D_R / D_1 Vincent Boudry LLR, École polytechnique FJPPL'10 LAPP — Annecy 15/06/2010 A common R&D on the new generation detector for the ILC Shinshu KEK.

Slides:



Advertisements
Similar presentations
J-C. BRIENT (LLR) 1  Introduction with pictures  Prototype design and construction  R&D on the design of the full scale calorimeter CALICE - ECAL silicon-tungsten.
Advertisements

1 Calice LCUK Bristol 24/03/09 David Ward WP1 : Test Beam.
31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
CALICE SiW Electromagnetic Calorimeter Testbeam performance and results Roman Pöschl LAL Orsay IEEE – NSS&MCI '08 Dresden/Germany - October The.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
David Attié Club ‘ILC Physics Case’ CEA Saclay June 23, 2013 ILD & SiD concepts and R&D.
Calorimetry: a new design 2004/Sep/15 K. Kawagoe / Kobe-U.
The CALICE Si-W ECAL - physics prototype 2012/Apr/25 Tamaki Yoshioka (Kyushu University) Roman Poschl (LAL Orsay)
The Scintillator ECAL Beam Test at FNAL Adil Khan International Linear Collider Workshop 2010 LCWS10 & ILC10, Beijing, China CALICE Scintillator ECAL group.
SiD R&D on PFA and Calorimetry -> IDAG guidance. -> Present PFA situation. -> Developing a timeline for PFA development. -> Calorimetry aspects.
SiW ECAL Technological Prototype Test beam results Thibault Frisson (LAL, Orsay) on behalf of the CALICE collaboration.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
1 Snowmass2005 report 2005/09/26 H. Matsunaga GLDCAL meeting.
CALICE Referees’ Review Andy White, Junji Haba DESY – PRC 71 April 2011.
Tungsten as HCal-material for a LC at multi-TeV energies CALICE AHCAL Meeting, DESY 17 July 2009 Christian Grefe for the Linear Collider Detector Group.
GLD Calorimetry 2005/Mar/03 K. Kawagoe / Kobe-U. Introduction Current design –To be optimized for Particle Flow Algorithm (PFA) aiming at 30%/sqrt(E)
Scintillator ECAL for ILC for Calorimeter Review DESY May2007 Tohru Takeshita (CALICE-Shinshu) Idea implementation current status future mile stones.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
M. Chefdeville LAPP, Annecy, France. Introduction  Motivations for a Digital hadronic calorimeter Count hits instead of measuring energy deposits Reduce.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
GLD-CAL and MPPC Based on talks by T. Takeshita and H. K. Kawagoe / Kobe-U 2005-Sep-16 MPPC
1 ILC Detector Activities in Japan Hitoshi Yamamoto Tohoku University IRFU Linear Collider Days, Sacley November 29, 2013.
R&D status of the Scintillator- strip based ECAL for the ILD Oct LCWS14 Belgrade Satoru Uozumi (KNU) For the CALICE collaboration Scintillator strips.
ECAL review 5 th ILD LAL Orsay May 2011 K. Kawagoe Kobe-U  Kyushu-U in April 2011.
Taikan Suehara, Belgrade, 7 Oct page 1 Hybrid ECAL: optimization and related developments Taikan Suehara H. Hirai, H. Sumida, Y. Sudo, T.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
Software Status for GLD Concepts Akiya Miyamoto 31-October-2007 ILD Optimization Meeting References: - Y.Sugimoto, “GLD and GLDc”, talk at ALCPG07, ILD.
CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island The CALICE –ECAL Silicon - V. Vrba Very FE - S. Manen Readout/DAQ - P. Dauncey.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
4th Concept Detector G P Yeh TILC08, Sendai, Japan Mar. 3-6, 2008.
Strip-splitting method for ECAL clustering K. Kawagoe (Kobe) for K. Kotera (Shinshu) CALICE meeting, Casablanca 24th September,
The Prototype Simulation of SDHCAL Ran.Han Gerald.Grenier Muriel.Donckt IPNL.
Performance of Scintillator-Strip Electromagnetic Calorimeter for the ILC experiment Satoru Uozumi (Kobe University) for the CALICE collaboration Mar 12.
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
The ILD ECAL Jan th 2010 Paris Satoru Uozumi (Kyungpook Natl. Univ.) for the ILD ECAL group.
I.Laktineh IPNL. Outline  Technological Prototype Present activities To-do List Complementary R&D  SDHCAL for ILD Simulation Optimization study Integration.
SiW ECAL Marcel Reinhard LLR – École polytechnique LCWS ‘08, Chicago.
The ILD ECAL Jan th Paris Satoru Uozumi (Kyungpook Natl. Univ.) for the ILD ECAL group Contents :
Durham TB R. Frey1 ECal R&D in N. America -- Test Beam Readiness/Plans Silicon-tungsten SLAC, Oregon, Brookhaven (SOB) Scintillator tiles – tungsten U.
A Common R&D on the new generation detector for the ILC D_R/ D_1 FJPPL CNRS 2008 May 15-16th 1 J.-C. Brient Laboratoire Leprince Ringuet.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
Sohail Amjad, Roman Pöschl LAL Orsay Guard ring studies for SiW Ecal of ILD CALICE Collaboration Meeting Cambridge/UK Sept
Vincent Boudry LLR, École polytechnique LCTW'09 Orsay 2-5 November 2009 Calorimetry Hot spots.
Hadrons in a SiW Electromagnetic Calorimeter for a Future Linear Collider Roman Pöschl LAL Orsay LHC EUDET Annual Meeting DESY Hamburg September/October.
ILC Detector Design D_R/R_1 FJPPL Project Application Akiya Miyamoto KEK FJPPL Workshop at Tsukuba May, 2009.
Taikan Suehara, Belgrade, 7 Oct page 1 Hybrid ECAL: optimization and related developments Taikan Suehara H. Hirai, H. Sumida, Y. Sudo, T.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
EUDET Annual Meeting SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
Roman Pöschl LAL Orsay Testbeam plans 2012/13 CALICE Collaboration Meeting Heidelberg September 2011.
SiD R&D Plan and Opportunities for New Collaborators
Final CALICE OsC meeting: Status and summary of project
K. Kawagoe / Kobe-U FJPPL KEK 2007 May 9th
CALICE SiW Electromagnetic Calorimeter
CALICE Silicon ECal Sensors Status and prospects
Test Beam Request for the Semi-Digital Hadronic Calorimeter
FCAL R&D towards a prototype of very compact calorimeter
SiD Calorimeter R&D Collaboration
Status of Ecal(s) for ILD
ECAL project in the future 2-3 years
ILD Optimisation: towards 2012 University of Cambridge
Scintillator HCAL: LOI issues
Simulation study for Forward Calorimeter in LHC-ALICE experiment
Michele Faucci Giannelli
Presentation transcript:

D_R / D_1 Vincent Boudry LLR, École polytechnique FJPPL'10 LAPP — Annecy 15/06/2010 A common R&D on the new generation detector for the ILC Shinshu KEK D_R / D_1

— FJPPL, LAPP, june ILC Calorimeter R&D biotope > Boson tagging in jets decay needs to optimise the di-jet mass resolution > Global Mechanical integration; Machine interface > Simulation and PFA reconstruction - to test the performances on designed detectors - to analyse the test beam data > Design calorimeter optimized on PFA performances... > Lead to ultra segmented device e.g. SiW ECAL with 120 Mchannels > Design & build ultra segmented prototypes tested with Beam ILD DBD

D_R / D_1 — FJPPL, LAPP, june Road map to DBD Aug 2009: IDAG: “At the LOI stage the progress of the Collaboration in realizing their detector concept is impressive and the path is clear for ILD to make continued progress”  Detector Design (ILD from GLD & LDC)  PFA Studies  GRID use (KEK-IN2P3)  Prototyping Ultra Segmented Calorimeter (Physical models) : “A common R&D on the new generation detector for the ILC” : “ILC Detector Design”  Detector design (ILD), including MDI Integration  PFA improvements with realistic models (dead material, services,...)  Prototyping Ultra Segmented Calorimeter (Technological models) ✔ ILD LOI (March 2009) → 2012 ILC proposal Japan-France collaboration on ILC detector R&D:

D_R / D_1 — FJPPL, LAPP, june Main members & meetings France (+2010) H. Videau, C. Clerc, J.C. Brient, V. Boudry, Marc Anduze, M. Frotin, R. Cornat (LLR) R.Poeschl, M. Joré (LAL) Japan K. Kawagoe (Kobe-U) T. Takeshita (Shinshu-U) S. Yamashita, T. Suehara (U-Tokyo) A. Miyamoto, T. Tauchi, Y. Sugimoto, H. Yamaoka (KEK) Meetings (*) 03—05 nov 2009, LCTW'09 (LAL, Orsay) : preparing the future ILC R&D TB program 10—12 jan 2010, “France Asia” meeting (Shinshu U. & KEK): Discussing hybrid ECAL, reconstruction, ILD MDI and future Si sensor cooperation Jan 27 th –29 th, 4 th ILD WS (LLR Palaiseau & Paris) : preparing the simulation for 2012 DBD + // meetings on SW & MDI 6—8 July 2010: ILD SW & integration meeting DESY Sept 2010: Shinshu U. : discussion with Hamamatsu for Si sensors dev t (*) = + frequent (bi-monthly) video-conf

D_R / D_1 — FJPPL, LAPP, june ILD Design 3x Dbl. Layer VTX Support of BP/VTX/SIT Forward Component Box support option B=3.5T, RECAL=1.85m

D_R / D_1 — FJPPL, LAPP, june MDI studies Development of ILD technical design is the major task of coming years. Issues includes ▶ Design of coil, cryostat, and structure; stability (vibrations) ▶ Push-pull scenario: mechanical & optimisation of ℒ losses ▶ Detector integration and maintenance LLR and KEK members are heavily involved in MDI and Integration of ILD. The issues will be studied in this program

D_R / D_1 — FJPPL, LAPP, june The ILD ECAL ▶ Finely granular PFA calorimeter with tungsten absorber ▶ Cell-size in baseline design ~ 5 x 5 mm² → ~100M cells in total ▶ Necessary to achieve less dead space, low production cost Candidate technologies : Silicon-tungsten Scintillator-tungsten MAPS/DECAL (UK only) Jet Energy Resolution by M. Thomson Barrel: 5 octogonal wheels R min = 1808 mm; R max = 2220 mm Width = 940 mm End-caps: 4 quarters ∅ min = 800 mm

D_R / D_1 — FJPPL, LAPP, june Scintillator Strip ECAL were originally developed in GLD and its simulator model and strip-clustering code were developed by using Jupiter and Satellites. → After LOI completion, ScECAL model were defined in Mokka and now analized by Marlin. It makes the comparison of performance easy.

D_R / D_1 — FJPPL, LAPP, june Strip Scinti-ECAL Clustering by Katsushige Kotera Position resolution of 10 GeV photon were studied with Strip-Scinit. ECAL Strip of 45mmx5mm size shows better resolution than tile of 15mmx15mm. Now, investigating jet energy resolution.

D_R / D_1 — FJPPL, LAPP, june Analysis tools Simulation of ScECAL in MOKKA Reconstruction ▶ GARLIC clustering (γ finder) developped for SiECAL → ScECAL ▶ Root based DRUID Event display based on a modified MOKKA version ◆ Shower analysis in Highly Granular calorimeter

D_R / D_1 — FJPPL, LAPP, june Silicon-tungsten ECAL ILD Structure –20 layers of 2.1 mm (0.6X 0 ) W + 9 layers of 4.2mm (1.2X 0 )W –5x5 mm 2 granularity of Si ~ 108 M cells in total 10x10 mm 2 physics prototype tested in beam –Energy resolution measured in test beam ~ 16.6%/√E(GeV) ⊕ 1.1% with S/N ratio of 7.5 for a mip signal –CERN (2006, 2007), FNAL (2008) Remaining hardware R&D issues –Power pulsing of FE electronics (common issue also for Sci ECAL) –Si sensor cost reduction … need 2400 m 2, current price 10 euro/cm 2

D_R / D_1 — FJPPL, LAPP, june Scintillator-tungsten ECAL Cost-effective scintillator strip calorimeter aiming to have virtual cells by x-y strips crossing. Beam tests of the physics prototype have been performed to prove feasibility. –DESY 2007 (small prototype) –FNAL 2008, 2009 (test with AHCAL) ILD structure –Scintillator strips with 5 mm width 2 mm thick without WLS fiber –3 mm tungsten, ~21 X 0 in total Study of “strip-clustering” underway with realistic simulation Remaining Hardware R&D issues : –Study of 5 mm width scintillator-strip without WLS fiber –Dynamic range of photo-sensor –Establish design of the photo-sensor gain calibration system Scintillator strip (4.5 x 1 x 0.3 cm) MPPC WLS fiber 18 cm 72 strips x 30 layers

D_R / D_1 — FJPPL, LAPP, june Toward a Hybrid ECAL Shinshu University, Matsumoto 10-11, Jan SiScECAL Meeting at Shinshu Univ. (Jan. 2010) we developed a plan to study a Hybrid ECAL Study items include ▶ Hardware design ▶ Configuration optimization ▶ Physics performance

D_R / D_1 — FJPPL, LAPP, june Possible baseline design of the ILD ECAL 2 possible models ▶ Silicon pads in pre-shower and shower-max region ▶ Scintillator layers after the shower max. ▶ Alternative: Si layers interleaved in scintillator layers ◆ Cost-effective ◆ No two-fold ambiguity for the strip clustering with silicon sensors ◆ Can use established the silicon and Scintillator ECAL technologies. ▶ Need extensive simulation study to determine configuration of Silicon / Scintillator layers ▶ Specific cell & strip combined clustering must be developed. ◆ Adaptation of GARLIC to strip under way. Mokka simulation of the hybrid-type ECAL under preparation. Two-fold ambiguity with strip clustering Si pads (5x5 mm 2 ) Scint strips (5-10 x 45 mm 2 )

D_R / D_1 — FJPPL, LAPP, june Si-W ECAL prototype “EUDET” module Design guide lines ▶ Test technological solutions for ILD ECAL ▶ Mechanical structure close to ILD detector module ▶ Readout chips integrated within the detector volume ▶ Demonstrator done; full structure in preparation 550 mm 1510 mm Composite Part with metallic inserts (15 mm thick) Thickness : 1 mm ILD ECAL module

D_R / D_1 — FJPPL, LAPP, june The EUDET prototype Silicon module Scintillator module The EUDET alveolar structure can accommodate both Si / Sci ECAL modules. Discussion underway to make the compatible structure. PCB Heat shield Scintillator W slab Photo-sensor Construction of the mechanical structure by end Implement detector modules ~ mid Future beam tests from ~ Si + Sci module test - Validate power pulsing - Test simulation with finer granularity

D_R / D_1 — FJPPL, LAPP, june Si Sensor studies Edge optimisation (Guard ring coupling, size, simplification, …) Cost reduction (7-8$ / cm² → 2-3$/cm² for 2400 m²)

D_R / D_1 — FJPPL, LAPP, june Summary Both French and Japanese group are members of ILD ILD LOI was validated last September. We were requested to proceed towards Detailed Baseline Design (DBD) by DBD is to define a baseline design based on proved technologies and demonstrate a physics performance based on a realistic simulator model including faults and limitation. For ECAL in ILD, ▶ Japanese group has been working Scintillator Strip calorimeter, ◆ implementing the model in Mokka which was developed by LLR. ◆ developing the digitizer and clustering code of strip readout, communicating with Daniel Jeans (LLR) ▶ French group has been studying Si readout ECAL. ◆ Mokka and ECAL geometry driver has originally developed at LLR. ◆ Using SiECAL, GARLIC (γ reconstruction) and DRUID (event display) has developed, which will be used also by Japanese group. ▶ Now developing Hybrid ECAL ( Mixture of SiECAL and ScECAL) ▶ Cooperation on Si Wafer being started

D_R / D_1 — FJPPL, LAPP, june The Japanese-French collaboration in R_D/D_1 has been very useful One of the driving force : ▶ on common work on simulation, optimization, and benchmarking of ILD detector concept. ▶ on development of technically feasible high granularity ECAL for the ILD It will be mandatory for the development of the ILD technical design in the ILC TDR/DBD era. ▶ Study and design of detector integration ▶ Complete PFA study of strip ScECAL and hybrid ECAL and studies with more realistic model. ▶ Proto-typing of ultra segmented calorimeter Somewhat less active in 2009 after the LoI (TB of ScECAL at FNAL, realisation of EUDET structure) ▶ Very promising cooperation channels for 2010 with hybrid ECAL, and Si wafer R&D Outlook