm  Results  Efficiencies for after-pulse.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 8, 2016.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
The PSD at Pb-Pb run PSD drawbacks at Ar beam
Tracker TriP-t Test Stand
Jean-Sebastien Graulich, Geneva
Weekly PDL report (Jul 7-14)
Test Stand Status and Plans
Calorimeter Upgrade Meeting - News
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
Preparation of the CLAS12 First Experiment Status and Time-Line
Test for PMT afterpulse with He Gas Flowing
Времяпролетный детектор PANDA


BCM-BIS Interface Szandra Kövecses
C.F. Feb
C.F. Feb
B904 Status Report by Fred B.
Presentation transcript:

The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Dec 9, 2013

Taking Data We are taking data with very small downtimes –For some runs we take a LI trigger just after a beam trigger. –We are having instances where one or both of the 2 light injection (LI) boxes are not working. We are not sure what is going on. We continue to take beam data whether the LI box is working or not. –We are increasing the number of beam-LI runs to 2

3 Data % live time Nov 28 –Dec 4

West Platform Work for the shutdown –The 3d flooring piece for the platform was tied down –The chain guard for a gate was installed –The 3d railing was installed The platform is ready for use Using the west platform we replaced the FEB which had high PEDs ave in ½ the low channels. (The PED ave > 2000 for this FEB, & nominal PED ~

PMT with HV varying problem PMT with has the “High Voltage Varying Problem”. –A Cockcroft-Walton generator puts the HV on the tube –The HV varies around its set value. Not sure why, we speculate is there is a connection issue On Dec 2 we replaced the FEB, which didn’t help, but sometimes it does On Dec 4 we replaced the PMT which fixed the problem 5

FEB Firmware Upgrade The FEBs can store 7 hits for a channel in a gate. –In fact what actually happens if one channel has a hit above threshold, it causes 32 channel ( ½ PMT) to store their ADC and TDC values. These 32 channels can store their values in a beam gate 7 times. This limit will need to increase as the beam intensity increases. –A new FEB firmware is being created which increases the number of times these 32 channels can store their data from 7 times to 23 times. –The FEB firmware is written –We have a test setup on the 14 floor which can generate as many light pulses as are needed to test the new firmware. –The firmware has been tested and some issues are being corrected. –Worked on by Cristian Gingu & Paul Rubinov (PPD EED). It will be ready after the 1 st of the year 6

CROC-E Firmware To Check CRC word CROC-E firmware upgrade which checks the CRC word –Goal: The CRC word (cyclic redundancy check) for all the frames will be passed to the offline to check that there is no problem with the data. The firmware has been written by Cristian Gingu. We have tested this firmware on 1 CROC-E in the 14 th floor test stand, and the firmware seems to work. We will be testing this on a larger hardware setup on the 14 th floor. Firmware should be ready after the 1 st of the year –The CROC-Es need to be brought to the 14 th floor to implement this change. 7

Event Display 8 Nuclear target quasi-elastic event X viewU view V view X view

NuMI Beam Plots 9

Protons for the Week 10 xx 0.370×10 19 POT Dec 2-8

FY2014 Protons 11 xx 5.27×10 19 POT Oct 1- Dec 8

Protons for ME Run ×10 19 POT Sep at 15:00 – Dec 8