Construction Methodology for Suramadu Main Bridge.

Slides:



Advertisements
Similar presentations
ODOT Structure Project Manager Training
Advertisements

SEMINAR ON SEGMENTAL CONSTRUCTION OF BRIDGE
COST EFFECTIVE MASS HOUSING TECHNOLOGY
Chapter-2 Parts of Steel Bridge.
BRIDGE CONSTRUCTION INSPECTOR Practice Questions Next.
St. Croix River Crossing S. P
NOTE: REFERENCE PROJECT MANUAL DATED 1/4/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO. REVISIONS Construction.
Heavy Concrete Construction Formwork
MDOT ACTT Workshop Structures I-94 From I-96 to East of Connor Participants Steve Stroh, URS Corp Vijay Chandra, Parson Brinckerhoff Raj Ailaney, FHWA.
Bridge Engineering (6) Superstructure – Concrete Bridges
Concrete and Masonry Work Different forms of concrete work Each has it’s own unique hazards – Lift Slab – Pre-stressed Concrete – Concrete Pumping – Masonry.
Pre-stressed Steel System Post Tensioned Slab Case Study: K- Financial Tower.
ENG-1010 Lecture 16 Bridge Design.
Chapter 34 Bridge Construction.
John James Audubon Bridge Main Span Materials and Equipment Cement from Thailand Structural Steel from Japan Oscillator from Germany Wind tunnel analysis.
3 June Rapid Replacement of the Hood Canal Bridge Approach Spans Joseph Merth, P.E. Bridge Design Engineer 3 June 2008.
Reconstruction of the Eads Bridge Highway Deck
 Project Delivery  Design Considerations  Lessons Learned.
The Good, the Bad, and the Ugly 2 May 2008 Sacramento, CA Alan Macnab
CONSTRUCTION.
Construction Innovation: The Millau Viaduct Deck Launch Paul Eliasson Brian Follweiler.
Chapter 18 Foundations.
ODOT Policy for Deck/Slab Closure Pours Sean Meddles, P.E. Assistant Administrator ODOT Office of Structural Engineering.
Bridge Structure Types and Components. BRIDGE STRUCTURE TYPES AND COMPONENTS TECHNICAL STANDARDS BRANCH INTRODUCTION TO BRIDGES TRANSPORTATION Slide 2.
Foundation Engineering CE 483
RM Product Update October 2009 Alexander Mabrich, PE, Msc Senior Engineering Consultant.
Superstructure Replacement Substructure Repair Rehabilitation of I-95 Bridges 11 Bridges Along I-95 Corridor
Group N Chris Jones Ella Feekins Nikoline Hong
Other Construction Projects
Introduction to a pit installation
Reading Structural Drawings
The Alamillo Bridge. Designs Bird, harp, skeleton of dead dog, sculpture Two bridges Location of cable stays.
St. Croix River Crossing S.P Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction.
1 CV4902- Construction Methods Dr David Chew. 2 Construction Considerations Site layout plan Outline of entire construction process Details of temporary.
Moment Connection Requires Bolts Outside the Flanges
SFOBB East Span Seismic Safety Project Dan Ambuhl, Specifications Engineer, Caltrans.
1 9 th Oct Design and Construction of Main & Crescent Bridges.
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
Chapter 43 Common Commercial Construction Materials.
Caretakers House Demolition Decking to STEM and ARTS.
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
Foundation Loads Dead Load Live Load Wind Load
- LESS CONST. BUDGET - PREMIUM QUALITY - SHORT CONST. PERIOD - RELIABLE SAFETY - NO CRANE REQUIRED - LIGHT & EASY INSTALL Clear AccessManual Transfer Simple.
DIFFERENT TYPE OF BRIDGES
Bulb Piles –Franki Piles or pressure injected footings –Special form of cast in place pile with an enlarged base for increased load bearing F 10-4 Minipiles,
WELCOME ALL FACULTY MEMBERS & ALL PARTICIPANTS OF
COFFERDAMS.
Chapter-2 Parts of Steel Bridge. contents Bearings Horizontal and transversal wind bracing Classification of bridges.
NORTHERN URBAN HIGHWAY MEXICO CITY
FORMWORK for Civil Engineering Construction Works
TOTAL BRIDGE REPLACEMENT OF M-13 OVER CHEBOYGANING CREEK
Offsite manufactured Bridges
High Bridge Re-Deck Project
Required Drawings and Info for Formwork or Scaffold Design
Oregon DOT Integral Abutment Design Criteria
Temporary Works – P8 Project Practice.
FOOTING AND FOUNDATION
STRUCTURAL CONCEPT Cityland MART VPKC3 - VNCC.
Danube Bridge Vidin – Calafat
Ness Bridge Construction
New Bridge Construction
Arch205 Materials and building construction 1 foundation
Arch205 building construction foundation
محمد امین طلایی – پویا نوذری
Course Contents Culverts Bridges Buildings 20 November 2018.
COLUMNS SLIDE SHOW.
Building Construction I Sofia Sebastian 1
Concrete A structural material made by combining cement, sand, aggregate, and water.
Or How to get across a big gaping hole. Safely. Sometimes…
Chapter 6 Erection Manual Format
Presentation transcript:

Construction Methodology for Suramadu Main Bridge

1. Introduction of the Main Bridge Description Twin-pylon double-plane composite steal beam cable-stayed bridge (192m + 434m m) The height of the main pylon is m

Layout of Main Bridge

2. Construction Method 2.1 Construction of Platform 2.2 Construction of bored pile 2.3 Construction of pile cap 2.4 Construction of pylon 2.5 Construction of superstructure 2.6 Miscellaneous

2.1 Construction of Platform Description Platform comprised of concrete batching platform, drilling platform and auxiliary platform. Steel casing & pile will be driven by piling barge.

2.2 Construction of bored pile Machine High power, hydraulic bidirectional cycles drilling machine will be adopted for drilling. 3 drilling machines per platform. Construction sequence drilling work formation of piles installation of rebar concreting under water

Conventional drawing of bored pile construction

2.3 Construction of pile cap Description Pile cap will be constructed by steel caisson method Underwater concrete sealing layer will be poured by tremie pipe. Mass concrete of the pile cap will be poured in 3 layers with internal water pipes cooling system. Flow chart

Step 1. After completion of bored pile, remove the connection components of deck of platform and steel casing of the drilling paltform.

Step 2 Assemble the steel caisson

Step 3 Pour concrete sealing layer

Step 4 Install rebar & cast concrete in 3 layers

2.4 Construction of pylon Description The lower pylon will be constructed with turnover formwork. Middle and upper pylon will be cast in segments with self-climbing formwork system. transom will be cast with the support of false work. Flow chart

Step 1 Tower crane installaiton

Step 2 Tower base and lower pylon construction & elevator installation

Step 3 Lower transom construction

Step 4 Middle pylon construction

Step 5 Middle transom construction

Step 6 Upper pylon construction

Step 7 Upper transom construction

2.5 Construction of superstructure Description 0#,1# and tail-cable segment will be lifted by 500t barge crane and erected on temporary falsework. Other segments will be assembled by cantilever crane on bridge floor. Flow chart

Step1 1 、 Install 0# and 1# segment temporary falsework on the pile cap. 2 、 Install 0# 、 1# segment of steel girder by crane barge, temporary fix in between pylon and girder 3 、 tension cable of B1,Z1.

Step 2 Install cantilever crane on bridge floor.

Step 3 1 、 Install main girder by cantilever crane on bridge floor and tension corresponding cables. 2 、 Install deck slabs of first two segments and cast joints.

Step 4 1 、 Install main girders by cantilever crane on bridge floor, tension corresponding cables. 2 、 At the same time, construct temporary piers and temporary falsework for tail-cable segment before installation 12# segment.

Step 5 1 、 Install girders segment above the temporary pier by crane barges. 2 、 Install tail-cable segment by crane barge and apply counterweight.

Step 6 Continue installation symmetrically till closure of side span

Step 7 1 、 Install middle span steel girders closure segment, the entire bridge is closed, 2 、 Remove temporary connection in between pylon and column.

2.6 Miscellaneous Installation of motorcycle lane and pipe line. Installation of lighting posts, guardrails. Installation of expansion joints. Construction of asphalt pavement.