November 17, 2014 ERCOT AMS Data Loading Result Code Descriptions & Distribution AMS Workshop IV.

Slides:



Advertisements
Similar presentations
May 24, 2011 PUC Project AMIT Stakeholder Steering Committee Anna Grau
Advertisements

Retail Market Subcommittee Update to TAC February 5, 2004.
9/13/2007 Nodal COMS Extracts & Reports Market Requirements Review SDAWG Jackie Ashbaugh ERCOT ***NOTE: All information contained in this presentation.
1.  An inadvertent issue begins upon the discovery of an Inadvertent Gain or Move-In transaction submission. Upon identification of an Inadvertent Gain.
October 28, 2014 Update to RMS 1. * Reviewed and Discussed: * ERCOT Protocols and Retail Market Guide Requirements * TDSPs’ Data Processes for IDR vs.
MarkeTrak Update Retail Market Subcommittee December 6, 2006 Adam Martinez & Karen Farley.
MarkeTrak Enhancements Conceptual Design Review Presented By ERCOT.
1 AMS Data Workshop ERCOT Overview of AMS Data Processes June 27, 2014 ERCOT June 27, 2014.
PR Phase II SCR 727 SCR 740 Web Services Jackie Ashbaugh Commercial Operations Data Integrity & Administration August 18, 2006.
LPGRR044 Distributed Generation (DG) Profile Segment Implementation Plan.
Price Responsive Load / Retail DR Update to RMS Karen Farley June 3, 2014.
SCR 740 Implementation of Web Services for ESIID level data Jackie Ashbaugh EAA Data Management.
1 Market Data Transparency SCR 740 Business Training SCR 727 Phase II: Web Services ERCOT presents:
1 RMS Update - ERCOT June 10, Supporting Reports Section.
MARS Taskforce COPS Update May 12, Execution MilestonesBaseline DateStatus Technical Architecture Complete 05/15/2009On Schedule Development Complete07/24/2009On.
LRS Update Meeting LRS Participants and Profiling Working Group October 27, 2005.
March 25, 2015 TDSP AMSR Cycle Read Analysis AMWG Meeting.
1 PWG Update Report By Ed Echols Of Oncor ERCOT PWG Chair Jim Lee of Direct Energy ERCOT PWG Vice Chair for COPS Meeting Sept 10, 2014.
ERCOT strictly prohibits Market Participants and their employees who are participating in ERCOT activities from using their participation in ERCOT activities.
1 ESI ID SERVICE HISTORY AND USAGE DATA EXTRACT SYSTEM CHANGE REQUEST (SCR 727) February 24, 2003.
1 RMS Update - ERCOT May 14, Supporting Reports Section.
October 14, 2015 LRIS v2 / Self-scheduled Third party DR Provider Data Submission Proposal Carl L Raish.
October 9, 2012 Commercial Operations Subcommittee RMS Update Kathy Scott RMS Vice Chair.
Load Profiling Working Group RMS Presentation 8/01/2002 by Ernie Podraza Reliant Energy Retail Group Chair PWG.
Rob Connell May 29, 2002 Retail Sub-Committee Update.
MARS 867_03F ROR vs. Settlement vs. 810 Scenarios ERCOT September 2008.
RMS/COPS Workshop VI 1 October 06, Antitrust Admonition ERCOT strictly prohibits Market Participants and their employees who are participating in.
MARS Advanced Metering – ERCOT Market Facing Changes Jackie Ashbaugh Manager Data Integrity and Administration 3/9/2009.
MARS Taskforce RMS Update November 10, Conference Call concerning Settlement Estimates TDSPs held a conference call on October 28, 2010, where we:
Tuesday, October 6, 2015 (following RMS) COPS-RMS-WORKSHOPShttp://
01/17/ CP Discussion October 16,2002 Retail Market Subcommittee Austin, Texas.
1 Transaction or Issue Clean Up. 2 Customer Protection and 814_08 Issue (Phase 2 – Potentially Late 08s) Background Completed Items Next Steps.
Distributed Renewable Generation Profile Implementation Plan.
TX SET Update to RMS Wednesday, November 7, 2007.
MARS Taskforce COPS Update August 10, Definitions AMC – AMS (IDR) meter type settled using the 15-Minute LSE data received from TDSP AMDG – 15 Minute.
Mail Entry & Payment Technology 1 Release 40 Updates MTAC User Group 1 Thursday, January 15, 2015.
1DRAFT for DISCUSSION Transition From Non-IDR to IDR Load Profile and LSE 15-minute Data for AMS Market Advanced Readings and Settlements Taskforce 10/9/09.
AEP ONCOR TNMP TDSP AMS Data Practices Summary TDSP_AMS Data Practices Summary.ppt CenterPoint.
February 2, 2016 RMS Meeting 1. * Reasons: * Per the ERCOT Board Report dated 8/5/14 there were 6.6M Advanced Metering System (AMS) Electric Service Identifiers.
MIMO Stacking Document and the current RMG are inconsistent with current logic and should be updated.
Proposed Timeline for Extract, Variances, True-Ups Extracts 10/1/03 Clear all “old” extracts from Portal 9/26/03 Post last “old” daily extract 10/6/03.
1. ERCOT strictly prohibits Market Participants and their employees who are participating in ERCOT activities from using their participation in ERCOT.
Oil and Gas Profile Implementation Plan. 2 BUSOGFLT Background ERCOT received Oil and Gas Profile Segment request ERCOT completed.
RMGRR058 Overview RMS Meeting – August 15, Background / Reference PUCT Substantive Rule 25.43(n)(8) Protocol Customer Billing Contact.
1 Customer Objections in Complete Status (CCO Clean-up Phase 3) Background Next Steps.
Summary of the November 11, 2002 Market Synchronization “How-to-Fix” Decisions For presentation to RMS November 14, 2002.
Mass Transition—Timelines & Volume Limitation RMGRR116—Acquisition Transfer Non-standard Metering Future Meetings 1.
MarkeTrak Issue Resolution Tool Retail Market Participant Workshop.
April 9, 2010 Meter Working Group EPS Meter Design Proposal And Generation Site Modeling & Mapping Joseph Bezzam Meter Engineer II.
1.  What is the purpose of DEVs? Data Extract Variances (DEVs) are used to synchronize the data among all Market Participants (MP)  What is a DEV? It's.
Customer Proprietary Information RMS Presentation November 13, 2003.
Module 6 ********* Data Loading Workforce Information Database Training Last update November 2006.
December 16, Annual Validation Completed for 2013 PWG COPS update 12/16/13 Date Residential Annual Validation Task ListStatus 07/19/2013 ERCOT.
January 17, 2007 Texas Test Plan Team Meeting Lessons Learned Flight 1006.
MARS Taskforce RMS Update October 13, 2010.
C++ / G4MICE Course Session 4 Create a complete C++ class
British Library Document Supply Service (BLDSS) API
Smart Meter Texas TDSP Master sync fileS
AEP ONCOR TNMP CenterPoint
Disposition of Load Research Key Documents
Settlement Timeline Workshop
MARS Taskforce RMS Update December 9, 2009.
Pro-Active Transaction Resolution Measures
2017 Annual Validation Update PWG
Usage Billing Issues.
Texas Assessment Management System Student Directory and Send Files
Demand Response – ERCOT discussion items
State Reporting Processing
Two methods to observe tutorial
6/12/2017 The RSA Modernization Project Common Questions and Errors in the Enrollment Process.
Presentation transcript:

November 17, 2014 ERCOT AMS Data Loading Result Code Descriptions & Distribution AMS Workshop IV

2 AMS Data Loading Result Code Descriptions November AMS Workshop IV Result CodeDescriptionHow MRE should interpret and/or correct F1 Record count exceeds file limit of 50,000 data records. File has failed to process. Record count exceeds file limit of 50,000 data records. File has failed to process. Resend file with or less data records. F2 Mandatory element missing. File has failed to process. Data cannot be loaded because a mandatory data element is missing. Resend data record with correct mandatory elements. 00Data loaded successfully. Data record completed successfully within ERCOT’s system. No Action required. 01 Mandatory element not a valid value. Refer to list of valid values for field listed in the LSE File Format Specifications document. 02Value has improper format. Data record contains an element that is incorrectly formatted. Resend data record with correct data format. 03 Data does not contain a full day. (DST inclusive) Data record does not contain a full day’s worth of data. Resend data record with a complete day of data starting 00:00:00 and ending 23:59:00. 04Data contains future dated read. Data contains a STARTTIME or STOPTIME greater than SYSDATE. Resend data record with corrected STARTTIME and/or STOPTIME that is in the past.

3 AMS Data Loading Result Code Descriptions November AMS Workshop IV Result CodeDescriptionHow MRE should interpret and/or correct 05 File contains more recent read for this ESI ID and timeframe. Load not attempted. File contains a more recent read for this ESI ID and timeframe. Load not attempted. No Action required. 06ESI ID does not exist. ESI ID does not exist in ERCOT's system. TDSP sends 814_20 to add ESI ID to ERCOT systems. Resend data record. 07 Sender is not the owner of the ESI ID. (Incorrect MRE DUNS) The ESI ID exists in ERCOT’s system but it is serviced/owned by different MRE entity. No Action required. 08 ESI ID profile code is invalid for LSE data submitted. The ESI ID exists in ERCOT’s system but the channel/recorder does not exist. TDSP sends 814_20 to update the Advance Metering PROFILE CODE. Resend data record. 09 Generation value for specific period was not expected but submitted. ESI ID is not set up to receive generation data. If ESI ID should have generation, TDSP sends 814_20 to update the PROFILE CODE. Resend data record. If ESI ID should not have generation, no action necessary. 10 Timestamp of data record is less than or equal to the timestamp of loaded data. The submitted transaction did not overwrite the loaded data because the timestamp of the submitted data was not greater than the timestamp of the loaded data. No Action required.

4 AMS Data Loading Result Code Descriptions Note: Implementation of the logic supporting AMS data loading result codes 11, 12 & 13 occurred on October 14, November AMS Workshop IV Result CodeDescriptionHow MRE should interpret and/or correct 11 WARNING: Exceeds Threshold – Bypass Requested The transaction submitted has been allowed to bypass validations for threshold only. 12Exceeds Threshold for load data. At least one 15 minute interval within the transaction has exceeded the threshold set for load. 13 Exceeds Threshold for generation data. At least one 15 minute interval within the transaction has exceeded the threshold set for generation.

5 AMS Data Loading Result Code Distribution 10/ /03/2014 November AMS Workshop IV RESULTSCODEDESCRIPTIONCOUNT(RESULTSCODE) F1Record count exceeds file limit of 50,000 data records. File has failed to process.1 F2Mandatory element missing. File has failed to process.0 0Data loaded successfully Mandatory element not a valid value. 3 2Value has improper format.0 3Data does not contain a full day. (DST inclusive)5 4Data contains future dated read.261 5File contains more recent read for this ESI ID and timeframe. Load not attempted ESI ID does not exist Sender is not the owner of the ESI ID. (Incorrect MRE DUNS) 0 8ESI ID profile code is invalid for LSE data submitted Generation value for specific period was not expected but submitted Timestamp of data record is less than or equal to the timestamp of loaded data WARNING: Exceeds Threshold – Bypass Requested0 12Exceeds Threshold for load data Exceeds Threshold for generation data.5