Improvements to Diamond Light Source RF Amplifiers Peter Marten On behalf of the Diamond RF Group* *also C. Christou, P. Gu, M. Maddock, S. A. Pande, A.

Slides:



Advertisements
Similar presentations
ESLS 04 Daresbury Laboratory
Advertisements

IOT Measurements & Amplifier Improvements at Diamond
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
UPS Improvements to Beam Availability at the Australian Synchrotron Light Source Don McGilvery.
RF Stability Working Group Jorn Jacob (ESRF), John Byrd (LBNL) General Issues RF phase and amplitude noise –filtered by cavity and translate into timing.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
Tom Kubicki.  Booster HLRF System to be upgraded using 1kW Solid State Driver (SSD) Amplifiers.  Used to drive the 200kW Power Amplifier  Eliminates.
8th ESLS RF Workshop Daresbury September 2004 SUPER-3HC - M.Svandrlik 1 G.Penco, M.Svandrlik Operation Uptime Maintenance Performance vs filling.
Performance Improvement of APS Booster Ring Dipole Magnet Power Supplies Ju Wang The 3 rd Workshop on Power Converters for Particle.
Andrew Moss ASTeC Collaboration meeting CM29 15 th - 18 th February 2011 MICE RF System.
Performance of the Advanced Photon Source 350-MHz 1MW CW Klystrons Doug Horan RF Group Accelerator Systems Division CWRF08 Workshop March 25-28,2008.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
RF system issues due to pulsed beam in ILC DR October 20, Belomestnykh, RF for pulsed beam ILC DR, IWLC2010 S. Belomestnykh Cornell University.
Challenges of Dual Harmonic RF Systems ISIS Synchrotron Group John Thomason.
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
Operational experience of high-power RF at Diamond Light Source Chris Christou, Pengda Gu, Alun Watkins Diamond Light Source.
Automatic accident avoiding system PROJECT MEMBERS MUTHUKUMAR.K (05ME33) SAKTHIDHASAN.S (05ME39) SAKTHIVEL.N (05ME40) VINOTH.S (05ME56) PROJECT GUIDE:
Solid State RF High Power Amplifier Developments at SOLEIL Ti RUAN, on behalf of SOLEIL RF Group CWRF10 CELLS-ALBA Barcelona Spain May
STATUS OF THE SOLEIL RF SYSTEM
Jørgen S. Nielsen Institute for Storage Ring Facilities (ISA) Aarhus University Denmark 1 ESLS-RF 14 (29-30/9 2010), ASTRID and ASTRID2 new LLRF.
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
Peter Hülsmann, GSI RF-Group, Tel: Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September Paco Sanchez, RF Group, CELLS (Consortium for.
Upgrades and EM simulations for the Diamond SR HP Amplifiers
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
ALBA RF Amplifiers based on IOTs CWRF08 - CERN, March 2008 Michel Langlois & Paco Sanchez 1 Michel Langlois & Paco Sanchez.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
CWRF 2008, Geneva, March Alessandro Fabris on behalf of the Elettra RF Group Sincrotrone Trieste, Trieste, Italy. Elettra RF System Upgrade:
Operational experience of high-power RF at Diamond Light Source
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
CW and High Average Power Workshop BNL The Diamond Storage Ring IOT based High Power Amplifier Morten Jensen on behalf of the SR RF Group.
Uninterruptible Power Supply Improves Reliability at The Australian Synchrotron Sean Murphy – ARW 2013 Melbourne.
13 th ESLS RF Meeting – 1 st October 2008 DAMPY Cavity 1/20 80 kW at Dampy Francis Perez.
Diamond LLRF Activities Pengda Gu For DLS RF Group.
ALBA RF Systems Francis Perez.
Reliability of SNS Superconducting Linac April 12, 2011 Jeff Saunders SNS/ORNL.
Status of the Diamond Storage Ring RF Systems Morten Jensen on behalf of Diamond Storage Ring RF Group ESLS RF 2009.
Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark ESLS XXIII (24-25/ ), ASTRID2 facility 1.
Linac Weekly Operational Report May 9 th – May 16 th 2008.
Failure analysis experience at TLS Yi Chih Liu 15 April ARW 2013.
High Power RF Systems for 2-8 GeV Fast Cycling Synchrotron PROJECT X (ICD-2) John Reid September 11, 2009.
A CW Linac scheme for CLIC drive beam acceleration. Hao Zha, Alexej Grudiev 07/06/2016.
Reliability and Performance of the SNS Machine Protection System Doug Curry 2013.
Operation Status of the RF Systems and Taiwan Photon Source
Status of the ELETTRA RF Plants
The LEP Superconducting RF system has reached its maximum configuration of 288 four-cell cavities powered by 36 klystrons in In 2000, this system,
Digital Light Sources First introduced in 2001.
Operations Machine Simulator.
The Survey of the Power Supply Reliability at SSRF
Performances of the French synchrotron light source SOLEIL Actions to enhance the reliability of the equipment J.F. Lamarre*, E. Patry X. Delétoille, A.
Challenges of Dual Harmonic RF Systems
Storage Ring RF Systems
Overview of cavity reliability at Diamond Light Source
STATUS OF THE ALBA SYNCHROTRON LIGHT SOURCE: FROM COMMISSIONING TO OPERATION M.Pont, CELLS-ALBA
Status of RF at Diamond Light Source and overview of upgrade plans
Failure analysis at BEPCII
Developments of High CW RF Power Solid State Amplifiers at SOLEIL
Snr Power Supply Engineer
Coupling Correction at the Australian Synchrotron
RF operation of REX-ISOLDE
Commissioning the Fast Orbit Feedback System at SSRF
CEPC RF Power Sources System
PEP-II RF System Status and Upgrades
Operation Progress and Upgrade in SSRF
Durel IC Drivers All Durel drivers are available as bare die, or in MSOP8 package form in tape and reel. The Durel D340 is the smallest IC available.
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
Status of the ASTRID2 RF systems
Tuesday 20 September 2011.
IOT operation in the SPS Long term experience TWC 800 MHz
Presentation transcript:

Improvements to Diamond Light Source RF Amplifiers Peter Marten On behalf of the Diamond RF Group* *also C. Christou, P. Gu, M. Maddock, S. A. Pande, A. Rankin and D. Spink

1.RF Performance 2.Reliability Related Improvements 3.RF Noise on Infrared Beamline 4.Removal of Orbit Glitches 5.Installation of additional cavities: challenges and opportunities Agenda

IOT Performance System 2 (standby) System 1 (active) System 3 (active) Booster RF Filament hours One IOT has >55,600 hours Several IOTs >20,000 hours

E2v IOT Operating Hours 19 IOTs have provided >416,000 filament hours 1 x IOT >55,600 hours e2v IOTD2130 Two 4-IOT amplifiers driving cavities for normal operation One 4-IOT amplifier for test/conditioning/standby Single IOT booster amplifier One IOT >55,600 hours operation Several >20,000 hours

Reliability Related Improvements Filament Beam Ion Power Supplies Grid: Modified to prevent grid shorting to ground Kapton tape to installed to prevent contact Insulate edges of cover Filament: Check terminals for dry joints Inspect before installation

Booster RF Modification to e2v IOTs TED tube failure Spare “good ion pump current” TED IOTs would trip DCX Millennium amplifier modified to accept e2v IOTD2130 IOT All IOTs are now one type enabling IOT conditioning in standby system

RF noise on infrared beamline The high voltage power supply for the IOTs is a switched mode supply and as such generates noise on the voltage at the IGBT switching frequency and its harmonics Visible in HV spectrum Infra-red beamline notice the noise in their interferograms

Principal frequency components Internal enable signal to PWM generator is on a 12.8 MHz clock with a 12 bit counter Frequency visible to user through module rotation N is a user-defined parameter M is the number of operating power supply modules We expect one line per amplifier plus harmonics

Noise measured by BPM Fourier transform of BPM transverse position reveals a surprisingly rich spectrum

Identification of spectral features 50 Hz mains frequency is obvious

Identification of spectral features Other lines are not quite so obvious: Second harmonic of N = 34, M = 64 at 3418 Hz minus 6 x mains frequency = 3118 Hz Note the gap between 06:00 and 06:30

Voltage-dependent skipping of module rotation number Rotation number N jumps as phase voltage changes Principal frequency changes Out of our control

Change in module number Module number M also changes occasionally One spectral line can degenerate into four components as operating conditions change

All spectral lines can be identified Two amplifiers with different and erratic rotation parameter N and module number M 50 Hz mains frequency All intermodulations of fundamentals and harmonics are visible

Spectral noise is eliminated when module rotation is turned off Remaining features correspond to mechanical vibration Audible outside storage ring tunnel

Global stability is a concern IOTs use current modulation for amplification IOT current increases with power Module voltage droops with power Number of operating modules changes as power changes Dithering of module switching can lead to instability and beam loss Power depends on Beam current Top-up cycle ID configuration Module switching cannot be avoided

Variable dead-band in switching voltage can exclude dither in operation New user-defined parameter HYST_TH can be used to avoid module switching in operation

An alternative approach IR beamline routinely operates in two spectral ranges HVPS-induced noise is invisible when interferometer S/N is high HVPS-induced noise is drowned out by interferometer noise when S/N is low Select N and M such that no lines are present in sensitive region N = 39, M = 64 is stable and invisible in both operating modes No further complaints from beamline

Orbit glitches Glitches in beam position have been brought to our attention Glitches correspond to steps in reject power at the first combiner Looks like a small change in output power of individual IOTs One of the IOTs feeding the green reject channel is responsible

Which IOT and why? Monitor all IOT outputs on an eight channel oscilloscope Amplifier 1/3 here steps down and all other IOTs respond through LLRF All IOTs in amplifier have common high voltage and drive signal Issue is local to individual IOT Effect is explained by a dip in grid bias voltage Replacing power supply (toaster) stopped the orbit glitches

Installation of additional normal conducting cavities Normal conducting cavities to be installed upstream of IDs in straights adjacent to present superconducting cavities To be powered by IOT pairs from present four-IOT amplifiers Controlled by new digital LLRF development Coaxial transmission line 1 to run through present waveguide labyrinth Coaxial transmission line 2 to run through personnel labyrinth

Diamond MTBF Diamond MTBF has risen steadily since operations began in 2007 RF is still the greatest single source of faults RF faults are overwhelmingly amplifier faults Any tube fault shuts down the HVPS for four IOTs, causing beam loss Each IOT is a potential single point of failure Each amplifier power supply is a potential single point of failure

Resilience with two additional NC cavities Introduction of normal-conducting cavities driven by impact, time and cost of repair of failed superconducting cavity, but provide opportunities for enhancements in amplifier reliability Four IOTs combine to deliver 300 kW maximum 300 mA operation requires 450 kW Two amplifiers are sufficient Power reduced to 170 kW when one IOT is removed No longer able to support 300 mA S1 or S2 can be rephased to give 225 kW Mechanical shifter is slow, beam is lost Can save beam if IOTs can be switched individually Amplifier demand is reduced below 170 kW

IOT switching Beam survives when one IOT is manually switched out Kick is visible but stored beam is retained Component trials are underway Fast-acting MOSFET switch 50kV device from Behlke Switch out IOT rather than drop HVPS Possible 4 cavity operation 1.0 MV, 150 kW on superconducting cavities 0.3 MV, 100 kW on normal conducting cavities Can save beam if IOTs can be switched individually Amplifier demand is reduced below 170 kW

1.RF Performance E2V IOTs continue to impress Maximum lifetimes now over 50,000 hours 2.Reliability Related Improvements Hardware maintenance and improvements continue Consistent use of one IOT across Diamond 3.RF Noise on Infrared Beamline Case study of RF response to beamline concerns Matter closed 4.Removal of Orbit Glitches Issue noted and resolved before it became a problem 5.Installation of additional cavities: challenges and opportunities Major project driven by cavities but offering opportunities for amplifiers Summary

Thank You!!