Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Industrial contributions to the maintenance of CERN.

Slides:



Advertisements
Similar presentations
Commissioning Approach Integrated Service Solutions
Advertisements

Cryogenics at CERN (LHC)&Helium Inventory Brief review with emphasis given on cryogen management Americas Workshop on Linear Colliders 2014 Fermilab,
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
ESS Cryogenic System Design
UNICOS-CPC applied to Cryogenics and specifications Benjamin Bradu EN-ICE-PLC February 2014.
Maintenance and Engineering Procedures and Tools at Soreq Applied Research Accelerator Facility I. Gertz, Y. Buzaglo, A. Grin, R. Michael, R. Raizman,
Process Engineer’s Role in Project Management Dr Abdullah Malik.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Dailies, Weeklies, Monthlies, PSM Maintenance - Simplify IT If you’d like to reach SCS Engineers, Tracer Environmental Division please contact us at:
1 PredictiveOnLine PREDICTIVE SYSTEMS ENGINEERING Vintec Knowledge Ltd.
H. Herzog, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN LARGE SCALE CRYOGENIC.
Maintenance Specificities in the CERN Cooling and Ventilation Group Asset and Maintenance Management Workshop CERN, November 2013 I. El Hardouz,
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Experience from large helium inventory management at CERN ILC Cryogenics and Helium inventory meeting CERN, Wed. 18 th of June 2014 D. Delikaris Technology.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
TE-CRG Activities D. Delikaris, TE-CRG.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
J. G. Weisend II for the ESS Team Energy Efficiency & Recovery at ESS.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
Cryogenics Fault Tree A. Niemi & E. Rogova. Contents 1.Introduction of the current tree structure 2.Failure rates observed in 2015 failure data 3.Unsure.
LCLS-II Cryoplant Overview
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
O. Kester, NuSTAR annual meeting, 27/02/2013
5-year operation experience with the 1.8 K refrigeration units of the LHC cryogenic system G. Ferlin, CERN Technology department Presented at CEC 2015.
ESS Cooling System - Interface with RFQ 1 John Jurns Cooling System Engineer.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
H. Hayano(KEK), B. Petersen(DESY), T. Peterson(FNAL),
TE-CRG Activities A. Perin, on behalf on the Cryogenics Group.
Cryoplant Controls Installation
I. Bergevoet - Training preparation
Installation of the T600 at Fermilab
Cryomodule test stand at ESS site
He Plant, LN2 Systems and Commissioing
Machine operation and daily maintenance management in SOLEIL
Performance monitoring framework for the technical infrastructure
FRIB Cryogenic Support
IT-4189 Supply and installation of a cryogenic distribution system
Internship final presentation
Innovative He cycle Francois Millet.
Cryoplant Installation Scope
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
SPS cryogenic proximity equipment and SM18 validation
Hollow e- lens, Cryogenic aspects
CRYOGENICS OPERATIONS 2008 Organized by CERN
Status of the cryogenic system for B180
UK RFD Pre-Series cryomodule
Low temperature chiller Market Survey
The Fermi National Accelerator Laboratory is a U. S
Mathew C. Wright January 26, 2009
CERN with UNICOS M. Pezzetti AT_ECR_CE 27 June 2005.
ILC Experimental Hall Cryogenics An Overview
Maintenance at ALBA facility: Strategy for the conventional services
Overarching Commissioning Plan
Operator Training Requirements
SNS Cryoplant Commissioning Past Experiences
Cryomodules Challenges for PERLE
Onsite Training at JLab
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
Review of hardware commissioning
Laurent Delprat CERN, Geneva, Switzerland
Presentation transcript:

Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Industrial contributions to the maintenance of CERN helium cryoplants F. FERRAND & F. BARACCO On behalf of ALLS maintenance team 22th-26th September 2008

Cryogenics Operations 2008, CERN, Geneva, Switzerland 2 Contents Cryogenic maintenance overview Focus 1: Develop predictive maintenance - Vibration analysis Focus 2: Develop reporting tools - Mobile devices for instrumentation Focus 3: Spare parts selection 22th-26th September 2008

Cryogenics Operations 2008, CERN, Geneva, Switzerland 3 Cryogenic maintenance overview: Scope of work 5 Local Control rooms + 1 Central Control Centre 23 main cryogenic 12 Magnet Test Bench 81 screw compressors and high voltage motors (160kW to 1,8MW) 22 medium and high pressure compressors (45 to 600kW) 300 vacuum pumps 100 gas turbines & cold compressors 1’000 cryogenic valves for refrigeration units 120 large GHe vessels 30 large LN2 vessels 65’000 I/O signals treated by industrial control 5’000 instrumentation materials 3’000 pressure safety valves 22th-26th September 2008

Cryogenic labs & none LHC Experiments LHC cryogenics Beam & Experiments Cryogenics Operations 2008, CERN, Geneva, Switzerland 4 Cryogenic maintenance overview : Yearly schedule Warm up Standard Operation -LHC Preventive plan Winter Maintenance Shut Down Cool down -Curative maintenance intervention: Work Orders -Store management -CMMS deployment -Preparation of LHC Shut Down -Preventive plan Warm up Operation Spring/Summer Maintenance Shut Down Cool down Operation Result Orientated O& M contract 22th-26th September 2008

External contractorCERN Departments Cryogenics Operations 2008, CERN, Geneva, Switzerland 5 Cryogenic maintenance overview : Internal Vs External - INSTRUMENTATION - Measurement calibration - Control valves calibration - Gas analysers calibration - Electrical maintenance - MECHANICAL - Preventive maintenance plan - Predictive vibration & oil analysis - Safety valves follow-up & repair - VACUUM - Preventive maintenance plan - Gauge calibration - Pumps maintenance - Leak detection - Vacuum pumping & conditioning - METHODOLOGY - CMMS deployment - Spare parts procurement - Store management - Continuous improvement Control - Supervision - Automation CERN safety - Pressurized vessels - Safety Valves control Instrumentation - Tunnel instrumentation Utilities - Water cooling - Power supply Mechanical Support - Re-engineering - Retrofit CERN TS - CMMS administration Maintenance interface & coordination 22th-26th September 2008

Cryogenics Operations 2008, CERN, Geneva, Switzerland 6 Cryogenic maintenance overview : Contractor team organization Mechanical Management Operation Team leader Maintenance Team leader Equipment 1 Vacuum Equipment 2 Instruments Equipment 3 Spare part Procurement & storage Helium cryogenics Technical specialists organised by field Process orientated staff organised by equipment or plant section Day + Standby duty Shift + Standby duty External contractors Corporate Technical Support 22th-26th September 2008

Cryogenics Operations 2008, CERN, Geneva, Switzerland 7 Cryogenic maintenance overview : Industrial contributions Erection & Commissioning Cryogenic test RUN Equipment list consolidation Criticity study CMMS Arborescence Support major Overhauling Deploy CMMS Spare parts selection Spare parts procurement Large scale cryogenic operation for LHC and Experiments Develop maintenance plan Curative maintenance Preventive maintenance Develop predictive methods Develop plant follow up Create maintenance DB Develop Reporting tools Improve practices Future…Present Store centralization project Not so far away Methods Spare parts Organization Field work Expertise Cost optimization 22th-26th September 2008 Work Orders system Implement KPI Increase reliability Increase availability Develop predictive methods Develop Reporting tools Spare parts selection

Cryogenics Operations 2008, CERN, Geneva, Switzerland 8 Contents Cryogenic maintenance overview Focus 1: Develop predictive maintenance - Vibration analysis Focus 2: Develop reporting tools - Mobile devices for instrumentation Focus 3: Spare parts selection 22th-26th September 2008

Cryogenics Operations 2008, CERN, Geneva, Switzerland 9 Focus 1: vibration analysis Scope of work »Screw compressors  Power above 250kW LHC accelerator: 63 compressors all considered as critical LHC Experiments: 10 compressors all considered as critical Labs & testing areas: 8 compressors »Proximity piping vibration level measurement Measurement methodology »Manual measurement with mobile spectrometer »Monthly measurement basis »Specific campaigns for oil pumps and large vacuum equipments 22th-26th September 2008

Cryogenics Operations 2008, CERN, Geneva, Switzerland 10 Focus 1: vibration analysis V H A 12 physical points / 14 effective points (« multiplexing ») 22th-26th September 2008

Cryogenics Operations 2008, CERN, Geneva, Switzerland 11 Focus 1: vibration analysis Level measurement  Indicators according to ISO  81 machines x 12 points = 972 indicators per month !!! 22th-26th September 2008

Cryogenics Operations 2008, CERN, Geneva, Switzerland 12 Focus 1: vibration analysis General Key Point indicators 22th-26th September 2008

Cryogenics Operations 2008, CERN, Geneva, Switzerland 13 Contents Cryogenic maintenance overview Focus 1: Develop predictive maintenance - Vibration analysis Focus 2: Develop reporting tools - Mobile devices for instrumentation Focus 3: Spare parts selection 22th-26th September 2008

Cryogenics Operations 2008, CERN, Geneva, Switzerland 14 Focus 2: mobile devices for instrumentation Field technician on siteOperators in control Rooms Relevé des données sur la supervision Liaison téléphonique avec le technicien de terrain Cell Phone to get information from supervision Température, pressure, 4-20mAmps signal… 22th-26th September 2008

Cryogenics Operations 2008, CERN, Geneva, Switzerland 15 Focus 2: mobile devices for instrumentation 22th-26th September 2008

Cryogenics Operations 2008, CERN, Geneva, Switzerland 16 Focus 2: mobile devices for instrumentation SCAN Memory Card 8Go Unicos Calibration history available in mobile device  Batch Real Time data available through supervision network  Online Automatic copy Maintenance DB Field technician Read only Read/write Read/write - Synchro Manual typing signal 4-20mA Simulated Pressure Signal 4-20mA F. FERRAND & F. BARACCO, 22th-26th September 2008

Cryogenics Operations 2008, CERN, Geneva, Switzerland 17 Focus 2: mobile devices for instrumentation 22th-26th September 2008

Cryogenics Operations 2008, CERN, Geneva, Switzerland 18 Focus 2: mobile devices for instrumentation Duration of shut down Data availability in maintenance DB, almost real time Processus Efficience Reliability of information, real time value checking by the data base Device adapted to field work Good feedback from field technicians and customer F. FERRAND & F. BARACCO, 22th-26th September 2008

Cryogenics Operations 2008, CERN, Geneva, Switzerland 19 Contents Cryogenic maintenance overview Focus 1: Develop predictive maintenance - Vibration analysis Focus 2: Develop reporting tools - Mobile devices for instrumentation Focus 3: Spare parts selection 22th-26th September 2008

Cryogenics Operations 2008, CERN, Geneva, Switzerland 20 Focus 3: Spare parts selection Create homogeneous equipment listings, built from various suppliers worldwide  CMMS template Criticity study  failure frequency, detection, impact 22th-26th September 2008

Cryogenics Operations 2008, CERN, Geneva, Switzerland 21 Focus 3: Spare parts selection Installations similarities, cross checking of 8000 references Budget sizing  Cost of spares Vs Cost of equipment 22th-26th September 2008 »Approach excludes capital spare parts: compressor and turbines »Ration in between 2 and 4% as a first basis

Cryogenics Operations 2008, CERN, Geneva, Switzerland 22 Focus 3: Spare parts selection Management of spare parts »Specification and procurement »Centralised warehouse project for cryogenics cryoplants spare parts  Ongoing project to be finalized end of th-26th September 2008

Cryogenics Operations 2008, CERN, Geneva, Switzerland 23 Q&A Thank you for your attention 22th-26th September 2008 F. FERRAND & F. BARACCO