International Telecommunication Union Document WRC-15-IRWSP-15/14-E 1 September 2015 English only 3 rd ITU INTER-REGIONAL WORKSHOP ON WRC-15 PREPARATION.

Slides:



Advertisements
Similar presentations
BR WORKSHOP ON THE EFFICIENT USE OF THE SPECTRUM/ORBIT RESOURCE ESOA Limassol, Cyprus, April
Advertisements

ICTS REGION II REPORT (Minus the USA, see Session Items 5 & 6) By the Region II (the Americas) Coordinator: Mr. Mikel R. Ryan Patuxent River MD, United.
John Taylor Nairobi, Kenya Sept 3-4, 2013 WRC-15 Agenda Item
WRC-07 AGENDA ITEMS OF INTEREST TO PASSIVE SERVICES WITH PARTICULAR EMPHASIS ON 1.2 AND 1.17 REGULATORY ISSUES REQUIRED ACTIVITIES CURRENT STATUS IN ITU-R.
WRC 2007 Results October 22 ~ November 16, 2007 Geneva, Switzerland Masatoshi OHISHI RAFCAP meeting 2008.
WRC-12 Preparation CPG Chairman /
AGENDA ITEM 1.1 To consider additional spectrum allocations to the mobile service on a primary basis and identification of additional frequency bands for.
WMO Workshop on Radio Frequencies for Meteorology Meteorological Satellite Services David F. McGinnis U.S. Dept. of Commerce, NOAA 7 October 2002 Geneva,
WRC 2011 Agenda Items Masatoshi OHISHI RAFCAP meeting 2008.
Spectrum for UAS UAS at WRC-12 European WRC-12 preparation Martin Weber, Federal Network Agency, Germany EU UAS Panel Workshop Brussels,
Providing Useful Regulatory Solutions T T & C Telecommunication Regulatory Consultants Shayla E. Taylor TT&C USITUA WRC Seminar September 19, 2007.
Nadi, Fiji, 4-6 July 2011 APT in regional harmonization of wireless Cristian Gomez Head, Validation Group, Space Services Division, ITU-R ITU-T Workshop.
CEPT preparations status for WRC-15 Mr. Per Christensen (ECO Director) August 2015 The second Annual Middle East & North Africa Spectrum Management Conference,
CEPT positions for WRC-15 Mr. Alexander Kühn CPG-15 Chairman October 2015.
1 World Radiocommunication Conference ‘07 Preview Edward M. Davison Deputy Associate Administrator, International DoC/NTIA/OSM May 23, 2007 NSMA.
John Taylor ICAO Preparatory Spectrum Seminar for WRC-15 Thailand March 11-12, 2014 WRC-15 Agenda Item
WRC–12 Industry Debrief 23 April 2012 Agenda item 1.14 – Radiolocation Service 30–300 MHz Presenter: Darrell Ninham.
WRC–12 Industry Debrief 23 April 2012 Agenda item 8.2 – Future WRC Agendas.
Role of World Radiocommunications Conference and European preparations for WRC Stella Lyubchenko 4 th CEPT Workshop on European Spectrum Management and.
International Telecommunication Union Document WRC-15-IRWSP-15/16-E 1 September 2015 English only 3 rd ITU INTER-REGIONAL WORKSHOP ON WRC-15 PREPARATION.
National Preparatory Working Group meeting for World Radio-communications Conference 2015 Aeronautical Agenda Item 1.7 Presented by Takalani Tshikalaha.
Agenda item Allocation to the Fixed- Satellite Service in the 7 ‑ 8 GHz range Presenter: Carol Wilson (Coordinator: Kevin Knights)
Agenda item 9.2 On any difficulties or inconsistencies encountered in the application of the Radio Regulations (non-ESOMPS)
Agenda item 1.16 VHF data exchange system (VDES).
Thomas vonDeak, NASA Remote Sensing Spectrum Manager NAS CORF Spring Meeting May 19, World Radiocommunication Conference Results: spacebased.
Agenda Item: 1.8 Title: to review the provisions relating to earth stations located on board vessels (ESVs), based on studies conducted in accordance with.
CRAF POSITION ON WRC-19 AGENDA ITEMS RELEVANT TO RADIO ASTRONOMY Talayeh Hezareh - CRAF FM Max Planck Institute for Radio astronomy Bonn, Germany MAY 20,
International Telecommunication Union Document WRC-15-IRWSP-15/8-E 3 September 2015 English only 3 rd ITU INTER-REGIONAL WORKSHOP ON WRC-15 PREPARATION.
Fifth SADC Preparatory Meeting for the WRC-15 AGENDA 1.18 To consider a primary allocation to the radiolocation service for automotive applications in.
Agenda Item: 1.12 Title: Extension of current worldwide allocation to the Earth exploration–satellite (active) service in the frequency band 9300– 9900.
International Telecommunication Union Addendum 1 to Document WRC-15-IRWSP-15/1-E 31 August 2015 English only 3 rd ITU INTER-REGIONAL WORKSHOP ON WRC-15.
CEPT position on WRC-12 AI’s 1.3, 1.4, 1.7, 1.12 and 1.25
ICAO Position for ITU WRC-15
broadband applications, in accordance with Resolution 233 (WRC-12)
Cindy Cook Chairman, TG 5/1 November 2, 2016
Steering Group on Radio Frequency Coordination (SG-RFC)
Panel Session 2 WRC-15 Agenda items 1.16, 1.4, 1.15
SADC 5th WRC-15 Preparatory Meeting, Gabarone, Botswana September 2015
ROAD MAP TO RA AND WRC-07 RA & WRC-07.
RADIO SPECTRUM MANAGEMENT
ICAO Position for ITU WRC-15
As of 22nd Meeting, Abu Dhabi, United Arab Emirates: April 2017
PRELIMINARY POSITION OF THE RCC CAs ON THE AGENDA ITEMS OF THE WORLD RADIOCOMMUNICATION CONFERENCE 2012.
Panel Session 3 WRC-15 Agenda item 1.1
Panel Session 4 WRC-15 Agenda items 1. 2 and 1. 3 (incl
SADC WRC-15 Preparatory Meeting
WRC-15 Agenda Item 1.7 John Taylor ICAO Preparatory Spectrum Seminar for WRC-15 Thailand March 11-12, 2014.
WRC-12 A.I. 1.3 Eric ALLAIX DGAC-DSNA.
5G and IMT Identification - Views from CEPT-
John Taylor ICAO Spectrum Workshop for WRC-15 CAIRO Feb 16-17, 2015
doc.: IEEE <doc#>
September 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Regulatory activity above 275 GHz in.
Panel Sessions 7 & 8 WRC-15 Agenda items 7 & 9.1 issues (9.1.2, 9.1.3, 9.1.5, 9.1.8) Khalid Al Awadhi.
Doriana Guiducci, European Communications Office
12/7/2018.
Panel Session 5 WRC-15 Agenda items 1.6, 1.8, and 1.7
SADC WRC-15 5th Preparatory Meeting
Draft ICAO Position for ITU WRC-19
COSPAR SA 2008, E110 IUCAF session
SADC WRC-15 Preparatory Meeting
Draft ICAO Position for ITU WRC-15
John Taylor Nairobi, Kenya Sept 3-4, 2013
Possible Future Agenda Items
Agenda Item Overview & draft India proposal
Draft ICAO Position for ITU WRC-15
Inmarsat Position on WRC-19 Agenda Item 9.1 Issue 9.1.1
GSC position on key WRC-19 AI 1.5 ESIMs
INMARSAT > CTO> RMA
U.S. Department of Commerce, National Oceanic and Atmospheric Administration (NOAA), Radio Frequency Management Division (RFMD) Carlos Flores 18 July 2019.
Preliminary GSC positions on WRC-19 agenda items 1.13 IMT
Presentation transcript:

International Telecommunication Union Document WRC-15-IRWSP-15/14-E 1 September 2015 English only 3 rd ITU INTER-REGIONAL WORKSHOP ON WRC-15 PREPARATION (Geneva, 1 – 3 September 2015) Xiaoyang GAO Panel Session 6 WRC-15 Agenda items 1.9.2, 1.10 and 9.1(9.1.1)

3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 2 Mobile-satellite service  A.I : the possibility of allocating the bands MHz and MHz to the maritime- mobile satellite service, together with additional regulatory measures  A.I. 1.10: spectrum requirements and possible additional spectrum allocations for the mobile-satellite service within the frequency range from 22 GHz to 26 GHz  A.I. 9.1, issue – Res. 205 (Rev.WRC-12) : Protection of the systems operating in the mobile-satellite service in the band MHz

3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 3 Agenda Item CPM Methods and Regulatory & Procedural Considerations to satisfy the agenda item: a)Only possibilities for GSO satellite networks for the primary MMSS allocation are analyzed. b)3 Methods are proposed: Method A: No change: no allocation to the MMSS in the 7/8 GHz band Method B: Allocation of the bands MHz (s-E) & MHz (E-s) to GSO MMSS: - Apply existing pfd limits in RR Art. 21 Table 21-4 for the MHz band in MMSS downlink - Coordination under RR Nos. 9.7 and 9.21 for MMSS satellite networks Coordination of MMSS earth stations: - Option A: RR Nos & 9.17, 9.17A, Option B: WRC Resolution to stipulate the implementation of exclusion zones around FS, EESS and SRS (deep space) earth stations

3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 4 Agenda Item Method C: Allocation of the band MHz to GSO MMSS (space-to-Earth): -MMSS does not claim protection from, nor constrain the use or development of incumbent terrestrial services. RR No. 5.43A does not apply. -Sharing with space services under RR Art.9 -No allocation to the MMSS in the MHz (Earth-to- space) band

3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 5 Agenda Item Regional Group Considerations: Oppose the allocation of MMSS in the band MHz No Change to the frequency allocations in this frequency range Position: Does not support the allocation to the MMSS in the frequency bands MHz and MHz. Support NOC

3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 6 Agenda Item Method A (NOC) Oppose the allocation of the frequency bands MHz and MHz to the maritime mobile- satellite service since the ITU-R studies have shown that compatibility of the MMSS with other space services is not possible without imposing additional constraints on them.

3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 7 Agenda Item Method C: -Oppose the allocation of MMSS in the band MHz -Support the allocation of MMSS in the band MHz IAP: Method A (NOC)

3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva Agenda Item Matrix of Regional Group Considerations:  It is assumed that SUP of Res. 758 (WRC-12) is agreed by all Regional Groups Method APTASMGATUCEPTCITELRCC (PACP)(Position)(AFCP)(Pre. Position)(IAP)(Position) Method A Oppose uplink allocation NOC Method B Method C Support

3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 9 Agenda Item CPM Methods and Regulatory & Procedural Considerations to satisfy the agenda item: Method A: No change: no allocation to MSS within GHz band Method B1: To allocate the frequency bands GHz (space-to-Earth) and GHz (Earth-to-space) to the GSO MSS under the following conditions: – Application of pfd limits for MSS transmitting space stations in the frequency band GHz – Application of e.i.r.p. density limits for MSS space stations in the band GHz to protect non-GSO space station links – Coordination of MSS with ISS (space station links between non-GSO and GSO) in accordance with RR No. 9.7 in the frequency bands GHz (space-to-Earth) and GHz (Earth-to-space) – Coordination of MSS transmitting earth stations with FS and MS receiving stations under RR No in the frequency band GHz

3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 10 Agenda Item 1.10 Method B2: To allocate the frequency bands GHz (space-to-Earth) and GHz (Earth-to-space) to the GSO MSS on the following conditions: – Application of pfd limits for MSS transmitting space stations in the frequency band GHz – Application of e.i.r.p. density limits for MSS space stations in the band GHz to protect non-GSO space station links – Coordination of MSS with ISS (space station links between non-GSO and GSO) in accordance with RR No. 9.7 in the frequency band GHz (space-to-Earth) – Coordination of MSS transmitting earth stations with FS and MS receiving stations under RR No in the frequency band GHz

3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 11 Agenda Item 1.10 Method C1 ↓ Option C1a: To allocate the frequency band GHz for the MSS (space-to-Earth) with the following conditions: – MSS allocation shall be limited only to geostationary systems – Application of pfd limits for MSS transmitting space stations in the frequency band GHz – Coordination of MSS space stations under RR No. 9.7 Method C1 ↓ Option C1b: To allocate the frequency band GHz for the MSS (space-to-Earth) with the following conditions: – MSS allocation shall be limited only to geostationary systems – Application of pfd limits for transmitting space stations in the frequency band GHz – Coordination of MSS stations with the ISS in accordance with RR No. 9.7 in the frequency band GHz (space-to-Earth) – Constraint on MSS (s-E) e.i.r.p. density to protect ISS

3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 12 Agenda Item 1.10 Method C2 ↑ Option C2a: To allocate the frequency band GHz for the MSS (Earth-to-space) with the following conditions: – MSS allocation shall be limited only to geostationary systems – Coordination of MSS space stations under RR No. 9.7 – Apply RR No to ensure protection of the terrestrial services Method C2 ↑ Option C2b: To allocate the frequency band GHz for the MSS (Earth-to-space) with the following conditions: – MSS allocation shall be limited only to geostationary systems – Coordination with the ISS under RR No. 9.7 – Apply RR No to ensure protection of the terrestrial services

3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 13 Agenda Item Regional Group Considerations: It would be very difficult, if not impossible, to ensure the protection of various incumbent services in the frequency range 22 – 26 GHz from the impact of interference from new allocation to MSS due to the mobility of MSS earth stations. The spectrum requirements for MSS in the GHz band also need to be further studied. Method A is supported. Position: NOC

3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 14 Agenda Item 1.10 Method A (NOC) Support additional allocation of 250 MHz for MSS in each direction: - space-to-Earth: GHz or GHz -Earth-to-space: GHz or GHz

3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 15 Agenda Item 1.10 Method A: Does not support MSS allocations under this Agenda Item because studies have shown incompatibly with some existing services in certain cases (e.g. in the frequency bands GHz, GHz, GHz) while they have not been completed in other cases (e.g. in the frequency band GHz). IAP: Method A (NOC)

3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva Agenda Item Matrix of Regional Group Considerations: Method APT (PACP) ASMG (Position) ATU (AFCP) CEPT (Pre. Position) CITEL (IAP) RCC (Position) Method A NOC Method B1 Method B2 Method C1 ↓ Option C1a or GHz Option C1b Method C2 ↑ Option C2a or GHz Option C2b 16  It is assumed that SUP of Res. 234 (WRC-12) is agreed by all Regional Groups

3 rd ITU Inter-regional Workshop on WRC-15 Preparation, 1-3 September 2015, Geneva 17 Agenda Item 9.1, issue All Regional Groups support: 1.Regulatory and procedural considerations in the CPM Report to WRC-15 to protect the MSS systems in the MHz band; 2.Modification to Resolution 205 (Rev.WRC-12) with a view of having an adequate protection of the MSS in the frequency band MHz in order to detect and successfully process 406 MHz distress signals, taking into account the current and future deployment of services in adjacent frequency bands.