TOF Update GlueX Collaboration Meeting Jefferson Lab May 12, 2009 Paul Eugenio & Alexander Ostrovidov Florida State University.

Slides:



Advertisements
Similar presentations
Cosmic Ray Test of INO RPC Stack M. Bhuyan 1, V.M. Datar 2, S.D. Kalmani 1, S.M. Lahamge 1, N.K. Mondal 1, P. Nagaraj 1, S. Pal 1, L.V. Reddy, A. Redij.
Advertisements

T958! Fermilab Test beam experiment to study fast timing counters for FP420 MOU between UTA, Alberta, Louvain, Fermilab (Brandt spokesman) Data taking.
Collaboration Meeting, Oct : Start Counter Start Counter Eric Pooser W. U. Boeglin L. Guo P. Khetarpal Experimental Setup SiPM Scan Attenuation Lengths.
Construction and First Results of a Cosmic Ray Telescope M. P. Belhorn University of Cincinnati 12 June 2008.
FToF Status Report CLAS Collaboration Meeting1 Test Results, Ongoing Work, Still To-Do, and More … FToF Progress Report CLAS Collaboration Meeting June.
M. Bonesini - 3/10/061 M. Bonesini INFN Milano Some results from BTF testbeam on TOF.
1 Analysis of TOF data Yordan Karadzhov St.Kliment Ohridski University of Sofia.
M. Bonesini - 08/06/06 Fermilab1 M. Bonesini INFN Milano MICE TOFes construction & planning.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
MICE CM17 Feb 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM16 o Detector DAQ software o Front End Electronics o Schedule Milestones o.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
Andrea Giammanco CMS Tracker Week April DS ROD Prototype: “final” optohybrids “final” CCUM integrated in the rod with new FEC_to_CCUM adapter (Guido.
1 M. Bonesini - CM 25 RAL 5/11/09 PID status report M. Bonesini Sezione INFN Milano Bicocca.
Update on the Gas Ring Imaging Cherenkov (GRINCH) Detector for A 1 n using BigBite Todd Averett Department of Physics The College of William and Mary Williamsburg,
Forward TOF Prototyping Ryan Mitchell GlueX Collaboration Meeting November 2005.
Mott DAQ Speed December 18, How to speedup DAQ I.Reject low-energy electrons before reaching DAQ: 1.Increase E-detector hardware threshold 2.Vetoing.
M. Bonesini - MICE CM18 RAL 16/06/071 M. Bonesini INFN Milano Updates on TOF project.
Central Neutron Detector March ’11 Update Central Neutron Detector March ’11 Update Daria Sokhan IPN Orsay CLAS 12 GeV Workshop Paris, France – 9 th March.
Detectors - what detectors are available diamond / silicone - transport / shipping - 3 ROCs at UT? ROC Operation / Readout Modules (ED) - what modules.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
PHOBOS TOF Construction Status
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
FLC Group Test-beam Studies of the Laser-Wire Detector 13 September 2006 Maximilian Micheler Supervisor: Freddy Poirier.
DE/dx measurement with Phobos Si-pad detectors - very first impressions (H.P Oct )
CLAS12 activity at IPNO D2I: Design, realization and test of the Central Neutron Detector J. Bettane, J.L. Cercus, B. Genolini, G. Hull, M. Imre, A. Maroni,
06/07/041 F1TDC Status Update Hall D Collaboration Meeting Indiana University – Bloomington, IN May 20-22, 2004 Fernando J. Barbosa
“End station A setup” data analysis Josef Uher. Outline Introduction to setup and analysis Quartz bar start counter MA and MCP PMT in the prototype.
Julien Bettane, Giulia Hull, Silvia Niccolai, Daria Sokhan 31/1/2012 Status and commissioning plan for the Central Neutron Detector.
Summary talk of Session 6 - Electronics and Interfacing to AD DAQ - Mechanics for the Demonstrator for the AD ancillary detector integration team: for.
MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien.
Start Counter Collaboration Meeting September 2004 W. Boeglin FIU.
TOP counter overview and issues K. Inami (Nagoya university) 2008/7/3-4 2 nd open meeting for proto-collaboration - Overview - Design - Performance - Prototype.
Hadron Calorimeter HCAL-J GEp Electron Calorimeter BigCal Hadron Calorimeter 1 G. Franklin, Carnegie Mellon University 10/13/2011.
1/10/2016Collaboration Meeting Feb 2011 Start Counter 1 Start Counter Update W. U. Boeglin L. Guo E. Pooser Measurements on EJ-212 scintillator bars Attenuation.
Methods to reduce dead time and achieve higher trigger rate. Sparsification Event blocking Parallel DAQ systems SFI Sequencing.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
first results from EMCal test beam
M. Bonesini - MICE PID review 12/10/061 M. Bonesini INFN Milano TOF upstream PID review (TOF0/1)
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
TOFp Status Report Introduction: system overview Functional requirements Analysis status –track extrapolation & matching –start time –stop time –identified.
FT Prototype Test Purpose: test the prototype of the FT Calorimeter and Scintillator Hodoscope Technique: prototype is installed under the Hall B photon.
External Trigger System PAB To provide straight muon track efficient selection for TPC performance characterization Adjustable geometry for.
IFR Status Report W. Baldini, on behalf of the Ferrara SuperB-Group XIV SuperB General Meeting, Frascati Sept.27 – Oct
Status Report of Tile Calorimeter at Korea Calorimeter meeting 2005/6/13 Youngdo Oh Kyungpook National University.
Simulation and reconstruction of CLAS12 Electromagnetic Calorimeter in GSIM12 S. Stepanyan (JLAB), N. Dashyan (YerPhI) CLAS12 Detector workshop, February.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
1 The Scintillation Tile Hodoscope (SciTil) ● Motivation ● Event timing/ event building/ software trigger ● Conversion detection ● Charged particle TOF.
Focal Plane Scanner Jie Pan * + for the scanner working group Laura Cobus*, Anna Micherdzinska* Jeff Martin*, Peiqing Wang + * University of Winnipeg /
1 TOF Performance By: Bradford Cannon Florida State University GlueX Collaboration Meeting October 9, 2015.
IFR Detector R&D status
IFR Detector R&D status
"North American" Electronics
Jean-Sebastien Graulich, Geneva
Upgrade of the scintillator testing station in Prague
IFR Status Summary W. Baldini on behalf of the IFR Group
SHiP straw tracker prototype tests
Prototype activities update
ROBOX modification plans
IFR detector mechanics
CLAS12 Forward Detector Element PCAL
Conceptual design of TOF and beam test results
Fernando J. Barbosa F1TDC Status Update Hall D Collaboration Meeting Indiana University – Bloomington, IN May 20-22, 2004 Fernando J.
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
Particle ID Diagnostics in the MICE Beamline
Efficiency Study of Prototype Scintillator for INGRID
Testbeam status report
Collaboration between Hall C and Hall D
Presentation transcript:

TOF Update GlueX Collaboration Meeting Jefferson Lab May 12, 2009 Paul Eugenio & Alexander Ostrovidov Florida State University

Current TOF efforts 2 ● Study new PMTs ● Study and understand single paddle performance ● Further develop readout optics – Finalize light guide design and/or scintillator bar dimensions ● Investigate construction techniques – Develop assembly and quality assurance procedures ● Continue software reconstruction development

Single paddle construction for test set-up 3 ● Tyvek wrapped ● trapezoidal light guide – 6 cm -> 4.6 cm ● EJ-500 optical joints

Light-tight test set-up 4 ● ~3 meter light-tight box ● precision PMT holders ● 1 cm x 6 cm and 4 cm x 6cm scint. telescopes for triggering ● plan to tighten trigger after set- up debugging.

Trigger telescope 5 1 x 6 cm scint.4 x 6 cm scint

Test DAQ system ● VME 64X crate ● Caen vx1718 VME bridge ● Caen v812 CFD ● F1TDC Module ● developed working interface ● Caen V265 ADC ● plan to replace w/ FADC + Caen VME scalers & Misc. NIM electronics 6

Light guide prototyping Hamamatsu H10570SEL pmt & mu-metal sleeve 2.385” OD scint. bar 100” x 1” x 2.362” DOM 1040 steel tube 3.00”/2.75” OD/ID Open Issue Iron shielding extends out beyond 7 cm O.D. - cannot use straight fish tail light guides on 6cm scint. bars Open Issue Iron shielding extends out beyond 7 cm O.D. - cannot use straight fish tail light guides on 6cm scint. bars minimum 3mm thick iron shield is required 7

8 Light guide prototyping development of a fish-tail + straight bend light guide cylindrical rod 4.6 cm OD x 10 cm fish-tail 7 cm length straight bend 2.54 x 6 x 12 cm ~90 cm r.o.c

9 Prototype construction ● 2 piece construction – 12x2.54x6 cm – 7+10 cm fish-tail ● developed bending jig for straight piece – 90 cm radius of curvature ● Lucite bending – 350 o F for ~45min ● Plan for one piece construction bending jig

10 Prototype light guide

11 First timing measurements with a single TOF paddle Alexander Ostrovidov (FSU) Preliminary TDC timing measurements with cosmic rays: a single 254cm x 6 cm x 2.54 cm EJ-200 scintillator paddle trapezoidal lightguides wrapped in Tyvek XP2020UR PMT (12-stage) on both ends different trigger paddle(s) configurations Purpose of the current study: develop a procedure for timing measurements setup and debug DAQ and electronics compare with previous measurements from IU/Protvino prepare for comparison of different PMTs, lightguides, paddle geometries and wrappings

12 Setu p 4cm trigger 1cm trigger 1cm/4cm telescope Cosmic rate: 2000ev/hr 500ev/hr 50ev/hr

13 F1 TDC notes We had to convert Dave Abbott's F1 TDC library from the memory-mapped mode into unmapped (“function calls”) one to use with our VME bridge Some time was spent to understand and find a workaround for two “solvable” issues: Initializing TDC with front panel signals present does not produce an error but results in no data. This is solved with a “switch to backplane – initialize – switch to front panel” trick. Occasionally, the same event gets stuck for a few minutes. Presumably, this happens when another TDC Start arrives before the previous TDC Stop. This is possible because we are using TDC in non-synchronous mode with a simple trigger logic. For now, the kludge is to remove repeating identical events in software.

TDC signal from a single (left) PMT x = 50in (paddle center) 14

Mean TDC value vs position for a single PMT 1. Results are shown for 4cm trigger paddle 2. Delays for left and right channels are not equalized yet 15

Time resolution vs position for a single PMT Results are shown for 4cm trigger paddle No obvious position dependence Trigger resolution seems to dominate any contribution from light attenuation 16

Time Difference (T R -T L )/2 at the paddle center 17

Average Time (T R + T L )/2 at the paddle center 18

Time Difference and Average Time vs position Results are shown for 4cm trigger paddle From the slope, c scint =15 cm/ns (IU has measured 16 cm/ns) Variations of ~500ps are comparable to σ Tav 19

Resolution of ΔT and T av vs position Results are shown for 4cm trigger paddle Note: for 1cm/4cm tel. trigger, preliminary measurement of σ ΔT is ~150ps 20

Stability over a long time period Events were taken at the paddle center (x=50in) with 1cm/4cm tel.trigger over 72 hours 21 Good news: 1ns variations I saw previously with a pulser are down to 100 ps Bad news: 100 ps is still not zero...

Preliminary conclusions 22 We have a working setup to conduct measurements in order to establish an optimal paddle/PMT configuration for TOF. With XP2020UR and default paddle geometry, a signal is reliably detected over the whole 254cm paddle length. TDC time dependence on position is linear as expected, with a measured effective c = 15 cm/ns. With our best trigger paddle configuration, a time difference resolution of 150 ps was achieved. This is slightly worse but still comparable to the previous IU measurement of ~100 ps for a similar configuration. We may try to improve our trigger by going to 1cm/1cm telescope. We still need to understand the source of 100 ps timing instability because it is comparable in magnitude with the expected resolution.

Ongoing Efforts ● Finalize light guide design ● Study and understand single paddle performance ● Continue investigation of construction techniques – Develop assembly and quality assurance procedures ● Continue software reconstruction development