Run 16 RHIC Machine/Experiments Meeting March 1, 2016 Agenda: Run 16 Power use/cost (Christie) Short presentation by PHENIX (Denis Jouan) AOB READYTALK.

Slides:



Advertisements
Similar presentations
Run8 – Coming sooner than we had thought Mike Leitch Run8 Coordinator November 7 th /7/20071MJL.
Advertisements

Run 15 RHIC Machine/Experiments Meeting 7 Apr 2015 Agenda: Run 15 Schedule (Pile)
Run 14 RHIC Machine/Experiments Meeting 27 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run 9 polarized proton Log 9 Jan begin 45 degree cool down from room temp (3 MW-NEW) 2 Feb, Cool-down to 4.5 degrees begins 5 Feb, Blue ring cold but still.
RUN 12 RHIC MACHINE/EXPERIMENTS MEETING 18 October 2011 (1 st meeting) Agenda: Schedule issues (Pile) Machine Status (Fischer) STAR Readiness PHENIX Readiness.
Run 12 RHIC Machine/Experiments Meeting 3 Jan 2012 (4 th meeting) Agenda: Run 12 Priorities.
Run 12 RHIC Machine/Experiments Meeting 24 Jan 2012 (5 th meeting) Agenda: G  for 100 GeV pp run 100 GeV pp Lumi Goals Power Update.
Run 11 as run 3 Jan, Begin cool-down to 4.5K 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins 24 Jan, 1 week Ramp-up with 8 hr/night.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
Run 12 RHIC Machine/Experiments Meeting 29 Jun 2012 Run 12 Summary Slides.
Run 13 RHIC Machine/Experiments Meeting 21 May 2013 Agenda: Status Reports.
Run 13 RHIC Machine/Experiments Meeting 4 Jun 2013 Agenda: Status Reports Hydrogen Jet issue (Eyser)
 Safety  Schedule: Past, Present and Future  RHIC and Experiment Reports  Machine and System Reports  AOB.
1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?
Run 15 RHIC Machine/Experiments Meeting 30 Sep 2015 Run 15 Summary Slides 1.
15 May 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Experiment Issues PHENIX (Leitch) STAR (Christie) Monopole.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Dec 27) – Dec. 1, Begin cooldown to 4.5K – Dec. 4, Cooldown to.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run 14 RHIC Machine/Experiments Meeting 3 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
General Status of STAR pp run as of June 1, pb -1 delivered ~1.78 pb -1 sampled 292 nb -1 delivered ~ 93 nb -1 sampled (93/180 ~ 52%) N.B
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
Run 12 RHIC Machine/Experiments Meeting 28 Feb 2012 Agenda: Discussion - when to end the 200 GeV pp run… presently scheduled to end early Friday morning,
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
Run 13 RHIC Machine/Experiments Meeting 9 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited again.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
27 Mar 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Machine Issues - (Drees) –Experiment Issues PHENIX (Leitch)
Run 12 RHIC Machine/Experiments Meeting 7 Dec 2011 (3 rd meeting) Agenda: Run 12 Priorities.
26 May 2015 Run 15, Time Meeting Agenda: Take 5 for safety E. Lessard Schedule P. Pile Linac Status D. Raparia AGS Status V. Schoefer Cryo Status R. Than.
STAR Run 16 Schedule Zhangbu Xu Machine/Experiment Schedule Meeting 01/05/2016.
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
Run 16 RHIC Machine/Experiments Meeting 5 Jan 2016 Agenda: Run 16 Schedule (Pile) AuAu Run Plan (Gu) Projections for deuteron-gold energy scan (Liu) STAR.
Bill Christie For the STAR Collaboration January 5, Outline Detector configuration for Run 16 Data set Goals Desired luminosity profile for Run.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
Run 14 RHIC Machine/Experiments Meeting 6 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 7 Jun 2011 Agenda: √s = 200 GeV AuAu progress 27 GeV Run (or other)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 31 May 2011 Agenda: √s = 200 GeV AuAu progress Update on 250 GeV integrated Lumi.
Time Meeting March 29, W. Christie Blue Ring Magnet String issue: -on Friday morning 7am (18 March 2016) a problem developed in the RHIC Blue ring.
Run 13 RHIC Machine/Experiments Meeting 2 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited (A. Dress)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 29 Mar 2011 Agenda: Open.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 22 Mar 2011 Agenda: Open.
Run 16 plan based on 20 weeks cryo operation and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015 Today, 1 March 19 Jan, Begin.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Jan 12) – Dec. 1, Begin cool down to 4.5K – Dec. 4, Cooldown to.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
CALENDAR YEAR PLAN JANUARY FEBRUARY MARCH APRIL MAY JUNE.
Run 12 RHIC Machine/Experiments Meeting 6 Mar 2012 Agenda: Status reports Other business.
Run 14 RHIC Machine/Experiments Meeting 24 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
January 2014 Sunday Monday Tuesday Wednesday Thursday Friday Saturday
School Year Scheduling
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
Calendar 2017.
Before and After.
DAYS OF THE WEEK.
Run16 Y. Akiba.
Calendar of 2012 ESL Lesson on Months.
A Class Calendar in PowerPoint
JANUARY 2018 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
Number of visitors to the library.
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
Unit 1: Quick Quizzes After 5,13
SEPTEMBER 2014 Unit 1 Unit 1 Unit 1 Unit 1 Quick Quiz 9,16, 21 Unit 1
SEPTEMBER ½ Day Unit PLC
JANUARY 2018 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
January 2015 Sunday Monday Tuesday Wednesday Thursday Friday Saturday
| January Sunday Monday Tuesday Wednesday Thursday Friday
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
Contact
Reviewing Abbreviations
January Monday Tuesday Wednesday Thursday Friday Saturday Sunday 30 31
Presentation transcript:

Run 16 RHIC Machine/Experiments Meeting March 1, 2016 Agenda: Run 16 Power use/cost (Christie) Short presentation by PHENIX (Denis Jouan) AOB READYTALK LOGIN INFO Audio Login Toll-Free (US & Canada): Toll: Access Code: ReadyTalk link

RHIC Energy Use is ~ the same as previous years

Balanced Billing for the lab +$1340K (ahead) Sep through Jan 2016 For posting on bulletin board by Caitlin’s office

Historical Electricity Cost Data Power Cost was low in January last year as well, and then jumped up, this year ??

Run 16 plan based on 20 weeks cryo operation and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015 Today, 1 March 19 Jan, Begin cool-down to 4.5K 25 Jan, Beam in Yellow Jan, Beam in Blue 29 Jan, Feb 3, First Collisions 5 7 Feb, Begin 10 week √s=200 GeV/n AuAu physics run April, End 10 week √s=200 GeV/n AuAu physics run April, Begin 1.4 week √s=20 GeV/n dAu physics run April, End 1.4 week √s=20 GeV/n dAu physics run 29 April, Begin 1.4 week √s=39 GeV/n dAu physics run 9 May, End 1.4 week √s=39 GeV/n dAu physics run 12 May, Begin 0.9 week √s=62 GeV/n dAu physics run 18 May, End 0.9 week √s=62 GeV/n dAu physics run 21 May, Begin 0.9 week √s=200 GeV/n dAu physics run 27 May, End 0.9 week √s=200 GeV/n dAu physics run 29 May, Begin 5 day E=40 GeV/n Au CEC physics run 3 June, End 5 day E=40 GeV/n Au CEC physics run 3 June, begin cryo warm-up 7 June, cryo warm-up complete, 20.0 cryo weeks of operation See for the Run Coordinator’s detailed planhttp:// dAu setup time as per Chuyu 1/6/16 Actual physics time for each energy is TBD dAu schedule as proposed by PHENIX, scaled to 4.7 total physics weeks Schedule in Orange text not updated yet

Archive

From Fischer et. al., RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015 PHENIX goals: 10 weeks, 1.8 nb -1 with 12 billion MB events recorded within |z|< 10 cm vertex, request dynamic  * squeeze. STAR goals: 13 weeks 10 nb -1 sampled for MTD and 2 billion MB events recorded within |z| < 6 cm for HFT

SCHEDULE FOR WEEK FROM MONDAY FEB. 29 TH – SUNDAY MAR. 6 TH MONDAY: - PHYSICS RUNNING TUESDAY: - PHYSICS RUNNING until 10:50 am - RHIC RING ACCESS FROM 11 AM TO 12:30 PM FOR CEC - PHENIX AND STAR ALSO GO INTO IRS - PHYSICS RUNNING FROM 12:30 PM ON WEDNESDAY: - PHYSICS RUNNING UNTIL 7:45 AM - SCHEDULED ACCESS 8 AM TO 4 PM - 4 PM ON, PHYSICS RUNNING THURSDAY: - PHYSICS RUNNING UNTIL 9 AM - BEAM DEV. 9 AM TO 7 PM (56 MHZ, XFER FTN. CORRECTION, S*, CEC APERATURE SCAN) - PHYSICS RUNNING 7 PM ON FRIDAY THROUGH WEEKEND: - PHYSICS RUNNING

Who’s Who for 2016 RHIC 100 x 100 GeV AuAu: Run Coordinator: Xiaofeng Gu, RHIC dAu Energy Scan: Run Coordinator: Chuyu Liu, Scheduling Physicist: Bill Christie, Assistants through 29 Jan: Yousef Makdisi, (office) Phil Pile, (office), AGS Liaison: Haixin Huang,