Safe Harbour CSE Symbol: PMC The following presentation may include certain “forward-looking statements” within the meaning of the United States Private.

Slides:



Advertisements
Similar presentations
Gold Rock May 2013 Drill-Ready Gold Property Adjacent to Manitou Gold.
Advertisements

Growing the Hope Brook Gold Project May 2013 TSX-V: CT OTCQX: CTIIF FRANKFURT: CY4 Member of Forbes & Manhattan Group of Companies.
IPO Presentation November September VMS Districts Net Values Wabassi Image From HudBay Corporate Presentation Exploration Program Review,
Mining in Latin America Ralph Lutes, Vice President, Asia, Executive Director & General Manager, Teck China October 22, 2014.
Babs property RKG Exploration. Babine Camp Bell Mine, past production and reserves 160MT grading 0.45% Cu and 0.34g/t Au. Granisle Mine, past production.
A Growth Company Producing Rare Precious Metals Palladium & Platinum June 7, 2000.
1 NYSE MKT: REE & TSX: RES Bear Lodge Critical Rare Earth Project Technology Metals Summit – March 2013 A Year of Dramatic Change.
June 29, 2007 Research Capital Presentation Alex Pannu Iain Brown Jim Simpson John Braden DISCOVERY-CORP ENTERPRISES INC.
1. Investor Presentation April Disclaimer DISCLAIMER: This presentation contains forward-looking statements including but not limited to comments.
© 2014 Focused on a World Class Discovery. © 2014 Forward Looking Information This presentation contains forward-looking statements, which represent the.
1 Mineral Enterprise Corporation Investor Presentation MINENCO.
Understanding and Valuating Exploration Companies 24 May 2007 Shane Hunter.
4.7 Billion Rand Investment In South Africa Driefontein 9 Sub-vertical Shaft Depth Extension and Kloof Extension Area Decline Shaft System 7 September.
TSX: SGR OTCQX: SGRCF 1 SAN GOLD CORPORATION CORPORATE PRESENTATION TSX: SGR OTCQX: SGRCF JUNE 2013.
Redstar Gold Corp December 15, TSX-V:RGC. About Company Redstar is a Joint Venture model company designed to give shareholders multiple opportunities.
CanAlaska Ventures Ltd This slide show presentation contains certain "Forward-Looking Statements" within the meaning of Section 21E of the United States.
NEVADO RESOURCES CORPORATION (TSX-V:VDO) Strategic Metals in Northern Quebec August 2013.
Perlat Project Volcanogenic Massive Sulphide Copper, Gold, Silver, Zinc Mr. Zahir (Zip) Dhanani Chairman, CEO and Director Mr. Robert Naso General Manager.
Red Rock Energy Inc. (TSX-V: RRK) May 9, This presentation may contain forward-looking information including expectations of future production,
Agnico-Eagle Mines Limited1. 2 Growth Strategy Building Value Through Production and Reserve Growth Produce more gold targeting over 1.2 million ounces.
TSX.V: PRB Focused on Creating Significant Shareholder Value in 2011.
Silver Shield Resources Corp. A MEXICO PRECIOUS METALS DEVELOPER TSX Venture: SSR.
September 2014| CORPORATE PRESENTATION. This presentation contains forward-looking statements concerning future operations of Falcon Gold Corp. (“the.
FLOW-THROUGH FINANCING Q Safe Harbour Statement Safe Harbour Statement This presentation contains certain forward looking statements, which are.
Todd Creek (25% Interest) May 2013 An Advanced Exploration Project in B.C.’s Golden Triangle.
November Certain information contained or incorporated by reference herein, including any operating performance of Lion One Resources Inc. (“Lion.
TSX-V: OCO Frankfurt: OR6
1 Dutch Gold Resource, Inc. Company Update April 5, 2012 DGRI: OTCQB.
Forward Looking Statements This presentation contains “forward looking statements”. These forward-looking statements are made as of the date of this presentation.
Commodity Hedging Overview May 10, 2012 The following information is current as of May 10, Memorial Production Partners LP (MEMP) intends to provide.
Heritage Gold NZ Limited Presentation AGM 23 September 2010 …..unlocking value.
1 Presented By: Neil McMillan President & CEO Q1 Financials May 14, 2012.
Greencastle Resources Ltd. Gold Exploration Oil Royalty Cash Flow Battle Mountain Trend, Nevada Republic of Niger, West Africa.
Presentation to MineAfrica’s Investing In Africa Seminar March 4, 2008 By Don Willoughby, VP Corporate Development All financial.
MIS-CNSX GL RA F-OTC NYC Presentation. Forward Looking Statement This presentation may contain information that constitutes forward-looking statements.
AN EMERGING NEW GOLD DISTRICT THE LAVOIE AND MAISIE DISCOVERIES October 2012.
GIS Services Our long journey to an Enterprise GIS  Brief history of GIS at Noble  Map Requests  Land Focus  Data  Introducing GIS Services  Standards.
100% ownership (subject to gov’t 10% carried interest) in 2 contiguous prospecting licenses covering 161 sq km on the Ashanti Shear. Right to acquire.
SYDNEY MINING CLUB CLUB 5 DECEMBER Outline of Presentation  the answer  the question  the explanation:  How we got here  Coal cash flow leverage.
SAFE HARBOR Certain statements contained in this presentation regarding Rick's Cabaret future operating results or performance or business plans or prospects.
Symbol: DCY Exchange: TSX-V Current Price $ week Hi-Low $0.37-$0.07 Total Shares Outstanding 27,237,962 Fully Diluted 32,457,962 Market Capitalization.
Presented by: Kribs Govender GM: Low Carbon Electricity Sasol New Energy oil and gas mozambique conference 2013.
Sian Gold Project – Ghana BRIEF SUMMARY June 2009.
Mineral Exploration and Development
Presentation Disclaimer Forward Looking Statements  This presentation may contain certain forward looking statements and projections regarding:  estimated,
TSXV: RVS Frankfurt: 3RV TSXV: RVS Frankfurt: 3RV
Overview November Safe Harbor Statement ♦Some of the statements included herein may include forward-looking statements which reflect our current.
CORPORATE PRESENTATION JUNE Forward Looking Statements Certain information regarding the Company contained herein may constitute forward-looking.
Premium Announces Private Placement of Senior Secured Debentures.
Premium Closes $500,000 Non-Brokered Private Placement With Osisko Mining Corporation.
CORPORATE PRESENTATION
Investor Presentation – SEPTEMBER NGM:TSX-V
Developing a Canadian Gold Deposit
Central Nevada Lithium Brine Projects
EV Battery Metals Nickel Copper Cobalt Lithium
Hudson Bay Resources AS
First Quarter Fiscal Year 2016
Shot Rock Gold Property, Nova Scotia
Central Nevada Lithium Brine Projects
……. Date. Disclaimer… Randgold reports its mineral resources and mineral reserves in accordance with the JORC 2012 code. As such numbers.
BOARD Chris Creagh Mr Creagh is a geologist with more than 30 years of experience in the Australian and international mining industry. Chris brings significant.
SAN LUCAS PROJECT Technical Data 1/18/2019 TSX-V MNN.
Drilling in the Shadow of World-Class Deposits
NEW COBALT DISCOVERy potential
Capella Resources Ltd TSX.V: KPS December 15, 2009.
SAN LUCAS PROJECT Technical Data June 25, 2019 TSX VENTURE: MMN.
EL SOL PROJECT Technical Data June 25, 2019 TSX VENTURE: MMN.
TEJAMEN PROJECT Technical Data June 25, 2019 TSX VENTURE: MMN.
Blueberry.
Manaila Polymetallic Mine
Presentation transcript:

Safe Harbour CSE Symbol: PMC The following presentation may include certain “forward-looking statements” within the meaning of the United States Private Litigation Reform Act of 1995 and applicable Canadian Securities Laws. All statements, other than statements of historical fact, included in the presentation, including, without limitation, statements regarding potential mineralization resources and reserves, exploration results, and future plans and objectives of Peloton Minerals Corportion are forward-looking statements. Words such as “expect”, “anticipate”, “estimate”, “may”, “will”, “should”, “intend”, “believe” and other similar expressions are forward-looking statements. Forward-looking statements are not guarantees of future results and conditions but rather reflect our current views with respect to future events and are subject to risks, uncertainties, assumptions and other factors, and actual results and future events could differ materially from those anticipated in such statements. There can be no assurance that such forward-looking statements will prove to be accurate. Some of the important factors that could cause actual results to differ materially from our expectations are disclosed under the heading “Risk Factors” and elsewhere in documents filed from time to time with the Canadian provincial securities regulators. We base our forward-looking statements on information currently available to us and we do not assume any obligation to update them, except as required by law. An additional Cautionary Note to Investors – In the event that we use certain terms in this presentation, such as “resource”, “measured resource”, “indicated resource” and “inferred resource”, U.S investors are cautioned that, while such terms are recognized and required by Canadian Securities Laws, the United States Securities and Exchange Commission does not recognize them. Under U.S. standards, mineralization may not be classified as a “reserve” unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination has been made. U.S. investors should not assume that all or any part of measured or indicated resources will ever be converted into reserves. In addition, “inferred resources” have a great amount of uncertainty as to their existence and as to whether they can be mined legally or economically. Accordingly, information concerning descriptions of mineralization in this presentation may not be comparable to information made public by companies that are subject to the SEC’s Industry Guide 7.

Share Capital CSE Symbol: PMC Exchange ListingCSE: PMC Recent Share Price$0.10 Shares Outstanding Market Capitalization 50.9 million – basic 85.1 million – fully diluted CAD $5 million – basic Share Ownership At July 18, 2016 Directors ~ 20% Close Holders ~ 25% Euro Funds ~ 25%

An Experienced Board, Management and Technical Team CSE Symbol: PMC Directors & Management John F. O’Donnell, BA (Economics), LLB, Chairman of the Board Edward (Ted) L. Ellwood, MBA, President & CEO, Director Paul Teodorovici, Vice-President, Director Eric Plexman, Corporate Secretary & CFO, Director Luard Manning, P.Eng., Director Kent Britton, BA Economics, Director Clifford Wiebe, Director John Wozny, MA, Director Consulting Technical Richard C. Capps, PhD, RPG, SME Reg. Geo., Nevada John F. Childs, PhD., Reg. Geo., Childs Geoscience, Inc., Montana

About Peloton CSE Symbol: PMC Mineral Exploration Company & Project Generator Experienced Board, Management and Technical Team Current Projects Located in Nevada, Montana and Ontario Actively Reviewing Potential Additions to Project Portfolio Project Criteria: Located in known mineralized areas Located in secure jurisdictions Potential for scale Potential to monetize

Peloton Owns a 100% Working Interest in Three Gold Exploration Projects CSE Symbol: PMC Golden Trail Project Elko County, Nevada Elko County, Nevada Silver Bell – St. Lawrence Project Virginia City Mining District, Montana River Stage Project Rainy River Gold Camp, Ontario

Golden Trail Project Elko County, Nevada CSE Symbol: PMC

Golden Trail Project CSE Symbol: PMC Nevada is a Prolific Gold Region & Mining Friendly – If Nevada were a country it would rank 5 th in world gold production. Mine permitting is reasonable and handled with considerable experience. Golden Trail is Located on a New Carlin Style Nevada Gold Trend – The newly identified Pequop Gold Trend is a Carlin style trend now being actively explored. Major New Gold Discoveries on Trend 50 and 100 Miles South of Golden Trail – Long Canyon is located 50 miles south of Golden Trail on the Pequop Gold Trend and was bought by Newmont in 2011 during it’s $2.3 Billion acquisition of Fronteer Gold Inc. Similarities to Long Canyon – A number of geologic similarities have been identified between the geology of the Golden Trail and the Long Canyon. Featured Project at the 2015 Geologic Society of Nevada Symposium under “Carlin- Style Deposits”

Nevada vs Top Ten Gold Producing Countries CSE Symbol: PMC 2013 Output (Metric Tonnes) 1.China420 2.Australia255 3.USA227 4.Russia 220 Nevada171 5.Peru150 6.South Africa145 7.Canada120 8.Mexico100 9.Uzbekistan Ghana 85

Golden Trail Located on the Peqoup Gold Trend 52 Miles North of Newmont’s Long Canyon CSE Symbol: PMC

Golden Trail Project Surface Results CSE Symbol: PMC Gold in decalcified limestone. The longest identified vein at Golden Trail has been traced on surface for 1,200 metres with an associated 30 metre wide alteration package. Grab samples from this vein have run from 0 to 28 grams per tonne. Continuous 5 foot trench samples in 2014 returned: 13.7 grams gold and 36.2 grams silver was returned in one 5 foot continuous trench sample of a siliceous Feox-Rich limestone Breccia grams gold with 105 grams silver was returned in another 5 foot continuous trench sample of a jasperoid & limestone contact material. A major geophysical gravity anomaly that has never been drilled underlies the property.

Geological Society of Nevada (GSN) Symposium, Reno, NV, May 2015 CSE Symbol: PMC Golden Trail Property featured in a Poster Display within the GSN Symposium area titled: “Carlin-Type Deposits” Technical Paper published at the GSN Symposium titled: “Geologic Setting of Gold Mineralization at the Golden Trail Project, Northeastern Elko County, Nevada, R. Capps, P. Noble and C. Jorgensen.” GSN Named the PequopTrend: Nevada’s Newest “Carlin” Trend

Peloton Activity on Golden Trail Property CSE Symbol: PMC 2016 – Hyperspectral Airborne Survey & Drilling (Summer/Fall) – Permitted for Drilling – Geochemical surface surveys completed – Completed Cultural Resource Survey as part of a Drilling Permit Application with BLM. Filed NI technical report by Richard C. Capps, PhD, May 2012 Geological Mapping, Geochemical and Geophysical Surveying Programs 2004 to 2007, and 4 vertical holes drilled in 2007 (by predecessor company Gold Reef International Inc.) $1.4 Million spent on surface exploration to date.

Rock Chip Geo-Chemistry GT Vein metre strike length CSE Symbol: PMC

Major Gravity Anomaly Underlies Golden Trail Claim Block CSE Symbol: PMC

Golden Trail Exploration for 2016 CSE Symbol: PMC January- April – Exploration permit renewal, update and approval. June – Receive delivery of diamond drill rig purchased by the Company in late July – Hyperspectral Airborne Survey over entire property. August – Hyperspectral data analysis & drill mobilization. September & October – core drilling of 33 holes on 11 grid lines across and along Golden Trail surface gold vein November & December – Hyperspectral core analysis, assaying, hyperspectral modeling in 3 dimensions, additional drilling

Silver Bell St. Lawrence Gold (“SBSL”) Project Virginia City Mining District, Montana CSE Symbol: PMC

SBSL Project CSE Symbol: PMC Hosts two historic Montana gold mines (the Silver Bell & St. Lawrence) that produced in the early 1900s and again in the 1960s and 1970s at the St. Lawrence. The head frames of the two mines were 3,600 feet apart with each of the two vein systems striking toward the other mine (operated by different owners). Focus of exploration is between the head frames, down dip and along strike for parallel structures and splays in both the hanging wall and footwalls. Historical smelter records reported gold grades ranging from 0.15 to 0.52 ounces per ton and silver grades ranging from 2.7 to 15.6 ounces per ton. Property totals approximately 394 acres with 1 patented claim and 25 unpatented claims.

Peloton Activity on SBSL Project CSE Symbol: PMC Staked 1 additional claim in 2016 to enhance ground position NI technical reports by John F. Childs, PhD, Childs Geoscience, filed May, 2011 and June 2012 Completed payments to secure 100% ownership, Spring 2012 Geological Mapping, Geochemical and Geophysical Surveying Programs. Fall, 2011 Staked 16 additional claims along strike. Total now 25 unpatented and 1 patented (394 acres). Fall, 2011 Ground preparation and arrangements with surface rights owner. Summer, 2011

SBSL Project Grid Over the Two Mine Shafts CSE Symbol: PMC

Peloton Possesses the Underground Mapping & Sampling Data for Both Former Mines CSE Symbol: PMC

SBSL Project – Potential Drill Targets Line 5E CSE Symbol: PMC

SBSL Project – Potential Drill Targets Line 4E CSE Symbol: PMC

SBSL Project NI Report Interpretation & Conclusions CSE Symbol: PMC Based on comparisons with other vein systems in the VCMD, (Virginia City Mining District) there appears to be adequate similarities to suggest potential for an exploitable gold and silver deposit(s) on the Silver Bell-St. Lawrence property. The veins in the area share similar ore mineralogy, gangue type and alteration assemblages with many of the more prolific deposits in the VCMD. Multiple vein systems are an important component in many of the larger deposits in the area (e.g. the U.S. Grant, Kearsarge and Marietta), with the depth of production often reaching 300 to 650 feet. The historical activity at the Silver Bell and St. Lawrence mines never reached deeper than approximately 200 feet. John F. Childs, PhD., Reg. Geo., June, 2012.

River Stage Project, Rainy River Gold Camp, Ontario CSE Symbol: PMC

River Stage Project Rainy River Gold Camp, NW Ontario CSE Symbol: PMC 100% working interest in 2,480 claim package acquired June 2016 Located in center of Rainy River Gold Camp, 90 km southeast of Kenora, Ontario Claims immediately adjacent to First Mining claims purchased in June 2016 from Chalice Gold & holding the Cameron Lake Deposit (measured & indicated 569,000 oz g/t with inferred resource of 894, g/t) Many other exploration companies either tied onto Pelton claims, nearby or moving in. A Very Active Camp. New Gold currently building the Rainy River Mine 15 miles south-east of Peloton claims with a 2,100 tpd mill capacity.

River Stage Project - A Very Active Gold Camp CSE Symbol: PMC

River Stage Project Plans for 2016 CSE Symbol: PMC Summer – geologic review and data compilation Summer / Fall : Geologic mapping program Surface prospecting program Soil geochemistry program

Project Summaries CSE Symbol: PMC Golden Trail Project Carlin Style, Bulk Tonnage Open Pit Target Elko County, Nevada Silver Bell – St. Lawrence Project High Grade, Multiple Vein Bulk Tonnage Underground Target Virginia City Mining District, Montana River Stage Project Centered in Canada’s Newest Gold Camp Rainy River Gold Camp, Ontario

Contact Information CSE Symbol: PMC 380 Wellington Street Tower B, 6 th Floor London, Ontario N6A 5B5 Phone: (519) Fax: (519) Investor Inquires: Edward (Ted) Ellwood, President (519) Paul Teodorovici, Vice-President (514)